MONTHYEARML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21027A2312021-02-0909 February 2021 Summary of January 25, 2021 Presubmittal Meeting with Entergy Operations, Inc. Planned LAR to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations for River Bend Station, Unit 1 ML20317A0372020-11-18018 November 2020 Summary of September 22, 2020, Presubmittal Meeting with Entergy Operations, Inc., a Request for a One-Time Exemption from 10 CFR Part 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20107F7332020-04-27027 April 2020 Summary of April 3, 2020 Meeting with Industry Regarding Changes to Subsequent License Renewal Guidance Documents ML20015A2692020-02-0505 February 2020 December 17, 2019, Summary of Meeting with Entergy Operations, Inc. on Planned License Amendment Request to Incorporate the Tornado Missile Risk Evaluator Methodology at River Bend Station, Unit 1 ML18270A1582018-10-10010 October 2018 Summary of Meeting with Entergy Operations Inc. on Its Intent to Change Neutron Absorbers for the River Bend Station, Unit 1 Spent Fuel Pool ML18155A5502018-06-14014 June 2018 Summary of a Telephone Conference Call Held on May 17, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Revie ML18143B3962018-06-0404 June 2018 05/03/2018 Summary Telephone Conference with Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Review. ML18129A3562018-05-29029 May 2018 April 26, 2018 Summary of a Telephone Conference Call Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review ML18127A0342018-05-25025 May 2018 Summary of Public Telephone Conference Call Held on April 18, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the RBS Unit 1 License Renewal Application Review ML18124A1902018-05-25025 May 2018 Summary of a Telephone Conference Call Held on April 25, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Re ML18120A1352018-05-10010 May 2018 Call Summary - Fuel Oil, Ext.-Int. Surf. Monitoring, FAC & Others 041018, Rev2 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18107A5042018-04-24024 April 2018 03/29/2018 Summary of Public Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18089A0762018-04-12012 April 2018 03/13/2018 Summary of Public Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station, Unit 1 License Renewal Application ML18059A8222018-03-0808 March 2018 Summary of Public Telephone Conference Call Held on February 27, 2018 Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station Unit 1 ML18057A4532018-03-0707 March 2018 Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17293A6152017-10-19019 October 2017 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A ML17234A5442017-08-30030 August 2017 Summary of Public Meeting with Entergy Operations, Inc. to Discuss a Proposed New Technical Specification for River Bend Station, Unit 1 ML17180A1362017-08-0909 August 2017 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application ML17187A0372017-08-0909 August 2017 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application ML17152A2442017-06-0101 June 2017 Summary of Public Meeting - River Bend Station ML17152A3772017-06-0101 June 2017 Errata for Summary of Public Meeting ML16119A3422016-04-28028 April 2016 Summary of Regulatory Conference to Discuss Safety Significance of River Bend Station Control Building Chilled Water System Apparent Violation ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12240A4162012-08-27027 August 2012 Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues ML12195A3282012-07-13013 July 2012 AIT Meeting Summary ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1117901522011-05-20020 May 2011 Summary of Annual Performance Assessment Meeting for River Bend Station ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1033404942010-12-10010 December 2010 November 19, 2010 Summary of Meeting with Entergy Operation Inc, to Discuss River Bend Preliminary Enforcement ML1029403512010-10-19019 October 2010 10/182010 Summary of Public Meeting with Entergy Operations to Discuss Initiatives to Improve Plant Reliability ML1026705452010-09-24024 September 2010 Public Meeting with Entergy, Inc., to Discuss Licensee Activities Associated with Emergency Diesel Generators and Control Building Chillers ML1011209712010-04-16016 April 2010 Summary of Meeting to Discuss the Safety Performance at the River Bend Station Between January 1 and December 31, 2009 ML1009805832010-04-0808 April 2010 Summary of Meeting with Entergy Operations, Inc. to Discuss the 2009 Nuclear Safety Culture Assessment Performed at Arkansas Nuclear One, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station, Unit 3 ML0921510442009-08-19019 August 2009 Summary of Meeting with Entergy Operations, Inc., River Bend Station, Unit 1, Relief Requests Related to Code Case N-716 and RR-ISI-012 to Extend Second Interval ML0918701502009-07-10010 July 2009 Summary of June 29, 2009, Conference Call with Entergy Operations, Inc., Related to Decommission Funding Assurance ML0719002022007-07-0909 July 2007 Summary of Meeting with Entergy Operations, Inc., Regarding Discussion of River Bend Station Plans for Improving Human Performance and Corrective Action Program 2024-02-26
[Table view] |
Text
4ý *UNITED STATES
-oNUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 APR 11 2002 Paul D. Hinnenkamp, Vice President - Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775
SUBJECT:
RIVER BEND STATION END OF CYCLE MEETING
Dear Mr. Hinnenkamp:
This refers to the end-of-cycle performance assessment meeting conducted at the Best Western St. Francis Hotel on the Lake, in St. Francisville, Louisiana, on April 9, 2002. As you are aware, the purpose of this public meeting between the NRC and Entergy Operations was to present and discuss performance results of the River Bend Station for the period of April 1 through December 29, 2001. The attendance list and the NRC's presentation are enclosed (Enclosures 1 and 2, respectively).
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/lwww.nrc.Qov/readinQ-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, David N. Graves, Chief Projects Branch B Division of Reactor Projects Docket: 50-458 License: NPF-47
Enclosures:
- 1. Attendance List
- 2. NRC Presentation
Entergy Operations, Inc. cc w/enclosures:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.
Winston & Strawn 1401 L Street, N.W.
Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775
Entergy Operations, Inc. The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Jimmy Bello, President Pointe Coupe Parish Police Jury P.O. Box 290 New Roads, Louisiana 70760 James Hunt, President East Feliciana Parish Police Jury P.O. Box 427 Clinton, Louisiana 70722 Ted Denstel, Parish President West Baton Rouge Parish Counsel P.O. Box 757 Port Allen, Louisiana 70767 Burt Babers, President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775
Entergy Operations, Inc. Bobby Simpson, Mayor-President Office of the Mayor-President P.O. Box 1471 Baton Rouge, Louisiana 70821 Federal Emergency Management Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Jim Brewer Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, LA 70821 Joanne Moreau, Director Dept. of Emergency Management East Baton Rouge Parish P.O. Box 1471 Baton Rouge, LA 70821 Charles LeBlanc, Director Dept. of Emergency Management West Baton Rouge Parish P.O. Box 757 Port Allen, LA 70767 Don Ewing, Director Dept. of Emergency Management Pointe Coupee Parish P.O. Box 248 New Roads, LA 70760 Col. Michael L. Brown Assistant Director Military Department Louisiana Office of Emergency Preparedness P.O. Box 44217 Baton Rouge, LA 70804 Tara Wicker Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, LA 70821
Entergy Operations, Inc. -5 Jesse Means, Director Dept. of Emergency Management West Feliciana Parish P.O. Box 1927 St. Francisville, LA 70775 T. W. Prewitt, Director Dept. of Emergency Management East Feliciana Parish P.O. Box 640 Jackson, LA 70748
ENLSRE 1 END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.
LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) ORGANIZATION Joe L e, j J U-( Avi C j 111
/VC/I-A- e /V
1Y ,T tl~
15_0 ____Pag _*___
Page of 3
END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.
LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) I ORGANIZATION iI erro1'
&odr.COT i z- &?0o I
/A/
Page ;ý of
END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.
LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) f ORGANIZATION 5 46AJ E - TZ
\~AIOflJ lu S V~~1 '/ 1 6 c&A/)&J7 tlfIcl AZ/rAk
_____________RAS__
i j
i Page a of 3
ENCLOSURE 2 ANNUAL ASSESSMENT NRC PERFORMANCE GOALS MEETING "* Maintain public safety and protect the environment
+ 0
"* Enhance public confidence
"* Improve:
- Effectiveness
- Efficiency
- Realism of processes and decision making Nuclear Regulatory Commission
"* Reduce unnecessary regulatory Region IV burden NRC Meeting Guidelines NRC Meeting Guidelines
"* Registration Table
"* Meeting with Licensee and Public
"* Questions and Answers
"* Inform Public of Plant Performance
"* Handouts
"* Feedback Forms I
Comprehensive Oversight NRC Oversight Activities Program
"* Provide assurance plants are:
NRC'S PUBLIC HEALTH AND SAFETY - Operating safely Overall AS A RESULT OF CIVILIAN - Complying with regulations Safety Mission NUCLEAR REACTOR OPERATION
"*Based on a logical and sound framework Strategic Performance REACTOR RADIAo LANT "*Inspections focused on key safety areas Areas I SAFETY I SAFETY SECURITY
"* Objective indicators of performance
- Assessment program triggers regulatory actions 3
Baseline Inspection Program
"*Gathers objective evidence of plant safety
"*Conducted at all plants
"*Focuses on safety-significant:
- systems
- components
- activities
- events Baseline Inspection Program Event Follow-up and Supplemental Inspections
"*Review events for significance
"* Inspection reports describe significant findings and non-compliance
"* Follow-up significant inspection findings
"* Inspection reports are publicly accessible
"*Determine causes of performance declines
"*Provide for graduated response ,..
4
Reactor Oversight Process Performance Indicators SAFETY SIGNIFICANCE Unplanned Scrams per 7000 critical hours
- very low 2Q001 30/01 40/01 Thresholds:
White >3.0,
- low to moderate 23t is Yellow >6.0, 20 Red >25.0
- substantial
-- high Unplanned scrams per 7000 critical hours Actual scram.s Critical hours 2Q010 1.0 2288.2 3010 0
2036.0 4Q010 0
1915.6 IIndcatcor"valu IK nR na I 16ese 1au na 08 1c Key Aspects of the Inspection Program Assessment Program
"*Objective review of licensee performance "* Inspection reports describe more than minor findings and non-compliance
" "Action Matrix" to determine agency response in three areas: "* Inspection reports are publicly accessible
- Inspection
- Management Involvement
- Regulatory Actions www.NRC.gov/reading-.rm/adams.html
"*Plant specific assessment letters
"* Information on NRC public web site -
5
Performance Indicators 9 Performance indicator results and other assessment information available on the NRC's public web site: Plant Performance Summary www.NRC.gov/NRRIOVERSIGHTIASSESSIRBS1/rbst-chart.htni Inspection Results Performance Indicator NRC and Licensee identified inspection Results findings were of very low safety significance All performance indicators within the Licensee Control Band No special or supplemental inspections necessary 6
Rh,ir Rrn,,l Assessment Conclusion Licensee effectively managed:
- Reactor safety
- Radiation safety
- Plant security River Bend Station operated in a manner that protected the health and safety of the public 7
Reaction to September 11 Conclusions
- Ordered Increase In minimum security
- Assured Public Safety requirements
- Flexible/Predictable Response
- Reviewing security regulations considering our changed environment
Contacting the NRC
"*Report a Safety Concern:
(800) 695-7403 or Allegation@nrc.gov
"* General Information or questions:
www.nrc.gov
"* Report an Emergency; (301) 816-5100 (collect)
Select "What we do" for Public Affairs 9