Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML00372363513 June 2000Summary of May 23, 2000, Meeting with Entergy Regarding Equipment Qualification (EQ) Calculations Review for Arkansas Nuclear One Unit (ANO-1)
ML01019004716 January 200111/29/00 Summary of License Renewal Meeting Between the NRC and the NEI License Renewal Working Group; ANO-1 SNC for Hatch Nuclear Plant, Units 1 and 2 and for FPL for Turkey Point Units 3 and 4
ML0203202021 February 2002Meeting Summary with Entergy Operations, Inc. to Discuss the Licensee'S Probabilistic Risk Assessment Used to Support the Power UprateProbabilistic Risk Assessment
ML02081075619 March 2002Operator Licensing Workshop Meeting SummaryProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
ML0210707274 April 2002Telephone Conference with Waterford Station Unit 3, on Planned Reactor Vessel Head and Vessel Head Pentrations InspectionsBoric Acid
ML02107073917 April 2002End of Cycle Meeting Summary with Entergy Operations, Inc to Discuss Performance Results of River Bend Station
ML02109034817 April 2002Meeting with Entergy Operations Re River Bend End of Cycle
ML02114055824 April 2002Meeting Summary with Entergy Operations, Inc End-of-Cycle Performance
ML0212203621 May 2002Meeting Summary with Entergy Operartions, Inc to Review Waterford 3 of Refuel 11Boric Acid
ML02130010329 May 2002Attachment Arkansas Nuclear One Unit 2 Head Inspection Summary for 2R15Boric Acid
Through Wall Leak
ML0213004742 May 2002Attachment 10 Faxed on May 2, 2002 (Docket Nos 50-313 and 50-368). Summary of Three April 2002 Conference Calls with Licensee on Reactor Pressure Vessel Head Inspection Plans & Results at Arkansas Unit One, Units 1 & 2Boric Acid
Non-Destructive Examination
Through-Wall Leak
Through Wall Leak
ML02240084211 April 2002Advisory Committee on Reactor Safeguards 491st Meeting CRDM Penetration Cracking & RPV Head Degradation Room T-2B3, 11545 Rockville Pike, Rockville, MD, 04/11/2002 - Status ReportBoric Acid
ML02303058125 October 2002Summary of 10/16/2002 Meeting Re. Extended Power Uprate
ML0231002766 November 2002Summary of Meeting with Entergy Operations, Inc., Re Alternative Source Term License Amendment Application
ML02316021329 October 2002Meeting Summary Re Discussion of Backfit Claim Re Use of Manual Actions to Meet Fire Protection RequirementsHot Short
Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Exemption Request
Earthquake
Fire Protection Program
Fire Watch
Scaffolding
Backfit
ML0231702707 November 2002Meeting Summary with ANO-1 Discussion of Reactor Vessel Head Weld RepairsBoric Acid
Weld Overlay
Nondestructive Examination
ML0234005306 December 200212/6/2002, ANO-1, Unit 1, Summary of Conference Calls on Steam Generator (SG) Inspection Results During 1R17
ML02360004926 December 2002Summary of Meeting Held on September 24, 2002, with Entergy Operations Inc., to Discuss Issues Related to Decommissioning FundingDecommissioning Funding Plan
ML0309802358 April 2003Meeting Summary for End-of-Cycle Performance Assessment of Waterford 3, Attendance List & Copy of Slides PresentedTroxler Moisture Density Gauge
ML03139062117 April 2003Summary of Meeting for Arkansas Nuclear One End-of-Cycle Performance Assessment
ML03140036017 April 2003Meeting Summary for Annual Performance Assessment for River Bend Station
ML0318902592 July 2003Summary of Regulatory Conference with Entergy Operations, Inc. River Bend StationSafe Shutdown
High winds
Fire Barrier
Earthquake
ML03199008517 July 2003Regulatory Conference with Entergy Operations, Inc., Concerning Arkansas Nuclear One Facility
ML03205022923 July 2003Summary of 6/17/03 Public Meeting to Discuss Relaxation from the Vessel Head Inspection Order
ML03237052922 August 2003Summary of Nrc/Entergy Operations, Inc. Management Meeting
ML03241045029 August 2003Summary of Meeting with Entergy to Discuss Its Relaxation Requests from the Vessel Head Inspection Order
ML0400500823 October 2002Summary of Meeting with ANOSafe Shutdown
Emergency Lighting
ML04051042620 February 2004Summary of Meeting with Entergy Operations, Inc. Discussing Arkansas Nuclear One Corrective Actions
ML04063105526 February 2004Summary of Entergy Operations, Inc. Presentation of Extended Power Uprate
ML04085043731 March 2004Summary of Meeting with the Boiling Water Reactors Owners Group and Nuclear Energy Institute Re Recommendations for Resolving Generic Safety Issue 189
ML0410505229 April 2004Meeting Summary with Entergy Operations, Inc. Re Arkansas Nuclear One End-of-Cycle Performance Assessment
ML04112018320 April 2004Meeting Summary with Entergy Operations, Inc Re Annual Performance Assessment for River Bend Station
ML04120044127 April 2004Summary of Telecommunication with Entergy Operations Inc. (Entergy) to Discuss the Response to the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (RAI)Probabilistic Risk Assessment
ML0412403603 May 2004Meeting Summary of ANO1 - April 16, 2004 Meeting with Entergy to Discuss Relief Requests R&R-005 and -006
ML0419501528 July 2004Summary of Telecommunication with Entergy Operations Inc., (Entergy) to Discuss the Response to Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais)
ML04212058829 July 2004Meeting Summary for End-of-Cycle Performance Assessment for Waterford Steam Electric Station, Unit 3Troxler Moisture Density Gauge
ML04232063819 August 2004Summary of 08/10/04 Meeting with Arkansas Nuclear One Plant Management to Discuss Improvements to Their Fire Protection ProgramFire Protection Program
ML04239048926 August 2004Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals
ML0428001404 October 2004Meeting Summary for the September 29, 2004, Public Meeting to Discuss General Engineering Related Topics
ML0433703862 December 2004Management Meeting with NRC Re Performance of Arkansas Nuclear One and Grand Gulf Nuclear StationSafe Shutdown
ML05021013117 January 200511/09-10/2004 Summary of Meeting with B&W Owners Group Re Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg LOCA
ML05049014217 February 2005Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents
ML0509104741 April 20053-30-05 Meeting Summary for End-of Cycle Performance Assessment for Waterford Steam Electric Station, Unit 3Troxler Moisture Density Gauge
ML05103040913 April 2005Summary of Meeting with Entergy Operations, Inc. River Bend Station Performance and Improvement Initiatives
ML05322068517 November 2005Nrc/Entergy Operations, Inc. Management Meeting 11/10/05
ML0534105016 December 2005River Bend - Meeting Summary with Entergy Operations, Inc. Amendment Request for Use of Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations
ML0605903679 March 2006Summary of Conference Call with Entergy Operations, Inc. to Discuss Replacement Steam GeneratorsFlow Induced Vibration
ML06108008221 April 2006Summary of Meeting Held on April 6, 2006, Emergency Diesel Generator Fuel Oil Storage Project
ML06144008324 May 2006Summary of 05/17/2006 Annual Performance Assessment Public Meeting River Bend Station
ML06150009430 May 2006Summary of Meeting with Entergy Operations Re Waterford Steam Electric Station, Unit 3, Annual Performance AssessmentTroxler Moisture Density Gauge