ML19248D291
From kanterella
Jump to navigation
Jump to search
ML19248D291 | |
Person / Time | |
---|---|
Site: | Surry, North Anna ![]() |
Issue date: | 04/27/1979 |
From: | Allen J NORTH ANNA ENVIRONMENTAL COALITION |
To: | Whitman B JUSTICE, DEPT. OF |
Shared Package | |
ML19248D288 | List: |
References | |
FOIA-79-269 NUDOCS 7908150523 | |
Download: ML19248D291 (1) | |
Similar Documents at Surry, North Anna | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20211B3871999-08-17017 August 1999
[Table view]Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML20206M7921999-05-0707 May 1999 Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit ML18152B5991999-01-0808 January 1999 Confirms That Util Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste (Rcaw),Acceptable for Maintaining Compliance with Natl Emissions Stds for Hazardous Air Pollutants (Neshap) Regulations ML20196H6431998-12-0303 December 1998 Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested ML20153G0131998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station ML18153A2671998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 Vac 25-91-130,Pollution Prevention Requirements) for Surry Nuclear Power Station ML18152B8171998-05-18018 May 1998 Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 ML20217Q7691998-05-0404 May 1998 Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in ML18153A2161998-01-23023 January 1998 Notifies That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 35 Days Since Waste Was Shipped off- Site & Will Not Receive in 45 Days ML20198P8791998-01-12012 January 1998 Submits Application for Exclusionary General Permit for Plant ML20203H6111997-12-15015 December 1997 Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl ML20198P2871997-10-29029 October 1997 Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc ML20210G9721997-07-22022 July 1997 Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 ML20138B3381997-04-23023 April 1997 Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank ML18153A1171997-03-19019 March 1997 Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities ML18153A1111997-02-14014 February 1997 Confirms 970214 Telcon Re Location of Radiologically Contaminated Asbestos Waste Shipment S-96-1005 ML20149M8131996-12-0505 December 1996 Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed ML20101R2521996-04-10010 April 1996 Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) ML20101J0511996-03-21021 March 1996 Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 ML18151A1871996-03-20020 March 1996 Forwards Application for Reissuance of Vpdes Permit VA0004090 for Plant.W/One Oversize Map ML18153A5301996-03-18018 March 1996 Confirms That Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Acceptable for Maintaining Compliance W/Natl Emissions Stds for Hazardous Air Pollutants Regulations ML20100B9061996-01-24024 January 1996 Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form ML18153A5561995-12-11011 December 1995 Requests Approval for Proposed Minor Change in Nature of Internal Discharge at Plant ML18153A6821995-11-29029 November 1995 Responds to 951114 Lab & Technical Insps at Plant on 950928. Submits Actions Taken to Address Items Noted During Insp & Reflected in Lab Rept ML18153A6721995-11-22022 November 1995 Requests That Vmrc Permit 92-1347 Be Extended to Allow Continued Maint Dredging Activity in Future ML18153A7801995-10-10010 October 1995 Responds to Concerns Re Leak Detection Sys in Facilities in Jurisdiction ML18153A7461995-08-30030 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Surry Power Station ML20087L3411995-08-21021 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant ML18153A7311995-08-0909 August 1995 Forwards Mixing & Dilution of Surry Nuclear Power Plant Cooling Water Discharge Into James River. ML18152A4011995-05-11011 May 1995 Responds to Telcons W/Eh Greene of VA Power'S Air Quality E Dept Re Use of Methylene Chloride in Paint Shop of Surry Power Station.Requests Confirmation That Painting Operation Exempt from Toxics Regulations ML20083K7181995-05-0404 May 1995 Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by ML18153A8081995-04-28028 April 1995 Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed ML18153A7921995-04-12012 April 1995 Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection ML20080J9181995-02-22022 February 1995 Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer ML20080K8561995-02-22022 February 1995 Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project ML18153B2351995-02-17017 February 1995 Informs of Receipt of NOV in Ref to Dec 1994 Excursion of Total Suspended Solids Limitations of Vpdes Permit for Plant ML20078M1481995-02-0808 February 1995 Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod ML18153B2161995-02-0101 February 1995 Advises That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 45 Days Since Waste Shipped off-site ML20078H0711995-01-30030 January 1995 Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test ML20078E1251995-01-25025 January 1995 Submits Notification Re Stationary Source Permit to Construct & Operate an EDG ML18153B2181995-01-23023 January 1995 Informs That Scientific Ecology Group,Inc Received Shipment S-94-14 Which Consists of 3 B-25 Boxes of Asbestos ML18153B2021995-01-0303 January 1995 Submits Follow Up to Telephone Notification Re Excursion of Total Suspended Solids Limitations at Plant Outfall 181 ML20080C1381994-11-30030 November 1994 Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised ML20077C2481994-11-22022 November 1994 Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 ML20078G8421994-11-0909 November 1994 Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved ML18153B0611994-08-30030 August 1994 Requests 60-day Extension for Submittal of Initial Abatement Rept & SCR ML20071L6281994-07-28028 July 1994 Ack Receipt of Detailed Response to NPDES Insp Rept 1999-08-17 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20056B4581990-08-21021 August 1990
[Table view]Advises That Legal Notices Re Reissuances of NPDES Permit for Plant Have Been Published in Richmond-Times Dispatch & Central Virginian on 900804 & 11 & 0726 & 0802,respectively, as Requested.Confirmation from Newspapers Encl ML20055H8391990-07-23023 July 1990 Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Also Requested ML20055H8401990-07-23023 July 1990 Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Requested ML20055D2981990-06-28028 June 1990 Informs of Change in Location of Discharge of Reject Water from Plant Reverse Osmosis Water Purification Sys.Effective 900626,discharge Directed to Discharge Tunnel at Intake Structure Per State Recommendation ML18153B8491989-07-26026 July 1989 Informs of 890711 Discovery of die-off of Approx 200 Fish in Uppermost End of Discharge Canal.Possibly Caused by Fish Being Trapped in Discharge Canal & Dying from Temp Shock at Time of Startup of Plant ML18153B5781989-01-13013 January 1989 Informs That on 890109,discovered Small Oil Sheen in Upper End of Station Discharge Canal Attributed to Parking Lot Runoff Involving Less than 1 Pint of Oil Flowing Into Storm Drain & Discharge Canal.James River Believed Unaffected ML20153D5081988-08-29029 August 1988 Confirms Telcon Rept of 880827 Oil Spill During Operator Attempt to Dewater Oil/Water Separator,Resulting in Discharge to Outfall 004.Operators to Exercise More Caution During Dewatering Until Chiller Operation Curtailed ML20151Q1071988-04-20020 April 1988 Comments on Comparison Review of 1986 Semiannual Effluent Release Repts,Per 880311 Request.Percent of Tech Spec Limit for Total Body Dose Rate for Fourth Quarter on Page 7 Changed from 7.63E3% to 7.63E-3% ML20213A4601986-12-15015 December 1986 Discusses 861212 Visit to Plant Re 861209 Piping Failure. Addition of Snubber or Piping Changes May Be Necessary.Addl Info from Util Needed ML20214R7641986-11-25025 November 1986 Confirms Recent Oil Spill.On 861118,oil Found in Upper End of Station Cooling Water Discharge Canal.Sorbent Matls Secured in Storm Drain.Related Info Encl ML20214P0071986-11-25025 November 1986 Forwards Completed Oil Spill Questionnaire VA 87-011 of Spill on 861022.Spill Determined to Be Discharge of Polystyrene Resin,Not Oil ML20214J1331986-11-21021 November 1986 Confirms Recent Oil Spill at Facilities,Previously Reported on 861118.Complete Info Being Assembled & Full Rept Will Be Provided by 861125 ML20207B4111986-07-14014 July 1986 Forwards Completed Questionnaire Re 860604 Oil Spill ML20137B4701986-01-0606 January 1986 Forwards Oil Spill Questionnaire WV-86-002 Describing 851002 Discharge of Approx 1 Gallon Lubricating Oil from Oil/Water Separator Into Discharge Canal Leading to Lake Anna.Catch Basin Cleaned ML20128C8631985-06-19019 June 1985 Forwards Completed Questionnaire Re 850519 Oil Spill, Submitted on 850605 by T Voltaggio ML20106F9991984-10-15015 October 1984 Forwards Completed 841004 Questionnaire VA-273 Re 840927 Oil Spill ML20097H7051984-09-0505 September 1984 Forwards Oil Spill Questionnaire VA-84-231 Addressing 840816 Spill ML20095J2041984-08-20020 August 1984 Informs of Oil Spill on 840816.Two Gallons of Oil Discovered Near First Storm Drain at Discharge Canal.Oil Contained in Area & Cleaned Up by Use of Absorbent Pads & Fiber Pearl. Caused by Separator Left Running ML20092K5571984-06-20020 June 1984 Submits Addl Info Re 840616 Possible Oil Spill Previously Reported by Telephone.Util Unable to Confirm or Deny Original Rept of Spill.Level Control Sys for Unit 1 Turbine Sump Tested & Found Operating Satisfactorily ML20092C8691984-06-13013 June 1984 Forwards Completed Oil Spill Questionnaire VA-84-156 Re 840518 Spill in Condenser Cooling Water Discharge Canal. Cause Unidentified.Oil Contained by Absorbent Boom ML20087G3151984-03-0707 March 1984 Forwards Completed Oil Spill Questionnaire VA-84-093 for 840215 Occurrence ML20081C2101984-03-0101 March 1984 Advises That 11.6% Permit Responsibility Transferred to Old Dominion Electric Cooperative on 831221,per . Requests NPDES Permit & 401 Certificate Be Modified to Reflect Transfer.W/O Stated Encl ML18141A4951984-02-0202 February 1984 Ack Receipt of Tl Wedgewood 831230 Ltr.Forwards Payment of Assessed Penalty for Discharge of Oil Into Cooling Water Discharge Canal ML20086G5851983-12-29029 December 1983 Informs of 831228 Oil Sheen Discovered on Lake Anna.Caused by Rain Washing Oil Off Waste Oil Drums.Oil Boom & Absorbent Pads Used to Contain & Clean Up Spill.Oil Drum Storage Facility Const in Progress ML20087M0611983-09-22022 September 1983 Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna ML20009H2621981-07-0808 July 1981 Informs of 810703 Facility Oil Spill.On 810703,station Transformer Ruptured & Caught Fire.Unknown Quantity of Oil Washed to Lake Anna Via Discharge Storm Sewer.Cleanup Continued Until 810705.No Environ Impact Cited ML18139A9751980-12-31031 December 1980 Advises That Response Plan Not Acceptable in Present Form. Supplies,Personnel & Technical Assistance to Be Provided by State Health Dept in Most Cases Nonexistent ML19259C8251979-07-0303 July 1979 Confirms 790628 Telcon Re New Info About Util Motion for Summary Disposition & Prefiled Written Testimony Re Tornado Missiles.Large Missiles Could Not Strike Fuel Elements ML19248D2911979-04-27027 April 1979 FOIA Request for Documents Relating to Alleged Withholding of Info Re Nuclear Plants Operated by VEPCO ML19282B8871979-02-19019 February 1979 Expresses Concern Re Replacement of Radioactive Steam Generators & Possible Radiation Exposure Dangers.Requests Public Hearings ML19241B5251978-11-0101 November 1978 Requests Assistance in Obtaining Responses to 780902 Ltr to JW Moorman & 781101 Ltr to NRC Re False Statements Dealing W/Abnormal Settlement of Plant ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested ML19331A6781977-03-25025 March 1977 Discusses Nuclear Power Plant Const Delays Caused by NRC Inefficiency & Indifference.Requests President Carter to Take Positive & Constructive Action Re Voter Supported Nuclear Energy.Certificate of Svc Encl 1990-08-21 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19248D291&oldid=1894499"