MONTHYEARML0213004742002-05-0202 May 2002 Attachment 10 Faxed on May 2, 2002 (Docket Nos 50-313 and 50-368). Summary of Three April 2002 Conference Calls with Licensee on Reactor Pressure Vessel Head Inspection Plans & Results at Arkansas Unit One, Units 1 & 2 Project stage: Other ML0214006192002-05-29029 May 2002 Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 15-Day Response Project stage: Other ML0213604202002-05-29029 May 2002 Conference Call with the Licensee on the Reactor Pressure Vessel Head Inspection Plans and Results Arkansas Unit One, Units 1 and 2 (TAC MB4524 and MB4525) Project stage: Other ML0213001032002-05-29029 May 2002 Attachment Arkansas Nuclear One Unit 2 Head Inspection Summary for 2R15 Project stage: Request ML0217602842002-07-11011 July 2002 Withholding from Public Disclosure, Wesdyne Report WDI-TJ-007-02-P, (TACs MB4524 & MB4525) Project stage: Other ML0232904122002-11-22022 November 2002 Request for Additional Information, Bulletin 2002-00, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity 60-Day Response Project stage: RAI 2002-05-02
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23257A2412023-09-19019 September 2023 Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22215A1912022-08-0909 August 2022 Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22151A1302022-06-0202 June 2022 May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves ML22125A2452022-05-0909 May 2022 May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis ML22003A0562022-01-10010 January 2022 Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21117A0262021-05-0505 May 2021 Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate ML20337A1572020-12-0808 December 2020 Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20287A4012020-10-26026 October 2020 Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond ML20260G9992020-09-16016 September 2020 Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20153A2252020-06-0404 June 2020 April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2 ML19182A0332019-07-10010 July 2019 Summary of Teleconference with Entergy Operations, Inc. Regarding Proposed License Amendment Request Revised Fuel Handling Analysis and Adoption of Various TSTF Travelers for Arkansas Nuclear One, Unit 2 ML18176A1312018-06-21021 June 2018 Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML16109A3642016-04-18018 April 2016 Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One ML15348A1882016-01-0606 January 2016 Summary of October 28, 2015, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc. to Discuss Flood Analysis Associated with Arkansas Nuclear One, ML15267A4182015-09-24024 September 2015 Summary of Meeting to Discuss Arkansas Nuclear One Performance Improvement ML15225A2542015-08-14014 August 2015 Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15007A4782015-01-15015 January 2015 Summary of July 15-18, 2013, Arkansas Nuclear One, Unit 2, Audit Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 ML14356A1722014-12-22022 December 2014 Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing Basis ML14197A5832014-09-18018 September 2014 Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1 ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14213A4272014-09-12012 September 2014 Summary of July 16, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers Nuclear Regulatory Commission, and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Arkansas Nuclear One, Units 1 and 2 ML14162A3712014-06-26026 June 2014 5/22/2014 Summary of Meeting with Entergy Operations, Inc. to Discuss Flooding Hazard Reevaluation Extension Request for Arkansas Nuclear One, Units 1 and 2; Near-Term Task Force Recommendation 2.1 ML14170A0602014-06-23023 June 2014 Summary of 5/27/2014 Conference Call Regarding Refueling Outage Steam Generator Inspection ML14163A0502014-06-13013 June 2014 Summary of Conference Call with Arkansas Nuclear One, Unit 2, Regarding the Spring Steam Generator Inspections ML14128A5122014-05-0909 May 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Unit 1 Dropped Stator ML13172A0292013-07-0909 July 2013 Summary of 5/10/2013 Conference Call with Entergy Operations, Inc., 2013 Steam Generator Tube Inspections at Arkansas Nuclear One, Unit 1 ML13142A2272013-05-22022 May 2013 Summary of Public Meeting to Discuss Results of Augmented Inspection at Arkansas Nuclear One ML13043A6112013-02-26026 February 2013 Summary of 1/25/2013 Conference Call Regarding the Upcoming 2013 Steam Generator Tube Inspections ML12276A3012012-10-12012 October 2012 Summary of October 25, November 8, and November 10, 2011, Conference Calls Related to Fall 2011 Refueling Outage Steam Generator Tube Inspections ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12240A4162012-08-27027 August 2012 Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues ML12222A0312012-08-0808 August 2012 Arkansas Monitoring Call Summary ML12171A3662012-07-16016 July 2012 6/12-13/2012 Summary of Meeting at the Plant Site in Russellville, AR, to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1202704162012-02-13013 February 2012 1/26/2012 - Summary of Meeting with Entergy and Exelon to Discuss Recent Once-Through Steam Generator Inservice Inspection Results ML1127903812011-11-0101 November 2011 Summary of Meeting with Entergy Operations, Inc. to Discuss Amendment Request to Revise Arkansas Nuclear One, Unit 2's Fuel Handling Accident (FHA) Analysis and Several TSTFs 51, 272, 286, and 471 That Support FHA ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc 2023-09-19
[Table view] |
Text
SUBJECT:
SUMMARY
OF THREE APRIL 2002 CONFERENCE CALLS WITH THE LICENSEE ON THE REACTOR PRESSURE VESSEL HEAD INSPECTION PLANS AND RESULTS AT ARKANSAS UNIT ONE, UNITS 1 AND 2 (ANO-1&2)
(TAC MB4525)
During the month of April 2002, the NRC staff and the license( )n the licensee's reactor pressure vessel head inspection plans a - - "h of those calls follows. _30 April 17, 2002 Due to questions from the Region IV inspectors on the process used by the licensee to demonstrate the surface or volumetric examination method at ANO-2, the licensee agreed to provide a demonstration report (with a summary) within 30 days after restart. This demonstration report will include a road map and supporting documentation to characterize the demonstration activities and results.
April 19, 2002 Due to questions from the Region IV inspectors on the need for eddy-current (EC) examinations in addition to ultrasonic testing (UT) examinations at ANO-2, the licensee repeated their commitment in response to Bulletin 2002-01, that they will perform inspections in accordance with Generic Letter (GL) 88-05 (visual), and under the head volumetric examinations of 100% of the vessel head penetrations. The licensee indicated that the UT examinations are capable of detecting a leak path, and that EC examinations were only being relied upon for characterizing the length of any flaws that are detected by UT examinations.
The licensee assured the staff that the UT examinations will be able to detect all significant indications and that the basis for this assertion will be provided in their demonstration report, which will be provided within 30 days after restart. The licensee confirmed that ANO-2 has not experienced any conoseal leaks or any other leaks from external sources that would leave boric acid on top of the head. The licensee concluded that the absence of prior leakage, combined with the capability of the UT examinations to determine through-wall cracks, addresses the Bulletin 2002-01 concern of reactor pressure vessel head degradation. The licensee was not aware of information that the regional inspector obtained regarding apparent indications on two control element drive mechanism (CEDM) nozzles; however, the licensee agreed to follow-up on the information.
April 25, 2002 On April 25, 2002, the licensee provided the attached reactor pressure vessel head inspection summary for 2R15, which consists of the inspection plan, the inspection results, the follow-up actions, and three figures. The licensee also indicated that they inspected the head flange and performed GL 88-05 visual inspections (from the top of the head to the head flange). The licensee performed UT examinations of all vessel head penetrations, and some penetrations received EC examinations. Due to indications from the UT examination results, the licensee did additional non-destructive examination (NDE) on three nozzles. Liquid dye-penetrant testing Attachment 10
(PT) was performed, which included the J-groove weld area and extended 90 to 180 degrees around the circumference on the low end of the CEDM nozzle. The PT resulted in no indications. Therefore, the licensee concluded that all 90 head penetrations have pressure boundary integrity with no indications of primary water stress corrosion cracking (PWSCC) and no through-wall leaks that could cause head wastage. In addition, no signs of leakage were detected above the head on the insulation. Only very minor occasional boric acid staining was observed (likely from historical venting).
The licensee also verbally responded to five staff questions that had previously been provided to them, as follows:
Q1. It was indicated that one nozzle at ANO-1 has been repaired due to leakage. Please discuss whether there were opportunities to discover a cavity outside the nozzle during the repair process (through pre- or post-repair inspections, through preparation of the area for repair, etc.).
Al. The licensee performed a visual exam on nozzle #56 with a remote crawler and found a small amount of boron which they characterized as a "trail". The licensee ground the J-groove weld and performed a repair. In addition, the licensee stated that there was no evidence of a cavity and the amount of boron was very small.
Q2. Has the boric acid on the insulation at ANO-2 been cleaned? If not, are there any plans to clean it?
A2. The licensee has seen a slight powder which resulted from venting of the CEDMs in previous outages. Video from the most recent inspection shows no boron with the exception of the slight power, therefore, the licensee concluded that there was no need to clean the insulation.
- 03. Are any actions taken to prevent/minimize the amount of boric acid that is sprayed onto the head during the venting operation? Please describe these actions.
A3. The vent line is now piped off to prevent boric acid from being sprayed onto the head during venting operations.
Q4. With regard to future inspection plans, please define the type of evaluation that is stated in the following response to question 1.D for both ANO units: "If throughwall or throughweld cracks are found and a concentration of boron is found protruding through the annulus region of the penetration, an evaluation will be performed to determine if there is potential for wastage of the adjacent vessel material."
A4. The licensee stated that NDE technology is evolving, but UT examination is the primary method that they plan to use for their examinations. The licensee also mentioned a new EC examination process that will look for loss of contact between the CEDM nozzle and the reactor vessel head. The licensee will further discuss their proposed evaluations in their 30-day response to the Bulletin.
-3 Q5. Since the insulation on ANO-2 cannot be easily removed, please address whether or not UT examination of the nozzles in ANO-2 alone (i.e., EC examination on only some of the nozzles) will identify reactor pressure vessel head wastage.
A5. The licensee indicated that the UT examination technique alone is sufficient to identify whether or not a leakage path is present. The licensee stated that the UT examination technique can look through the nozzle, and a minimum of 0.050" into the weld. The UT examination will be further discussed in the licensee's demonstration report, which they committed to provide to the staff.
ANO-2 RV Head Inspection Summary for 2R15 Inspection Plan
" Westinghouse performed the RV head inspection under their procedures with the oversight of ANO Engineering and Quality Control NDE specialists.
" The CEDM (81) inspection plan included the use of both a "demonstrated" eddy current and a UT probe which included the area 1.5 inches above the J- weld to the inspectible extent of the nozzle below the weld.
- due to an electrical problem with the eddy current detection circuit, the ECT was not functional during a large portion of the examination.
" The incore instrument nozzles (8) were similarly inspected using a comparable UT and eddy current probe, but modified for the larger ICI nozzle diameter.
"* The single vent nozzle was inspected by a smaller UT probe.
"* Head penetrations were inspected from above the insulation for boric acid deposits at or around the nozzles and also the flange area (videotaped).
Inspection Results
"* All 90 head penetrations were confirmed to have pressure boundary integrity with no indications of PWSCC cracking and no through wall leaks that could cause head wastage.
" Additional NDE was performed on three CEDMs from under the head (see diagrams)
- Nozzle 43 and 59 had J- weld reflections at the low side of the nozzles (-00) that were further inspected by PT and found to have no surface indications found.
- Nozzle 30 had indications in the nozzle just above the threading for the CEDM guide cone. An ECT was performed on the OD of the nozzle with no surface indications found.
" No signs of leakage were detected above the head on the insulation. Only very minor occasional boric acid staining observed (likely from historical venting).
Follow-up Actions Entergy will provide an NDE demonstration report 30 days after startup from 2R135 which provides a summary of the testing performed for confirming the ability to detect flaws in the head penetration nozzles and the nozzle/weld interface.
IR 10 C) 0.
z 4cJ V1.
0 CV)
N 0
z c
0 0
0D S1
,J (El I.IJ cc-iJ0 QQ I
I.
T pei-AL O IJ~L -*qs 077-F-At)C Elevation View of UT Reflectors on ANO-2 Nozzles 43 and 59 A