ML021090348

From kanterella
Jump to navigation Jump to search
Meeting with Entergy Operations Re River Bend End of Cycle
ML021090348
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/17/2002
From: Graves D
NRC/RGN-IV/DRP/RPB-B
To: Hinnenkamp P
Entergy Operations
References
Download: ML021090348 (17)


Text

4ý *UNITED STATES

-oNUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 APR 11 2002 Paul D. Hinnenkamp, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

SUBJECT:

RIVER BEND STATION END OF CYCLE MEETING

Dear Mr. Hinnenkamp:

This refers to the end-of-cycle performance assessment meeting conducted at the Best Western St. Francis Hotel on the Lake, in St. Francisville, Louisiana, on April 9, 2002. As you are aware, the purpose of this public meeting between the NRC and Entergy Operations was to present and discuss performance results of the River Bend Station for the period of April 1 through December 29, 2001. The attendance list and the NRC's presentation are enclosed (Enclosures 1 and 2, respectively).

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/lwww.nrc.Qov/readinQ-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely, David N. Graves, Chief Projects Branch B Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosures:

1. Attendance List
2. NRC Presentation

Entergy Operations, Inc. cc w/enclosures:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

Entergy Operations, Inc. The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Jimmy Bello, President Pointe Coupe Parish Police Jury P.O. Box 290 New Roads, Louisiana 70760 James Hunt, President East Feliciana Parish Police Jury P.O. Box 427 Clinton, Louisiana 70722 Ted Denstel, Parish President West Baton Rouge Parish Counsel P.O. Box 757 Port Allen, Louisiana 70767 Burt Babers, President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775

Entergy Operations, Inc. Bobby Simpson, Mayor-President Office of the Mayor-President P.O. Box 1471 Baton Rouge, Louisiana 70821 Federal Emergency Management Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Jim Brewer Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, LA 70821 Joanne Moreau, Director Dept. of Emergency Management East Baton Rouge Parish P.O. Box 1471 Baton Rouge, LA 70821 Charles LeBlanc, Director Dept. of Emergency Management West Baton Rouge Parish P.O. Box 757 Port Allen, LA 70767 Don Ewing, Director Dept. of Emergency Management Pointe Coupee Parish P.O. Box 248 New Roads, LA 70760 Col. Michael L. Brown Assistant Director Military Department Louisiana Office of Emergency Preparedness P.O. Box 44217 Baton Rouge, LA 70804 Tara Wicker Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, LA 70821

Entergy Operations, Inc. -5 Jesse Means, Director Dept. of Emergency Management West Feliciana Parish P.O. Box 1927 St. Francisville, LA 70775 T. W. Prewitt, Director Dept. of Emergency Management East Feliciana Parish P.O. Box 640 Jackson, LA 70748

ENLSRE 1 END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.

LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) ORGANIZATION Joe L e, j J U-( Avi C j 111

/VC/I-A- e /V

  • *4* l)71, 5 c-0_f-1*)

1Y ,T tl~

15_0 ____Pag _*___

Page of 3

END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.

LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) I ORGANIZATION iI erro1'

&odr.COT i z- &?0o I

/A/

Page ;ý of

END-OF-CYCLE MEETING ATTENDANCE LICENSEE/FACILITY Entergy Operations, Inc. - River Bend Station DATE/TIME April 9, 2002; 7:00 p.m.

LOCATION Best Western St. Francisville Inn NAME (PLEASE PRINT) f ORGANIZATION 5 46AJ E - TZ

\~AIOflJ lu S V~~1 '/ 1 6 c&A/)&J7 tlfIcl AZ/rAk

_____________RAS__

i j

i Page a of 3

ENCLOSURE 2 ANNUAL ASSESSMENT NRC PERFORMANCE GOALS MEETING "* Maintain public safety and protect the environment

+ 0

"* Enhance public confidence

"* Improve:

- Effectiveness

- Efficiency

- Realism of processes and decision making Nuclear Regulatory Commission

"* Reduce unnecessary regulatory Region IV burden NRC Meeting Guidelines NRC Meeting Guidelines

"* Registration Table

"* Meeting with Licensee and Public

"* Questions and Answers

"* Inform Public of Plant Performance

"* Handouts

"* Feedback Forms I

Comprehensive Oversight NRC Oversight Activities Program

"* Provide assurance plants are:

NRC'S PUBLIC HEALTH AND SAFETY - Operating safely Overall AS A RESULT OF CIVILIAN - Complying with regulations Safety Mission NUCLEAR REACTOR OPERATION

"*Based on a logical and sound framework Strategic Performance REACTOR RADIAo LANT "*Inspections focused on key safety areas Areas I SAFETY I SAFETY SECURITY

"* Objective indicators of performance

- Assessment program triggers regulatory actions 3

Baseline Inspection Program

"*Gathers objective evidence of plant safety

"*Conducted at all plants

"*Focuses on safety-significant:

- systems

- components

- activities

- events Baseline Inspection Program Event Follow-up and Supplemental Inspections

"*Review events for significance

"* Inspection reports describe significant findings and non-compliance

"* Follow-up significant inspection findings

"* Inspection reports are publicly accessible

"*Determine causes of performance declines

"*Provide for graduated response ,..

4

Reactor Oversight Process Performance Indicators SAFETY SIGNIFICANCE Unplanned Scrams per 7000 critical hours

- very low 2Q001 30/01 40/01 Thresholds:

White >3.0,

- low to moderate 23t is Yellow >6.0, 20 Red >25.0

- substantial

-- high Unplanned scrams per 7000 critical hours Actual scram.s Critical hours 2Q010 1.0 2288.2 3010 0

2036.0 4Q010 0

1915.6 IIndcatcor"valu IK nR na I 16ese 1au na 08 1c Key Aspects of the Inspection Program Assessment Program

"*Objective review of licensee performance "* Inspection reports describe more than minor findings and non-compliance

" "Action Matrix" to determine agency response in three areas: "* Inspection reports are publicly accessible

- Inspection

- Management Involvement

- Regulatory Actions www.NRC.gov/reading-.rm/adams.html

"*Plant specific assessment letters

"* Information on NRC public web site -

5

Performance Indicators 9 Performance indicator results and other assessment information available on the NRC's public web site: Plant Performance Summary www.NRC.gov/NRRIOVERSIGHTIASSESSIRBS1/rbst-chart.htni Inspection Results Performance Indicator NRC and Licensee identified inspection Results findings were of very low safety significance All performance indicators within the Licensee Control Band No special or supplemental inspections necessary 6

Rh,ir Rrn,,l Assessment Conclusion Licensee effectively managed:

- Reactor safety

- Radiation safety

- Plant security River Bend Station operated in a manner that protected the health and safety of the public 7

Reaction to September 11 Conclusions

  • Ordered Increase In minimum security
  • Assured Public Safety requirements
  • Flexible/Predictable Response
  • Reviewing security regulations considering our changed environment
  • Risk-informed Programs 8

Contacting the NRC

"*Report a Safety Concern:

(800) 695-7403 or Allegation@nrc.gov

"* General Information or questions:

www.nrc.gov

"* Report an Emergency; (301) 816-5100 (collect)

Select "What we do" for Public Affairs 9