ML20134A97511 August 1975PN-III-75-027:during Predocket Insp,Several QA Deviations Identified Leading to Conclusion & Recommendation to Reject Tendered Application
ML20140F5934 February 1977PNO-77-022:on 770204,reactor Scrammed When Torus Temp Increased to 110 F.Caused by Two Target Rock Safety/Relief Valves Opening W/O Reseating Until Pressure Decreased to 100 Psig.Reactor Placed in Cold Shutdown
ML20140G32527 November 1974PNO-74-136:on 741124,during Startup Tests of Main Steam Relief Valves at 75% Power,Target Rock Safety Relief Valve Failed to Reseat.Cause Not Stated.Valve Will Be Replaced
ML20140G34321 July 1975PNO-75-053:on 750720,during Attempt to Reseat Leaking Relief Valve D,Valve Manually Actuated & Did Not Reseat.Reactor Manually Scrammed.Investigation Continuing
ML20212N55825 August 1986PNS-I-86-013:on 860824,Boston Globe Newspaper Received Bomb Threat Re Plants.Police Notified & Bomb Search Procedures Instituted W/Negative Results
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%27 September 1985PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%
PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage27 September 1985PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered DamageHigh winds
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
PNO-II-85-070, utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm23 July 1985PNO-II-85-070:utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm
PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed24 July 1985PNO-II-85-070A:on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If NeededHigh winds
PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm26 July 1985PNO-II-85-070B:monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm
PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures29 August 1985PNO-II-85-086:on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures
PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures30 August 1985PNO-II-85-086A:on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures
PNO-II-85-092, on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power26 September 1985PNO-II-85-092:on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power
PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 85111819 November 1985PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118
PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path22 November 1985PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path
PNO-II-86-074, on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry14 October 1986PNO-II-86-074:on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
PNO-III-80-032, on 800219,correspondents from ABC 20/20 Program Will Interview Regional Director & Other Members Re NRC Investigation Into Allegations of Falsification of Qualification Records of Personnel Doing Design Work19 February 1980PNO-III-80-032:on 800219,correspondents from ABC 20/20 Program Will Interview Regional Director & Other Members Re NRC Investigation Into Allegations of Falsification of Qualification Records of Personnel Doing Design Work
PNO-III-80-054, on 800318,licensee Informed Region 3 That Channel 7 News in Detroit,Mi Plans to Televise 800321 Interview W/Site Contractor Employees Re Allegations of Improper Receipt Insp of Small Bore Pipe19 March 1980PNO-III-80-054 :on 800318,licensee Informed Region 3 That Channel 7 News in Detroit,Mi Plans to Televise 800321 Interview W/Site Contractor Employees Re Allegations of Improper Receipt Insp of Small Bore Pipe
PNO-III-82-062, on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette30 June 1982PNO-III-82-062:on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette
PNO-III-82-068, on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated22 July 1982PNO-III-82-068:on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated
PNO-III-82-071, on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder30 July 1982PNO-III-82-071:on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder
PNO-III-85-050, on 850621,initial Criticality Achieved within Two Steps of Estimated Critical Position.Control Rods Withdrawn to Criticality21 June 1985PNO-III-85-050:on 850621,initial Criticality Achieved within Two Steps of Estimated Critical Position.Control Rods Withdrawn to Criticality
PNO-III-85-053, on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs26 June 1985PNO-III-85-053:on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs
PNO-III-85-055, on 850709,reactor Tripped on Low Water Level. Caused by Operator Inattentiveness to Level Indicator.No ECCS Injection Occurred10 July 1985PNO-III-85-055:on 850709,reactor Tripped on Low Water Level. Caused by Operator Inattentiveness to Level Indicator.No ECCS Injection OccurredReactor Vessel Water Level
PNO-III-85-058, on 850702,reactor Brought to Criticality W/O Shift Supervisor Realizing Incident.Caused by Reactor Operator Failing to Follow Proper Procedures for Moving Control Rods in Full Out Position.Incident Being Reviewed15 July 1985PNO-III-85-058:on 850702,reactor Brought to Criticality W/O Shift Supervisor Realizing Incident.Caused by Reactor Operator Failing to Follow Proper Procedures for Moving Control Rods in Full Out Position.Incident Being Reviewed
PNO-III-85-058A, on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing17 July 1985PNO-III-85-058A:on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing
PNO-III-85-063, on 850723,reactor Shut Down to Repair Thrust Bearing Housing on Feedwater Pump,Damaged During 850722 Demonstration Testing.Further Exam Underway24 July 1985PNO-III-85-063:on 850723,reactor Shut Down to Repair Thrust Bearing Housing on Feedwater Pump,Damaged During 850722 Demonstration Testing.Further Exam Underway
PNO-III-85-063A, investigation Concluded That Vibration in South Reactor Feeder Pump Turbine,Plus Inadequate Securing of Outboard Bearing Cap Caused Turbine Failure.Study of Problem Continuing5 August 1985PNO-III-85-063A:investigation Concluded That Vibration in South Reactor Feeder Pump Turbine,Plus Inadequate Securing of Outboard Bearing Cap Caused Turbine Failure.Study of Problem Continuing
PNO-III-85-066, on 850729,low Svc Water Flow Alarm Received During Surveillance Testing of Div I Diesel Generator. Generator Manually Tripped.Caused by Closed Bypass Valve in Line Returning Water to Reservoir.Investigation Underway30 July 1985PNO-III-85-066:on 850729,low Svc Water Flow Alarm Received During Surveillance Testing of Div I Diesel Generator. Generator Manually Tripped.Caused by Closed Bypass Valve in Line Returning Water to Reservoir.Investigation Underway
PNO-III-85-067, on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 85070231 July 1985PNO-III-85-067:on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 850702
PNO-III-85-067A, on 850809,licensee Will Resume Low Power Testing.Region III Approved Util Corrective Action Program Submitted on 850807,in Response to 850702 Premature Criticality.Plant Still Restricted to 5% Power9 August 1985PNO-III-85-067A:on 850809,licensee Will Resume Low Power Testing.Region III Approved Util Corrective Action Program Submitted on 850807,in Response to 850702 Premature Criticality.Plant Still Restricted to 5% Power
PNO-III-85-070, on 850806,Monroe County Board of Commissioners Requested Full Investigation of Operational Procedures & Employee Credentials Due to 850702 Unplanned Criticality Not Reported to NRC Until 8507158 August 1985PNO-III-85-070:on 850806,Monroe County Board of Commissioners Requested Full Investigation of Operational Procedures & Employee Credentials Due to 850702 Unplanned Criticality Not Reported to NRC Until 850715
PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry26 August 1985PNO-III-85-076:on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry
PNO-III-85-077, on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed5 September 1985PNO-III-85-077:on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed
PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation19 September 1985PNO-III-85-083:on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation
PNO-III-85-095, on 851113,unusual Noise & Vibration Observed in Emergency Diesel Generator.Operator Manually Tripped Diesel.Preliminary Evaluation Indicates Damage to Connecting Rod Bearing for Upper Crankshaft & Upper Piston Skirt14 November 1985PNO-III-85-095:on 851113,unusual Noise & Vibration Observed in Emergency Diesel Generator.Operator Manually Tripped Diesel.Preliminary Evaluation Indicates Damage to Connecting Rod Bearing for Upper Crankshaft & Upper Piston Skirt
PNO-III-85-095A, on 851201,during Reassembly of Steam Generator 13,discontinuities Observed on Three Connecting Rod Journals.Vendor Will Supply Documentation.Investigation Continuing.Startup Projected for 8512113 December 1985PNO-III-85-095A:on 851201,during Reassembly of Steam Generator 13,discontinuities Observed on Three Connecting Rod Journals.Vendor Will Supply Documentation.Investigation Continuing.Startup Projected for 851211
PNO-III-85-095B, during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated4 December 1985PNO-III-85-095B:during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated
PNO-III-85-095C, on 851212,diesel Generator 14 Tripped on Low Lube Oil Pressure During Test Run.Bearing Failure & Erratic Behavior of Svc Water Pump Under Investigation as Possible Causes.Generator Will Be Monitored12 December 1985PNO-III-85-095C:on 851212,diesel Generator 14 Tripped on Low Lube Oil Pressure During Test Run.Bearing Failure & Erratic Behavior of Svc Water Pump Under Investigation as Possible Causes.Generator Will Be Monitored