ML20129H118
| ML20129H118 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, Robinson, 05000000 |
| Issue date: | 04/04/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8507180515 | |
| Download: ML20129H118 (1) | |
Text
r APR 0 41985 Carolina Power and Light Company ATTN:
Mr. E. E. Utley Executive Vice President Power Supply and E~ngineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT:
MEETING
SUMMARY
DOCKET NOS. 50-325, 50-324 AND 50-261 This refers to the meeting conducted at your request in the Region II Office on March 20, 1985.
This meeting was held to discuss proposed 10 CFR 50.54(p) changes to the Brunswick and H. B. Robinson Guard Training and Qualification Plans.
It was our opinion that this meeting was beneficial and has provided a better understanding of the forthcoming plan changes.
In accordance with Section 2.790 of NRC's " Rules of Practice," Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, Original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects
Enclosures:
1.
Meeting Summary 2.
Attendance List cc w/ enc 1:
'P. W. Howe, Vice President C. R. Dietz, Plant General Manager G. P. Beatty, Jr., Manager R. E. Morgan, Plant General Manager bcc w/encls:
Document Control Desk Resident Inspector State of North Carolina State of South Carolina RI RII RII
~~
,I /./
)
/
l RII ('h 0
COPE'fliy:pw d'tiire K
JPShhr PEreb/jckson 03/10/85
@/85 03$.4/85 03/g /85 03/pl/85 RII t
8507180515 850404 D
DMVerrelli PDR ADOCK 05000261 03/vf/85 F