ML023030581

From kanterella
Jump to navigation Jump to search
Summary of 10/16/2002 Meeting Re. Extended Power Uprate
ML023030581
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/25/2002
From: Kalyanam N
NRC/NRR/DLPM/LPD4
To: Gramm R
NRC/NRR/DLPM/LPD4
Kalyanam N
References
Download: ML023030581 (4)


Text

October 25, 2002 MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: N. Kalyanam, Project Manager, Section 1 /RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MEETING HELD ON OCTOBER 16, 2002, WITH ENTERGY OPERATIONS, INC. (EOI), RE: EXTENDED POWER UPRATE AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3)

On October 16, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff held a meeting with representatives of EOI. The meeting was held at NRC headquarters in Rockville, Maryland.

The purpose of the meeting was to discuss the proposed extended power uprate at Waterford 3. The agenda for the meeting was provided and attached to the meeting notice dated October 3, 2002.

The slides presented by EOI are included as Attachment 1 to this letter. A list of the attendees is in Attachment 2.

Docket No.: 50-382

Attachment:

1. Meeting Slides
2. List of Attendees cc: See next page

ML023030581 Package No.: ML023030601 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME NKalyanam DJohnson RGramm DATE 10/23/2002 10/23/2002 10/25/2002 Attachment 2 ATTENDANCE LIST FOR MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND ENTERGY OPERATIONS, INC. (EOI)

OCTOBER 16, 2002 Name Organization George Hess Westinghouse Electric Corporation Steve OHearn Westinghouse Electric Corporation Joseph Cleary Westinghouse Electric Corporation Bryan Miller EOI Paul Sicard EOI David Madere EOI Timothy Brennan EOI Mohammed Shuaibi NRC Summer Sun NRC Cheng-Ih Wu NRC James Tatum NRC Rich Lobel NRC N. Kalyanam NRC

Waterford Generating Station 3 cc:

Mr. Michael E. Henry, Administrator Regional Administrator, Region IV and State Liaison Officer U.S. Nuclear Regulatory Commission Department of Environmental Quality 611 Ryan Plaza Drive, Suite 1000 P. O. Box 82135 Arlington, TX 76011 Baton Rouge, LA 70884-2135 Parish President Council Vice President, Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P.O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 January 2002