Issue date | Title | Topic | |
---|---|---|---|
ML20134A975 | 11 August 1975 | PN-III-75-027:during Predocket Insp,Several QA Deviations Identified Leading to Conclusion & Recommendation to Reject Tendered Application | |
ML20140F593 | 4 February 1977 | PNO-77-022:on 770204,reactor Scrammed When Torus Temp Increased to 110 F.Caused by Two Target Rock Safety/Relief Valves Opening W/O Reseating Until Pressure Decreased to 100 Psig.Reactor Placed in Cold Shutdown | |
ML20140G325 | 27 November 1974 | PNO-74-136:on 741124,during Startup Tests of Main Steam Relief Valves at 75% Power,Target Rock Safety Relief Valve Failed to Reseat.Cause Not Stated.Valve Will Be Replaced | |
ML20140G343 | 21 July 1975 | PNO-75-053:on 750720,during Attempt to Reseat Leaking Relief Valve D,Valve Manually Actuated & Did Not Reseat.Reactor Manually Scrammed.Investigation Continuing | |
ML20212N558 | 25 August 1986 | PNS-I-86-013:on 860824,Boston Globe Newspaper Received Bomb Threat Re Plants.Police Notified & Bomb Search Procedures Instituted W/Negative Results | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% | 27 September 1985 | PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% | |
PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage | 27 September 1985 | PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage | High winds |
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | 9 October 1987 | PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | 9 November 1988 | PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | |
PNO-II-85-070, utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm | 23 July 1985 | PNO-II-85-070:utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm | |
PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed | 24 July 1985 | PNO-II-85-070A:on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed | High winds |
PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm | 26 July 1985 | PNO-II-85-070B:monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm | |
PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures | 29 August 1985 | PNO-II-85-086:on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures | |
PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures | 30 August 1985 | PNO-II-85-086A:on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures | |
PNO-II-85-092, on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power | 26 September 1985 | PNO-II-85-092:on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power | |
PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 | 19 November 1985 | PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 | |
PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path | 22 November 1985 | PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path | |
PNO-II-86-074, on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry | 14 October 1986 | PNO-II-86-074:on 861013,licensee Issued News Release Stating That Investigation of Alleged Offsite Drug Use Resulted in Dismissal or Voluntary Resignation of 13 Security Officers or Employees,Including Supervisor of Security at Surry | |
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3 | 29 July 1987 | PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3 | |
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted | 30 July 1987 | PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted | |
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | 13 October 1987 | PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
PNO-III-80-032, on 800219,correspondents from ABC 20/20 Program Will Interview Regional Director & Other Members Re NRC Investigation Into Allegations of Falsification of Qualification Records of Personnel Doing Design Work | 19 February 1980 | PNO-III-80-032:on 800219,correspondents from ABC 20/20 Program Will Interview Regional Director & Other Members Re NRC Investigation Into Allegations of Falsification of Qualification Records of Personnel Doing Design Work | |
PNO-III-80-054, on 800318,licensee Informed Region 3 That Channel 7 News in Detroit,Mi Plans to Televise 800321 Interview W/Site Contractor Employees Re Allegations of Improper Receipt Insp of Small Bore Pipe | 19 March 1980 | PNO-III-80-054 :on 800318,licensee Informed Region 3 That Channel 7 News in Detroit,Mi Plans to Televise 800321 Interview W/Site Contractor Employees Re Allegations of Improper Receipt Insp of Small Bore Pipe | |
PNO-III-82-062, on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette | 30 June 1982 | PNO-III-82-062:on 820629,three-nonlicensed Stationmen at Quad-Cities Station Identified by Alleger as Users of Marijuana.On Same Day,During Search of Incoming Truck, Security Personnel Discovered Marijuana Cigarette | |
PNO-III-82-068, on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated | 22 July 1982 | PNO-III-82-068:on 820503,allegations from Former Employee of HVAC Contractor Received Re False or Incomplete QA Documentation for HVAC Work at Sites.Special Insp of Zack Co & Facilities Initiated | |
PNO-III-82-071, on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder | 30 July 1982 | PNO-III-82-071:on 820729,received Part 21 Rept Via Telcon W/Zack Co Re Documentation Discrepancies for Welds Made to HVAC Components at La Salle & Possibly at Clinton & Midland.Welder of Record May Not Be Actual Welder | |
PNO-III-85-050, on 850621,initial Criticality Achieved within Two Steps of Estimated Critical Position.Control Rods Withdrawn to Criticality | 21 June 1985 | PNO-III-85-050:on 850621,initial Criticality Achieved within Two Steps of Estimated Critical Position.Control Rods Withdrawn to Criticality | |
PNO-III-85-053, on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs | 26 June 1985 | PNO-III-85-053:on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs | |
PNO-III-85-055, on 850709,reactor Tripped on Low Water Level. Caused by Operator Inattentiveness to Level Indicator.No ECCS Injection Occurred | 10 July 1985 | PNO-III-85-055:on 850709,reactor Tripped on Low Water Level. Caused by Operator Inattentiveness to Level Indicator.No ECCS Injection Occurred | Reactor Vessel Water Level |
PNO-III-85-058, on 850702,reactor Brought to Criticality W/O Shift Supervisor Realizing Incident.Caused by Reactor Operator Failing to Follow Proper Procedures for Moving Control Rods in Full Out Position.Incident Being Reviewed | 15 July 1985 | PNO-III-85-058:on 850702,reactor Brought to Criticality W/O Shift Supervisor Realizing Incident.Caused by Reactor Operator Failing to Follow Proper Procedures for Moving Control Rods in Full Out Position.Incident Being Reviewed | |
PNO-III-85-058A, on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing | 17 July 1985 | PNO-III-85-058A:on 850716,confirmatory Action Ltr Issued Documenting Util Commitment to Restrict Power Level to 5%, Pending Completion of Evaluation of 850702 Inadvertent Criticality Incident.Investigation Continuing | |
PNO-III-85-063, on 850723,reactor Shut Down to Repair Thrust Bearing Housing on Feedwater Pump,Damaged During 850722 Demonstration Testing.Further Exam Underway | 24 July 1985 | PNO-III-85-063:on 850723,reactor Shut Down to Repair Thrust Bearing Housing on Feedwater Pump,Damaged During 850722 Demonstration Testing.Further Exam Underway | |
PNO-III-85-063A, investigation Concluded That Vibration in South Reactor Feeder Pump Turbine,Plus Inadequate Securing of Outboard Bearing Cap Caused Turbine Failure.Study of Problem Continuing | 5 August 1985 | PNO-III-85-063A:investigation Concluded That Vibration in South Reactor Feeder Pump Turbine,Plus Inadequate Securing of Outboard Bearing Cap Caused Turbine Failure.Study of Problem Continuing | |
PNO-III-85-066, on 850729,low Svc Water Flow Alarm Received During Surveillance Testing of Div I Diesel Generator. Generator Manually Tripped.Caused by Closed Bypass Valve in Line Returning Water to Reservoir.Investigation Underway | 30 July 1985 | PNO-III-85-066:on 850729,low Svc Water Flow Alarm Received During Surveillance Testing of Div I Diesel Generator. Generator Manually Tripped.Caused by Closed Bypass Valve in Line Returning Water to Reservoir.Investigation Underway | |
PNO-III-85-067, on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 850702 | 31 July 1985 | PNO-III-85-067:on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 850702 | |
PNO-III-85-067A, on 850809,licensee Will Resume Low Power Testing.Region III Approved Util Corrective Action Program Submitted on 850807,in Response to 850702 Premature Criticality.Plant Still Restricted to 5% Power | 9 August 1985 | PNO-III-85-067A:on 850809,licensee Will Resume Low Power Testing.Region III Approved Util Corrective Action Program Submitted on 850807,in Response to 850702 Premature Criticality.Plant Still Restricted to 5% Power | |
PNO-III-85-070, on 850806,Monroe County Board of Commissioners Requested Full Investigation of Operational Procedures & Employee Credentials Due to 850702 Unplanned Criticality Not Reported to NRC Until 850715 | 8 August 1985 | PNO-III-85-070:on 850806,Monroe County Board of Commissioners Requested Full Investigation of Operational Procedures & Employee Credentials Due to 850702 Unplanned Criticality Not Reported to NRC Until 850715 | |
PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry | 26 August 1985 | PNO-III-85-076:on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry | |
PNO-III-85-077, on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed | 5 September 1985 | PNO-III-85-077:on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed | |
PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation | 19 September 1985 | PNO-III-85-083:on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation | |
PNO-III-85-095, on 851113,unusual Noise & Vibration Observed in Emergency Diesel Generator.Operator Manually Tripped Diesel.Preliminary Evaluation Indicates Damage to Connecting Rod Bearing for Upper Crankshaft & Upper Piston Skirt | 14 November 1985 | PNO-III-85-095:on 851113,unusual Noise & Vibration Observed in Emergency Diesel Generator.Operator Manually Tripped Diesel.Preliminary Evaluation Indicates Damage to Connecting Rod Bearing for Upper Crankshaft & Upper Piston Skirt | |
PNO-III-85-095A, on 851201,during Reassembly of Steam Generator 13,discontinuities Observed on Three Connecting Rod Journals.Vendor Will Supply Documentation.Investigation Continuing.Startup Projected for 851211 | 3 December 1985 | PNO-III-85-095A:on 851201,during Reassembly of Steam Generator 13,discontinuities Observed on Three Connecting Rod Journals.Vendor Will Supply Documentation.Investigation Continuing.Startup Projected for 851211 | |
PNO-III-85-095B, during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated | 4 December 1985 | PNO-III-85-095B:during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated | |
PNO-III-85-095C, on 851212,diesel Generator 14 Tripped on Low Lube Oil Pressure During Test Run.Bearing Failure & Erratic Behavior of Svc Water Pump Under Investigation as Possible Causes.Generator Will Be Monitored | 12 December 1985 | PNO-III-85-095C:on 851212,diesel Generator 14 Tripped on Low Lube Oil Pressure During Test Run.Bearing Failure & Erratic Behavior of Svc Water Pump Under Investigation as Possible Causes.Generator Will Be Monitored |