Text

December 6, 2005 LICENSEE:

Entergy Operations, Inc.

FACILITY:

RIVER BEND STATION, UNIT 1

SUBJECT:

SUMMARY

OF NOVEMBER 10, 2005, MEETING WITH ENTERGY OPERATIONS, INC., AND RIVER BEND STATION STAFF, ON THE AMENDMENT REQUEST FOR USE OF FUEL BUILDING CASK HANDLING CRANE FOR DRY SPENT FUEL CASK LOADING OPERATIONS (TAC NO. MC6327)

On November 10, 2005, a Category 2 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Entergy Operations, Inc. (Entergy), and River Bend Station (RBS) staff at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staffs questions regarding RBSs amendment request for use of fuel building cask handling crane for dry spent fuel cask loading operations. A list of attendees is provided as Enclosure 1.

Prior to the meeting, the NRC staff had received draft responses to their requests for additional information (RAIs). During the meeting the NRC staff stated that it had sufficient information to begin the preparation of safety evaluations, except for questions regarding reliance on operator actions to remove the power to the hoist or trolley motors in lieu of incorporating positive controls during hoisting to prevent trolley movement.

Entergy and RBS staff agreed to make a regulatory commitment to determine the most appropriate long term means to incorporate positive controls during hoisting to prevent trolley movement in their next supplemental submission. Entergy and RBS staff also stated that the supplemental submissions addressing the RAIs and the additional questions would be forthcoming in the early part of the week of November 14, 2005.

Entergy and RBS staff requested that the NRC staffs review and approval of this amendment request be completed by December 1, 2005. The NRC staff responded that they would work towards meeting the requested date of completion.

Meeting Summary Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-3308, or bkv@nrc.gov.

/RA/

Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

List of Attendees cc w/encl: See next page

ML053410510 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya DJohnson DTerao DATE 12/06/05 12/6/05 12/6/05 E:\\Filenet\\ML053410501.wpd

LIST OF ATTENDEES FOR THE MEETING WITH ENTERGY AND RBS STAFF NOVEMBER 10, 2005 From NRC:

Bhalchandra Vaidya Jack Donohew David Tang Steve Jones Angelo Stubbs George Georgiev James Pearson From Entergy:

Bill Brice Mark Feltner Jerrell Campbell Paul Miktus From Holtec International, Inc.:

Vince Bilovsky

May 2005 River Bend Station cc:

Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817 Manager - Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326