Discusses Replacement of Health Physics Network (HPN) W/Dedicated Commercial Circuits.Replacement HPN Commercial Circuits Will Be Routed Through Exchange at Telephone Company Central Ofc
ML20129D772
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/11/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8507160648
Download: ML20129D772 (2)


Text

p t

~.

A.

JUL 1 1 985 Docket No. 50-331 Iowa Electric Light and Power Company ATTN: Mr. Lee Liu President and Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA. 52406 Gentlemen:

For_the past several years, NRC Headquarters has been working to provide a Health Physics Network (HPN) that will operate reliably. We are now convinced that the current system cannot be made to operate to our satisfaction.

Therefore, a decision has been made to replace the current HPN telephone system with dedicated commercial circuits. In order to increase the probability of being available in an emergency, each of the replacement HPN commercial circuits will be routed through an exchange at a telephone company Central

.0ffice different from the office that the facility's circuits are routed

- through.

Existing HPN service is currently installed, or ordered to be installed, in the EOF, TSC, Health Physics Office and NRC Resident Inspector's Office. The new system will be located only in the EOF and TSC, and will be removed from the Health Physics Office and the Resident Inspector's Office where currently installed. In order to make these changes, telephone company personnel will need access to all HPN extensions currently installed and any locations in the E0F and TSC where an HPN extension was to be located but is not yet installed.

The following is the priority order in which we will have commercial HPN service installed. 1

1. Install commercial service at those facilities where no HPN service exists.

l

2. Install commercial service at those facilities where no HPN service exists in the EOF but does in the TSC.

l

3. Install commercial service at those facilities where no HPN service exists  !

in the TSC but does in the EOF.

4. Replace existing HPN special circuitry with commercial service at those facilities that currently have HPN special circuitry. Replacement service will be in the E0F and TSC, only. All other locations are to be removed.

85071%

PDR hh ]f i, ,

F l} ()  ;

i i

k l

7

~ h '.-

Iowa Electric Light and Power 2 JUL 1 1 nE5 Company More definitive, plant-by plant schedules will be forthcoming when the dates

.for changes in service are known.

Should you have any questions or need further information Ms. Linda Kers, Emergency Response Coordinator, is the Regional point of contact for assuring coordination between your facilities and the telephone companies. She may be reached on (312) 790-5711.

Sincerely, 4

A. ind, Director

/visionofRadiationSafety i

and Safeguards cc: D. Mineck, Plant Superintendent Nuclear DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Thomas Houvenagle, Iowa Commerce Commission RIII R;II g RII I RIfI ld 1ps f