PNO-III-85-067, on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 850702

From kanterella
Jump to navigation Jump to search
PNO-III-85-067:on 850730,licensee Announced That Low Power Testing Would Not Resume Until Various Equipment & Procedural Difficulties Resolved.Shutdown Caused by Premature Criticality on 850702
ML20133D081
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1985
From: Chrissotimos, Wright
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-85-067, PNO-III-85-67, NUDOCS 8508070220
Download: ML20133D081 (1)


D tb d PRELIMINARY NOTIFICATION OF EVENT OR UNUSUA'_ OCCURRENCE--PNO-III-85-67 Date July 31, 1985 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety er public interest significance. The information is as initially received without veri-fication or evaluation, and is basically all that is known by the staff on this date.

Facility: Detroit Edison Company Licensee Emergency Classification:

Fermi 2 Nuclear Power Plant Notification of an Unusual Event Newport, MI 48166 Alert Site Area Emergency .

(Docket No. 50-341) General Emergency y Not Applicable

Subject:

TEMPORARY HALT TO LOW POWER TESTING

, The licensee announced on July 30, 1985, that it did not plan to resume its low power testing activities "until various equipment and procedural difficulties that it has experienced in recent days have been resolved." (

Reference:

" Inadvertent Criticality," PNO-III-58 and 58A;

" Shutdown to Repair Feedwater Pump," PNO-III-63; and "Both Diesel Generators Inoperable,"

PNO-III-66.)

The plant has been shut down since July 23, 1983, for examination and repair of a feedwater pump. Previously, the unit was restricted to 5 per cent power under a Confirmatory Action Letter (CAL), issued July 16, 1985, by Region III (Chicago) as a result of the premature criticality incident which occurred July 2, 1985.

, Region III and the resident inspectors are monitoring the licensee's activities.

l The licensee stated, in its news announcement issued July 30, 1985, that it does not intend to resume testing activities until all problems have been resolved and "the NRC l concurs with the actions taken."

l The State of Michigan will be informed.

! Region III was informed of the licensee's announcement at 4:00 p.m., July 30,1985.

l This information is current as of 10:00 a.m., July 31, 1985 CONTACT: $ t Yh olimos j FTS 388-5695 FTS 388-5656 l

DISTRIBUTI N:

H. St.

  • MNBB/).'60 Phillips/).*8 E/W//.Y8 Willste /)l52 Chairman alladino ED0 NRR IE NMSS Com. Roberts PA OIA RES Com. Asselstine MPA AE0D Com. Bernthal ELD AirRightsd.T). MAIL:

Com. Zech SP INP0 //J ADM:DMB SECY NSAC // OV ~

D0T: Trans Only ACRS

  • CA j PDR Regions I//g, IIg, IV f!4), V /,' Applicable t L Resident Site . gd, icensee (