Denies 850913 Application for Exemptions from 10CFR50.71(e) for Submittal of Updated Fsar.Comprehensive Exemption Request Must Be Submitted by 851011
ML20133B240
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 10/02/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
References
LSO5-85-10-006, LSO5-85-10-6, NUDOCS 8510030105
Download: ML20133B240 (3)


Text

__

p asog'o UNITED STATES NUCLEAR REGULATORY COMMISSION o

b E

WASHINGTON, D. C. 20555 k.....,o October 2, 1985 Decket No. 50-213/245 LS05-85-10-006 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company

& Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

f

SUBJECT:

EXEMPTION FROM 10 CFR 50.71(e), FSAP UPDATES Re:

Haddam Neck Plant and Hillstone Unit 1 On, February 4,1985, Connecticut Yankee Atomic Power Company (CYAPCO) and Northeast Nuclear Energy Company (NNECO) requested an exemption frcm the schedular reoutrement of 10 CFR 50.71(e)(3)(ii) for submittal of an updated; Safety Analysis Report (FSAR) y Analysis (FDSA) for Haddam Neck and Final Facility Description and Safet for Millstone Unit No. 1.

On April 11, 1985, the NRC granted an exemption from the requirements of 10 CFR 50.71(e) for both Haddam Neck and Millstone Unit No. 1 for a period of six months.

Further, the April 11, 1985 letter states that "any additional exemptions from ccmpliance with 10 CFR 50.71 will be granted by the Director of Licensing, ONRR, only upon the review and approval of a program plan containing schedules or milestones for the submittal of ar updated FSAR."

On September 13,1985, CYAPC0 and NNECO requested another schedular exemption from 10 CFR 50.71(e). CYPACO and NNECO have proposed submittal of initial updates of the FDSA and FSAR by June 20, 1987 and stated that the necessary resource burden (approximately 20,000 person hours) would be explicitly considered in the Integrated Safety Assessment Program (ISAP) efforts.

The staff has reviewed the exemption requests and has concluded that the requests are not responsive to the terms identified in the exemptions granted on April 11, 1985. These exemptions stated that detailed program plans were to be provided in any future exemption request. We have reviewed your September 1985 submittal and conclude that a plan containing the required milestones and schedules, demonstrating a good faith effort to reasonably achieve compliance, has not been provided.

Based upon the above, we deny your September 13, 1985 application for 4

exemptions from 10 CFR 50.71(e) for the Haddam Neck Plant and Hillstone Unit 1, respectively.

pmm ma, e et PDR

1 Mr. John F. Opeka October 2, 1985 i

l The staff has established a set of conditions irdicative of a good faith effort 1

to reasonably achieve ccmpliance under which subsequent requests for further exemption from 10 CFR 50.71(e) would be considered. These conditinns include the submittal of partial updates of FDSA and FSAR sections on a schedule to be i

approved by the staff. These conditions also include the submittel of a r

complete set of systems descriptions and piping and instrumentation dravires 4

{

for each of the units by no later than July 1,1086.

In addition, the staff would expect that under this program a description of the currer.t licensino basis and a major part of the FDSA and FSAR updates would be provided by December 1986 and March 1987 for Millstone Unit 1 and Haddan Heck, respectively.

Selected other partiel updates, including the ongoing evaluations and the accident and transient analyses being developed for Paddam Neck, are to be provided on a schedule consistent with your ISAP initiatives.

Should the licensees reauest exemptions fron 50.71(c) for Millstone Unit 1 and the Haddan Neck Plant, the exemption requests must contain a coinprehensive plan for the submittal of an updated FDSA and FSAP and be submitted by October 11, 1985.

If a conprehensive exemption recuest is not received by that date, j

Pepion I will be notified that the plants are in violation of the regulations and the licensees will be subject to compliance / enforcement actions.

I f

Sincerely, i

Odginal S!gned by

!! nth L. Thompson, Jr.

Hugh L. Thompson, Jr., Director 4

3 Division of 1,.fcensing i

Office of Nuclear Reactor Regulation T

cc: See next pace i

j DISTRI Allif 0N Docket File Local PDRs i

NRC PDP TBarnhart (0) l ORBf5 Peading ACRS(10)

HThompson CMiles, OPA OEl.D SFCY EJordan PDiggs(w/TACs)

FGrimes CGrimes JPartlow JScinto CJarerson 3

FAkstutlewic?

A JZwolinski 4

p DL: Serf h OfLDJScinto (6 OL:0RB4[./ak i

DL:0PD#5

/

DL:0RR#5 CJamerson FAkstulMi'z:tm J7wolinski CGrimes c

p'

]

/r/09 9/ p /rri 9/y>/P5 q$o/P5 7 /0 85 DL:DIR k (n.

i DI DE tchfield HThompson p

j

(/jf85 10 / 3 /85

Mr. John F. Opeka Haddam Neck Plant &

Connecticut Yankee Atomic Power Company Millstone Nuclear Power Station, Northeast Nuclear Energy Company Unit No. 1 cc:

Gerald Garfield, Esquire Kevin McCarthy, Director l

Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Board of Selectmen Northeast Utilities Service Company Town Hall Post Office Box 270 Haddam, Connecticut 06103 Hartford, Connecticut 06141-0270 Superintendent State of Connecticut Haddam Neck Plant Office of Policy and Management RFD #1

. ATTN: Under Secretary Energy Post Office Box 127E Division East Hampton, Connecticut 06424 80 Washington Street Har'tford, Connecticut 06106 Resident inspector Haddam Neck Plant c/o U.S. NRC l

East Haddam Post Office l

East Haddam, Connecticut 06423 l

Regional Administr'ator, Region !

U.S. Nuclear Regulatory Commission l

631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Nuclear Power Station l

P. O. Box 128 Waterford, Connecticut 06385 Resident inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 i

Niantic Connecticut 06357 l

First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385 l

l

-