Advises That 850605 Rev 7 to QA Program Topical Rept Meets Requirements of 10CFR50.54(a) & 50.55(f) & Acceptable. Proposed Rev to Millstone Unit 3 Operations Phase Also Acceptable
ML20134E868
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 08/09/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8508200545
Download: ML20134E868 (2)


Text

,

f l

~

l 1

AUG 0 91985  ;

Docket Nos. 50-213 50-245 50-336 50-423 Northeast Nuclear Energy Company ATTN: Mr. J. F. Opeka

-Senior Vice President - Nuclear Engineering and Operations Group Post Office Box 270 Hartford, Connecticut 06141-0270 Gentlemen:

Subject:

10 CFR 50.54(a)/50.55(f) Quality Assurance Program Description Review - Northeast Utilities Quality Assurance Program Topical Report (Revision 7) for Haddam Neck Plant, Millstone Nuclear Power Station, Unit Nos. I and 2 (Operation) and Millstone Nuclear Power Station, Unit No. 3 (Construction)

Reference:

J. F. Opeka Letter to Dr. T. E. Murley, dated June 5,1985 We have received the above referenced letter, submitted per the requirements of 10 CFR 50.54(a)/50.55(f), which documents twenty-two changes to your Quality Assurance Program Topical Report. The Region I staff has reviewed these changes and found them to be acceptable, as they did not reduce your commitments in the Quality Assurance Program previously accepted by the NRC.

Additionally, as documented in the NRC letter dated Ju?y 3,1985, the Office of Inspection and Enforcement staff reviewed the proposed revision for Millstone Unit 3 operations phase and found it to be acceptable.

The effectiveness of your QA Program implementation will continue to be the subject of routine regional inspections.

If you have any questions concerning the above, please contact Madan Dev at (215) 337-5328.

Sincerely, Orisinal 818"'"BI*

Lee R. Bettertausen Stewart D. Ebneter, Director 8508200545 8 9 gDR ADOCK O 213 fil' u a+

OFFICIAL RECORD COPY QA ACTION - 0001.0.0 08/09/85 10

9 6

g Northeast Nuclear Energy Company 2 cc:

R. Graves, Plant Superintendent E. J. Mroczka, Vice President, Nuclear Operations W. D. Romberg, Station Superintendent D. O. Nordquist, Manager of Quality Assurance V. Papadopoli, Construction Quality Assurance Supervisor R. T. Laudenat, Manager, Generation Facilities Licensing Gerald Garfield, Esquire IE/QUAB Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut bec:

Region I Docket Room (with concurrences)

DRP Section Chief M. Dev, DRS DRP Licensing Assistant (w/ concurrences)

PN O N-R RS De mjd R

E RS n

g RI:DRS Bettenhausen RI:DRS Ebneter S

7/q/85 7/Af/85 9/7/85 3/f/85 0FFICIAL RECORD COPY QA ACTION - 0002.0.0 08/09/85