Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18152B817 | 18 May 1998 | Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 | |
ML18153A117 | 19 March 1997 | Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities | |
ML18153A792 | 12 April 1995 | Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection | |
ML18153A808 | 28 April 1995 | Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed | |
ML18153A968 | 14 June 1994 | Confirms Agreements Reached During 940419 Telcon Re Util Proposed Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Once Shipped to Interim Processor for Vol Reduction | |
ML18153A989 | 1 July 1994 | Responds to VEPCO 940614 Ltr Re Proposed Procedure for Disposing of Low Level Radioactive Contaminated Asbestos Waste from Surry & North Anna Power Stations | |
ML18153B026 | 25 July 1994 | Forwards Update on Containment & Accumulator Initial Temp Assumptions for LB-LOCA Analysis | Backfit |
ML18153C857 | 23 December 1991 | Advises That on 910509,23 & 0829,shipments of Wastes Containing Asbestos Originated from North Anna & on 910208, Shipment Containing Asbestos Orginated from Surry. Shipment Disposal Time Exceeded 45 Days | |
ML18153D093 | 12 August 1992 | Suppls 911223 Ltr Re Disposal of Asbestos,Containing Matl from North Anna & Surry Stations.Asbestos Shipment Left North Anna on 910828 for Quadrex for Processing.Remaining Portion Buried at Barnwell on 920629 | |
ML19241B525 | 1 November 1978 | Requests Assistance in Obtaining Responses to 780902 Ltr to JW Moorman & 781101 Ltr to NRC Re False Statements Dealing W/Abnormal Settlement of Plant | |
ML19248D291 | 27 April 1979 | FOIA Request for Documents Relating to Alleged Withholding of Info Re Nuclear Plants Operated by VEPCO | |
ML19259C825 | 3 July 1979 | Confirms 790628 Telcon Re New Info About Util Motion for Summary Disposition & Prefiled Written Testimony Re Tornado Missiles.Large Missiles Could Not Strike Fuel Elements | Tornado Generated Missile |
ML20009H262 | 8 July 1981 | Informs of 810703 Facility Oil Spill.On 810703,station Transformer Ruptured & Caught Fire.Unknown Quantity of Oil Washed to Lake Anna Via Discharge Storm Sewer.Cleanup Continued Until 810705.No Environ Impact Cited | |
ML20029A001 | 25 January 1991 | Denies That Abnormal Events Re Water Releases to Lake Anna Should Be Classified as Unusual Discharges,Per 910121 & 23 Telcons.Discharges Contained No Pollutants | |
ML20045G403 | 7 July 1993 | Responds to State 930607 Ltr Re Findings Noted in RCRA Insps on 930518.Licensee Has Demonstrated That No Violations W/Respect to Unmarked Drum & Accumulation Time & Annual Rept & Contingency Plan Occurred | |
ML20055D298 | 28 June 1990 | Informs of Change in Location of Discharge of Reject Water from Plant Reverse Osmosis Water Purification Sys.Effective 900626,discharge Directed to Discharge Tunnel at Intake Structure Per State Recommendation | |
ML20055H839 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Also Requested | |
ML20055H840 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Requested | |
ML20056B458 | 21 August 1990 | Advises That Legal Notices Re Reissuances of NPDES Permit for Plant Have Been Published in Richmond-Times Dispatch & Central Virginian on 900804 & 11 & 0726 & 0802,respectively, as Requested.Confirmation from Newspapers Encl | |
ML20056G409 | 20 August 1993 | Responds to Util Rebutting Violations of Virginia Hazardous Waste Mgt Regulations Cited in 930607 | |
ML20057A986 | 8 September 1993 | Documents Understanding That,Due to Current Workloads at Agency,Recipient Will Not Be Available for Meeting Until After End of Sept,Per in Ref to Contested Findings of 930518 RCRA Insp at Plant | |
ML20058D590 | 19 November 1993 | Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp Conducted by FERC on 930921,per 18CFR12.44(b)(2) | |
ML20058F881 | 2 December 1993 | Submits Plan & Schedule for Development & Submittal of Annual Repts of Embankment Instrumentation & Survey Data,As Result of Annual Insp of North Anna Hydroelectric Facility | |
ML20059E166 | 29 August 1990 | Submits Addl Comments on Toxics Monitoring Program.Util Sent Request to K Roller to Allow Licensee to Use Alternate Detection Limits for Chemical Analyses in Subj Program.Ltr Containing Request Encl | |
ML20062D772 | 17 August 1990 | Informs of Identification of Deficiencies Occurred During North Anna REP Exercise of 900808 | |
ML20062E016 | 14 November 1990 | Documents Correction of Deficiencies Noted Insp of Lab Received on 901022.W/o Stated Ltr Explaining Causes of Unacceptable Results Obtained for Total Residual Chlorine & Suspended Solids Analyses | |
ML20065F276 | 5 April 1994 | Proposes to Discontinue Survey Between North Anna Main Dam Ref Monuments & Us Coast & Geological Survey Monuments Performed Once Every 10 Yrs to Verify Locations of Ref Monuments | |
ML20065R359 | 2 May 1994 | Forwards Caterpillar 940210 Memo Addressing Issues Re Emission Limits in Permit Issued on 931020 Which Differ from Limits Requested in 930830 Application for Permit to Install Emergency Standby diesel-powered Generator at Plant | Grab sample |
ML20069K258 | 9 June 1994 | Responds to Insp Rept & Deficiency Notice Received at Plant Following 940322 Insp.Since No Prior Notice of Changes to Std Methods Rule Given,Impacted Permittees Should Be Allowed Reasonable Time to Come Into Compliance W/Any Changes | |
ML20071H576 | 13 July 1994 | Notifies That Station Blackout Generator at Util Scheduled for Startup on or Around 940820 | |
ML20071L628 | 28 July 1994 | Ack Receipt of Detailed Response to NPDES Insp Rept | |
ML20077C248 | 22 November 1994 | Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 | |
ML20078E125 | 25 January 1995 | Submits Notification Re Stationary Source Permit to Construct & Operate an EDG | |
ML20078G842 | 9 November 1994 | Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved | |
ML20078H071 | 30 January 1995 | Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test | |
ML20078M148 | 8 February 1995 | Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod | |
ML20080C138 | 30 November 1994 | Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised | |
ML20080J918 | 22 February 1995 | Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer | |
ML20080K856 | 22 February 1995 | Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project | |
ML20081C210 | 1 March 1984 | Advises That 11.6% Permit Responsibility Transferred to Old Dominion Electric Cooperative on 831221,per . Requests NPDES Permit & 401 Certificate Be Modified to Reflect Transfer.W/O Stated Encl | |
ML20083K718 | 4 May 1995 | Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by | Boric Acid Grab sample Biofouling |
ML20086G585 | 29 December 1983 | Informs of 831228 Oil Sheen Discovered on Lake Anna.Caused by Rain Washing Oil Off Waste Oil Drums.Oil Boom & Absorbent Pads Used to Contain & Clean Up Spill.Oil Drum Storage Facility Const in Progress | |
ML20086N473 | 16 December 1991 | Confirms 911211 Telcon Notification Made by D James Re Failure of Sewage Lift Station at Plant.Failure Due to Electrical Malfunction of Turbine Bldg Sewage Lift Station. Sewage Flow Immediately Stopped & Repairs Made to Lift | |
ML20087G315 | 7 March 1984 | Forwards Completed Oil Spill Questionnaire VA-84-093 for 840215 Occurrence | Time of Discovery |
ML20087L341 | 21 August 1995 | Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant | |
ML20087M061 | 22 September 1983 | Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna | |
ML20091C774 | 2 August 1991 | Forwards Completed Spill Questionnaire for 910704 Incident, Involving Discharged Oil or Hazardous Matls from Facility in Quantities That May Be Harmful | Time of Discovery |
ML20092C869 | 13 June 1984 | Forwards Completed Oil Spill Questionnaire VA-84-156 Re 840518 Spill in Condenser Cooling Water Discharge Canal. Cause Unidentified.Oil Contained by Absorbent Boom | Time of Discovery |
ML20094P174 | 1 April 1992 | Forwards Completed Oil Questionnaire Re 920226 Oil Spill Into Stormwater Pipe.Caused by Broken Fuel Oil Pump Strainer.Pipe Flushed & Pump Strainer Repaired | |
ML20095J204 | 20 August 1984 | Informs of Oil Spill on 840816.Two Gallons of Oil Discovered Near First Storm Drain at Discharge Canal.Oil Contained in Area & Cleaned Up by Use of Absorbent Pads & Fiber Pearl. Caused by Separator Left Running |