Watts Bar Nuclear Plant, Units 1 & 2 - Emergency Plan Implementing Procedure Revision
ML16273A361
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/30/2016
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16273A361 (120)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381September 30, 201610 cFR 50.410 CFR 50, Appendix E, Section V10 CFR 50.54(qX5) 10 cFR 72.410 cFR 72.44(f)ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Watts Bar Nuclear Plant, Unit 1 & Unit 2Facility Operating License No. NPF-90NRC Docket No. 50-390, 50-391Emergency PIan lmplementing Procedure Revisionln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10CFR 50.54(qX5),

and 10 CFR72.44(f),

the enclosures provide the Emergency Planlmplementing Procedures (EPIP) and associated Screening Evaluation Forms for thefollowing procedures:

EPIP Revision5 00466 0049TitleGeneral Emergency Activation and Operation of theTechnical Support Center (TSC)Effective Date9t08t2016 9t02t2016 There are no regulatory commitments in this letter. Please direct allquestions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager,at (423) 365-3232.

Respectfully, Paul SimmonsSite Vice President Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission September 30, 2016Page 2

Enclosures:

1. Emergency Plan lmplementing Procedure Revision

- Screening Evaluation Form and EPIP-S, Revision 00462. Emergency Plan lmplementing Procedure Revision

- Screening Evaluation Form and EPIP-6, Revision 0049cc:NRC Regiona!

Administrator

- Region llNRC Senior Resident Inspector

- Watts Bar Nuclear PlantNRC Project Manager - Watts Bar Nuclear PlantEDMS ENCLOSURE 1WATTS BAR NUCLEAR PLANT, UNIT OEPIP Screening Evaluation FormEPIP-5, General Emergency, Revision 0046 EPDP-17 , Attachment 2Screening Evaluation FormEvaluation No.:Change Type:E The change is editorial or typographical.

/i-1*'r lu tri/, r,:/'; "i'Jn The change is not editorial or typographical.

Ii:ln Iu Fil. r,,:/i 4JConformance:

n The change conforms to an activity that has prior approval.

Record the prior approved activity:

'-,], r lrr [],lt',t:l:

7itr The change does not conform to an activity that has prior approval.

[Qe lr t,]!,:cl.

jt jActivity Description and

References:

I BLOCK IActivity is Revision 46 to EPIP-5;Removed "lnitial" from the title of Appendix H (CR 1 190953)Added Appendix D to the list of QA records(cR 1168376)Corrected title of Appendix D in Section 5.0These changes are all considered to be eitorial in nature. They do not change the intent or therequirements of this procedure.

They do not require any additional work for any of the positions in the Technical Support Center.X The activity is a change to the radiological emergency plan (includes EPIPs or any otherdocument describing the programmatic methods for maintaining preparedness orresponding to an emergency).

[Gct to B/crr,;(

3/tr The activity is not a change to the radiological emergency plan. 1r-io trt Bli':cli 5lPage 1 of 3 EPDP-I 7, Attachment 2Screening Evaluation FormEvaluation No..Comm itment Im pact Determination

tr The activity involves a site specific EP commitment.

Record the Commitment or Commitment reference:

i,31lO gl1'tr-.l,

/jn The activity does not involve a site specific EP commitmenl.

[{-;o tl $1111'1' 71Planning Standard lmpact Determination (Check All Applicable):

I BLOCK 5tl 50.47(bX1)

- Assignment of Responsibility (Organization Control)tr 50.47(bX2)

- Onsite Emergency Organization tr 50.47(bX3)

- Emergency Response Support and Resources n 50.47(b)(4)

- Emergency Classification System .tr 50.47(bX5)

- Notification Methods and Procedures

  • tr 50.47(bX6)-EmergencyCommunications tr 50.47(bX7)

- Public Education and lnformation tr 50.47(bX8)

- Emergency Facility and Equipment tl 50.47(bxg)

- Accident Assessment

  • tr 50.47(bX10)

- Protective Response

  • tr 50.47(bX11)

- Radiological Exposure Controltr 50.47(b)(12)

- Medical and Public Health Supporttr 50.47(bX13)

- Recovery and Reentry Planning and Post-Accident Operations tr 50.47(bX14)-

Drills and Exercises tr 50.47(bX15)

- Emergency Responder Trainingtr 50.47(bX16)-

Emergency Plan Maintenance tr 72.44(fl

- lndependent Spent Fuel Storage lnstallation (lSFSl)ii: ,,i;rt !-'l;tntittt:j.il.rnrl,-tlrl.s rtnlt,tt.let'l 91rt to Blctcl.,7 l{ rr,tnt:,,:)tc nn!)aclc(1.

(io to Blctch 6l' Denofes Risk Significant Planning StandardPage 2 of 3 EPDP-1 7, Attachment 2Screening Evaluation FormEvaluation No.' i "ii,,, i' i , t,, : i, ;,Screening Evaluation Results:A The activity can be implemented without performing a 50.54(q) reduction in effectiveness evaluation.

tr The activity cannot be implemented without performing a 50.54(q) reduction ineffectiveness evaluation.

BLOCK 7Approvals:

Preparer Name:Michael R. WhitePreparer Signature:

<-^--,!t'-4Date:Reviewer Name:Thomas F. Detchemendy Date: . tZ/r/za/aPage 3 of 3 Watts Bar Nuclear PlantUnit 0Emergency PIan lmplementing Procedure EPIP.5General Emergency Revision 0046Quality RelatedLevel of Use: Reference UseEffective Date: 09-08-201 6Responsible Organization:

REP, Radiological Emer. Prep.Prepared By: Michael R. WhiteApproved By: Tom Detchemendy WBNUnit 0General Emergency EP!P.5Rev.0046Paqe 2 of 36Revision LogRevision orChangeNumberEffective DateAffectedPageNumbersDescription of Revision/Change Rev 410612111310,20,24Removed reference to EPIP-8 Appendices.

The procedure now references EPIP-8 in itsentirety to prevent errors in procedure usagewithin EPIP-8Rev 4211t26t13131522Section 4.1 , added applicable appendices toQA records section.

PER724038 Revised Appendix A, removed line 4 briefdescription section; revised line 2 removing theSED name section; replaced completed by withpeer checked by. PER 712039Revised Appendix F line 2 removing the SEDname section.

PER 712039Rev 4303119t1416,19Added Faxing instructions to Appendix B andAppendix C.

WBNUnit 0Genera! Emergency EPIP.5Rev. 0046Paqe 3 of 36Revision LogRevision orGhangeNumberEffective DateAffectedPageNumbersDescription of Revision/Ghange Rev 4412t181147,14,22I111 5,1 6,35,36,37171924,252931 ,3210Updated title of Appendix H (PER 914554)Revised step 3.2[1] added steps to allow SM totransfer responsibility for State notification andPAR development to the CECC Director if theTSC is not activated but the CECC is activated Added additional TEENS notification optionsRevised wording of Step 3.5 Evacuation of Non-Emergency Responders to clarify events thatpreclude performing the action.Updated Appendix A and J based on new PARscheme(PER 914554)Added Emergency Communication Notification System (ECNS) phone instructions to AppendixB (PER 87e182)Corrected typographical error in step 1.0[2]Aand 1.0l2lC by changing referenced procedure step from 4.0[5] to 1.0[6]Updated Appendix F based on new PARscheme (PER 914554)Added direction to record time evacuation of 2mile radius commenced (PER 914554)Updated Appendix H based on new PARscheme (PER 914554)

General Emergency EP!P.5Rev.0046Paqe 4 of 36Revision LogRevision orChangeNumberEffective DateAffectedPageNumbersDescri ption of Revision/Change 4510t14t15I10, 11 ,12,1718,19,20,21 23,26,27,34 381111 ,191418,1932,33Revised step 1.1 to remove wording "orupgraded to a higher emergency classification" since no higher classification exists. (CRe855 14)Updated all telephone numbers and extensions to remove the requirement to dial "9" to accessoff site phone numbers and to add three digitprefix to phone numbers due to new AVAYAtelephone system upgrade.(CR 983963)Removed human error trap by changingspacing and pagination so the announcement performed in step 3.3[2J is on a single page (CR1010168)

]Aligned TEENS activation options in a two Icolumn format to more easily distinguish Ibetween an actual event and a drill. Changed I"Staging Area" references to read "Alternate IFacility" which is the new designation.

(CR I:nl..HNon eA records section 4.212!to Ireflect requirements for eight year planning Icycle by removing the qualifying statement I"starting the year after the next HAB drilt". IAdded step 1.0[4] to Appendix B, to direct the IODS to activate TEENS if appropriate.

(CR I1066247)

Ilncorporated a legible copy of Appendix H into IBSL copy of procedure (CR 101 3411) l4609/08 t1611,291213Removed "lnitial" from the title of Appendix H(cR 11e0e53)Added Appendix D to the list of QA records(cR 1168376)corrected title of Appendix D in Section s.0 WBNUnit 0General Emergency EPIP.5Rev. 0046Paoe 5 of 36Table of ContentsTNTRODUCTTON

.........7 Purpose ..................7 REFERENCES

........

...................7 lndustry Documents

.................7 Plant lnstructions..............

.......7EMERGENCY ACT!ONS...........

.................8 Site Emergency Director (SED) Location...

................8 WBN Risk County and State of Tennessee Notification andConfirmation

............

................8 Activation of the Emergency Response Organization (ERO). ......................

9Dose Assessment Evaluation...........

...... 10Evacuation of Non-Emergency Responders.............

................

10Notification of Site Personnel

..................

10Notification of the Nuclear Regulatory Commission (NRC)...

....11Monitor / Re-evaluate the Event .............

11Review of Procedure

............

..................12 DOCUMENTATION

...................

12QA Records..............

.............12 Non-QA Records ...................12 ILLUSTRATIONS

/APPENDICES

.............12 Appendix A: General Emergency lnitial Notification Form ........14 1.01.12.02.12.23.03.13.23.33,43.53.63.73.83.94.04.14.25.0AppendixAppendixAppendixAppendixAppendixB: State of Tennessee Notification

.............

16C: Notification of Site Personnel.....................Error!

Bookmark not defined.18 D: Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notification Worksheet)..........

..................19 E: Monitor / Re-Evaluate the Event......

......21F: General Emergency Follow-Up lnformation Form .................23 Appendix G: Technical Support Center General Emergency Classification lnstruction

......25 WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 6 of 36Table of Contents (continued)

Appendix H: Protective Action Recommendation FIow chart.......

.............30 Appendix l: Activation of the Emergency paging system Alternate ERO Activation........

................32 Appendix J: Upgrade - Protective Action Recommendation...

...................34 WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 7 of 361.11.02.02.

12.2INTRODUCTION

PurposeThe purpose of this procedure is to provide for the timely notification of appropriate individuals or organizations when the Shift Manager or the Site Emergency Director(SED) has determined through the use of EPIP-1 that an event has occurred whichis classified as a General Emergency.

Additionally, this procedure provides forperiodic evaluation of the current situation by the Shift Manager/SED to determine whether the General Emergency should be continued or terminated.

REFERENCES lndustry Documents NUREG-0654, "Criteria for Preparation and Evaluation of Radiologica!

Emergency Response Plans and Preparedness in Support of Nuclear Power Plants"10 CFR 50.47, Code of Federal Regulations 10 CFR 72.75, Code of Federal Regulations PIant lnstructions TVA Radiological Emergency PIanEPIP - l, "Emergency Plan Classification Logic"EPIP - 2, "Notification of Unusual Event"EPIP - 3, "Alert"EPIP - 4, "Site Area Emergency" EPIP -16, "Termination and Recovery Procedure" A.B.C.D.E.F.

WBNUnit 0General Emergency EPIP-5Rev. 0046Paqe 8 of 363.0 EMERGENCY ACTIONSNOTES1) Procedure steps can be performed concurrenfly.

2) All procedure steps can be delegated except as noted.3) A STA or SRO should peer check Appendix A completion.

3.1 Site Emergency Director (SED) Locationt1] lF the TSC SED has assumed the responsibilities from the SM SEDTHEN CONTINUE in this procedure at Aooendix G.Otherwise continue in this procedure.

3.2 wBN Risk county and state of rennessee Notification andConfirmation CAUTIONNotification of the Risk Counties

/ State of Tennessee is required to be compteted within 15 minutes from the time of emergency classification declaration NOTECompletion of the General Emergency Apoendix A includes protective actionrecommendation development, therefore it must be performed by the Site Emergency Director or delegated only to the CECC Director.

t1] lF the CECC is activated, THEN contact the CECC Director at extension 7 51 -161 4 and COMMUNICATE:

TIME of the General Emergency classification General Emergency Classification EAL Designator:

t1.11 lF the cEcc Directorwas contacted, the state of rennessee notification action is complete, THEN Go ro step 3.3. orHERWlsE goto step [2].I2l COMPLETE Aooendix A "lnitial Notification Form"t3] COMPLETE Apoendix B "State of Tennessee Notification" utilizing acompleted Aooendix A

WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 9 of 363.3 Activation of the Emergency Response Organization (ERO)11] TVA Enterprise Emergency Notification System (TEENS)A. CALL the ODS at751-1700 or 751-2495 to ACTIVATE TEENS utilizing one of the following notifications as appropriate:

B. IF unable to contact the ODS after 5 minutes,Then IMPLEMENT Aooendix l, "Activation of the Emergency PagingSystem"CAUTIONOngoing or anticipated security events may present a danger to site personnel.

Donot conduct the notification of site personnel PA message during an ongoinganticipated security event. All pertinent site personnel PA messages will beconducted per 1-AOl-,42.01 "Securityl Events" for securityr events.l2l Plant PA Announcement CONDUCT a Plant PA announcement similar to the following:

(Dial487 to obtain the Plant PA)"Attention AII Personnel.

Attention AII Personnel.

A GENERAL Emergency Classification has been declared.

The Watts Bar Emergency Plan is being implemented at this time.Activate the Emergency Response Facilities Further updates will follow."(Repeat the message once)trtrtrtrEMERGENCY EMERGENCY ALTERNATE FACILITY(lf events are on-going or anticipated that may present a danger to normalemergency center staffi ng . )IMMINENT SECURITY EVENT (Eventsat the site may present a situation where personnel in the Protected Areawill shelter or remain sheltered.)

DRILLDRILL ALTERNATE FAGILITY (Ifevents are on-going or anticipated thatmay present a danger to normalemergency center staffing AND a drill isin progress.)

DRILL IMMINENT SECURITY EVENT(Events at the site may present asituation where personnel in theProtected Area will shelter or remainsheltered AND a drill is in progress.)

trtr WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 10 of 363.4 Dose Assessment Evaluation 11] DETERMINE if a Dose Assessment Evaluation is warranted.

lF emergency conditions warrant dose assessment THEN CONTACT Radiation Protection at 365-7865 and request theimplementation of EPIP-13 for dose assessment.

3.5 Evacuation of Non-Emergency Responders 11] lF any of the following conditions exists:o A severe weather condition is currently in progress or is projected on-site, such as a tornado.OR. An on-site security risk condition exists that may present a danger tosite personnel during the Assembly

/ Accountability process asdetermined by SED/Nuclear Security.

OR. Rapid Evacuation of the Protected Area (REPA) has beenconducted.

THEN DO NOT initiate the Evacuation ProcessANDCONTINUE in this procedure at Section 3.6.OTHERWISE continue to step [2]121 INITIATE Assembly and Accountability and evacuation of Non-Emergency Responders by IMPLEMENTING EPIP-8 WHILE continuing with thisprocedure.

3.6 Notification of Site Personnel t1l IMPLEMENT Aooendix C, "Notification of Site Personne!".

WBNUnit 0General Emergency EPIP.5Rev.0046Pase 11 of 363.7 Notification of the Nuclear Regulatory Commission (NRC)CAUTIONNotification of the NRC shall be completed immediately after notification of theappropriate State or Iocal agencies and not later than one hour after the time ofEmergency Classification.

t1] COMPLETE Appendix D, "Notification of the NRC".NOTEWhen the TSC is staffed, the open and continuous line of communications with the NRCmay be transferred to the NRC Coordinator position.

l2l lF REQUESTED by the NRC, DIRECT a member of the Operations staff(SRO if Available) to maintain an open and continuous line ofcommunications as directed by NRC.3.8 Monitor / Re-evaluate the Eventt1] Monitoring and reevaluation of plant events along with communicating significant changes should be performed continuously as a function of theemergency response.

Methods used to communicate significant changes arenot formalized and may vary depending upon staffing levels as wel! asavailability of personnel or equipment.

Aooendix E provides a systematic approach to monitoring/re-evaluation andthe communication of significant changes in plant conditions.

CONTINUE to conduct State follow-ups untilthe CECC has assumed Statecommunications responsibilities using Aooendix F'Genera!

Emergency Follow-up lnformation Form" to communicate follow-up information.

121 Reevaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.

The need to upgrade PARs is determined through the continuous assessment of Aooendix H "Protective Action Recommendations".

lF it has been determined that a PAR Upgrade is appropriate, THEN COMMUNICATE the Upgrade to the State using Appendix J "Upgrade-Protective Action Recommendation".

13] CONTINUE to assess PARs until the CECC has assumed PARresponsibilities.

WBNUnit 0Genera! Emergency EP!P.5Rev.0046Paqe 12 of 363.9 Review of Procedure 11l DIRECT a member of the staff to review this procedure ensuring that all stepshave been completed as applicable.

4.0 DOCUMENTATION

4.1 CIA RecordsThe following records are QA records when completed during actual radiological emergencies.

Appendix A - General Emergency lnitial Notification FormAppendix B - State of Tennessee Notification Appendix D - Notification of the Nuclear Regulatory Commission (NRC) (NRC EventNotifi cation Worksheet)

Appendix F - General Emergency Follow-up lnformation FormAppendix G - Technical Support Center General Emergency Classification Instruction Appendix J - Upgrade-Protective Action Recommendation.

4.2 Non.QA Recordst1] Emergency RecordsThe records generated due to declaration of an emergency classification areconsidered Lifetime Retention records.

These records shall be fonrarded tothe WBN EP Manager.

The records necessary to demonstrate performance are then submitted to the Corporate EP Manager for storage.l2l Drill and Exercise RecordsThe records deemed necessary to demonstrate performance of key actionsduring drills are considered Non-QA records.

These records shall beforwarded to the WBN EP Manager.

The WBN EP Manager shall retainrecords necessary to demonstrate eight-year plan requirements for eightyears. The WBN EP Manager shall retain other records in this category forthree years.5.0 ILLUSTRATIONS

/APPENDICES Appendix A - Genera! Emergency lnitial Notification Form WBN I General Emergency IEPIP-SUnitO I lRev.0046 Paqe 13 of 365.0 ILLUSTRATIONS

/APPENDICES (continued)

Appendix B - State of Tennessee Notification Appendix C - Notification of Site Personnel Appendix D - Notification of the Nuclear Regulatory Commission (NRC) (NRC EventNotifi cation Worksheet)

Appendix E - Monitor / Re-evaluate the EventAppendix F - General Emergency Follow-up lnformation FormAppendix G -Technical Support Center General Emergency Classification lnstruction Appendix H - Protective Action Recommendation Flowchart Appendix I - Activation of the Emergency Paging System (EPS)Appendix J - Upgrade - Protective Action Recommendation WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 14 of 36Appendix A(Page 1 ot 2lGeneral Emergency Initial Notification FormProtective Action Recommendation Worksheet

1. Determine the correct PAR using the PAR diagram (Appendix H)E Recommendation 1o Shelter 2 mile radiuso Shelter 5 miles downwindtr Recommendation
3. Evacuate 2 mile radiuso Shelter 5 miles downwindEl Recommendation
2. Shelter 5 mile radiusOtr Recommendation 5 tro Evacuate 2 mile radius and all sectors greater than oProtective Action Guidelines (PAG)a2. ldentify the affected sectors using the table belowWind direction From (46 meters):Recommendation 4Evacuate 2 mile radiusEvacuate 5 miles downwindShelter 10 miles downwindRecommendation 6Evacuate 2 mile radiusEvacuate 5 miles downwind5 Mile Radius Sectors10 Mile Downwind SectorsA1, Bl, C1, DlA1,81, C1, D1, M,82, C2, D2, A3, 84,c4, c5, c7, cg, D4,D5c7, D2, D4, D5C9, D6, D7, D8, D9A2, A3, D2, D51 1 1'- 170"A4, A5, A6, A7, D3, D682,B.4, C2231"- 270"326.- 25c6, cg, c10, c11, Dg3. Use the above information to complete page 2 of this appendix.

WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 15 of 36Appendix A(Page 2 ot 2lGeneral Emergency Initial Notification Form123tr This is a Drilltr This is an Actual Event - Repeat - This is an Actual EventThe SED at Watts Bar has declared a GENERAL EMERGENCY EAL Desisnator:

(Use only one EAL)4. Radiological Gonditions:

(Check one under both Airborne and Liquid column.)Airborne Releases Offsitetr Minor releases within federally approved limitsltr Releases above federally approved limits'tr Release information not known(1Tech Specs/ODCM)

Liquid Releases OffsiteEl Minor releases within federally approved timitsltr Releases above federatly approved limitsltr Release information not known(1Tech Specs/ODCM)

5. Event Declared:

Time:Date:6. The Meteorological Conditions are: (Use 46 meter data from the Met Tower. lF data is NOT available from the MET tower, contact the National Weather Service by dialing 1423-586-8400.

The NationalWeather Service will provide wind direction and wind speed.)Wind Direction is FROMdegreesWind Speedmph7.(15 minute average)Provide Protective Action Recommendation utilizinq Appendix H:(15 minute average)Check al! Sectors as appropriate)

A) AFFECTED SECTORSEvacuate2Mile trA1 ElBl trC1 trD15Mile EM trA3 trB2 trB4 ElC2 trC4 UCs trC7 trC8 E]D2 trD4 trDstrA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD310 MiletrD6 trD7 trD8 trD9Shelter (do not check sectors evacuated above)2 Mile tr A1tr81 trC1 trD1SMile EJA2. trA3 ElB2 trB4 ElCz trC4 trCs ElC7 trCB ElD2 trD4 trDstrA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD310 MiletrD6 trD7 trD8 trD9B) ALL OTHER SEGTORS MONITOR AND PREPARE.c) coNStDER tssuANcE oF Kt tN AccoRDANCE WITH THE STATE PLAN.Completed by (SED)Peer Checked by General Emergency EPIP.5Rev.0046Paqe 16 of 36Appendix B(Page 1 of 2lState of Tennessee Notification 1.0State Notification CAUTIONNotification of the Risk Counties

/ State of Tennessee is required to be completed within 15 minutes from the time of emergency dectaration.

FAX copy of completed Aooendix A (page 2 onry) to state of rennessee bypressing the REP 2 preprogrammed number. This will send a fax to TEMA,the ODS, the TSC, the CECC, Rhea County EMA, Meigs County EMA, andMcMinn County EMA121 REPORT the information recorded on completed Appendix A to the WBNRisk Counties and the State by pressing REP 2 preprogrammed number onthe Emergency Communication Notification System (eeruS) phone at the SMdesk (coMLAB phone). This wiil auto diar and connect the oDS, TEMAlvarning point, Rhea county EMA, Meigs county EMA, and McMinn countyEMA to a conference call.PERFORM a roll call of all required stations and deliver information.

t1IA.B.C.D.Rhea County(Alternate number)Meigs County(Alternate number)McMinn County(Alternate number)TEMA StateWarning Point1-423-775-2505 1-423-775-7929 1-423-334-3211 1-423-334-5269 1-423-744-5256 1-423-745-3222 1-900 -262-3300 1-6 15-741 -0001PersonContacted PersonContacted PersonContacted PersonContacted t3IREcoRD information from the notification Time and Date of Notification It4l IF not yet completed:

DIRECT the ODS to ACTTVATE TEENS utitizing one ofthe notifications (in Step 3.3 or below) as appropriate.

NOTEThe Time of the notification is when the State Representative answers the phone. lf anycounty fails to respond, continue with State notification and report the missed county.

WBNUnit 0General Emergency EPIP.5Rev. 0046Paoe 17 of 36Appendix B(Page 2 ot 2lState of Tennessee Notification 1.0 State Notification (continued) trtrtrtrEMERGENCY EMERGENCY ALTERNATE FACILITY(lf events are on-going or anticipated that may present a danger to normalemergency center staffi ng . )IMMINENT SECURITY EVENT (Eventsat the site may present a situation where personnel in the Protected Areawill shelter or remain sheltered.)

DRILLDRILL ALTERNATE FACILITY (Ifevents are on-going or anticipated thatmay present a danger to normalemergency center staffing AND a drill isin progress.)

DRILL IMMINENT SECURITY EVENT(Events at the site may present asituation where personnel in theProtected Area will shelter or remainsheltered AND a drill is in progress.)

trtrt5] lF REP 2 voice connection fails,THEN CONTACT the State of Tennessee by pressing the TEMApreprogrammed number.t6] lF both preprogrammed voice connection buttons failto work,THEN REPORT to the State of Tennessee the information on Appendix Autilizing:

Primary:

1-800-262-3300 Backup: 1-615-741-0001 l7l lF fax REP 2 preprogrammed number(s) does not workA. Rhea County 1423-775-6816 (Rhea EMA)(Alternate fax numbers) 1 423_TTS_5042 (Rhea 91i)B. Meigs County 1423-3344316 (Meigs EMA)(Alternate fax number) 1423-334-3165 (Meigs 911)C. McMinn County 1423-744-5271 (McMinn EMA)(Altemate fax number) 1423-744-8043 (McMinn 911)D. TEMA State Warning Point 1-615-242-9635 (Alternate fax number)E. ODS fax '1423-751-8620 t8] RETURN the completed Aooendix B and Aooendix A to the SED.

WBNUnit 0General Emergency EPIP.5Rev. 0046Pase 18 of 36Appendix C(Page 1 of 1)Notification of Site Personnel 1.0 Conduct Notification of Site Personnel t1] ENSURE a copy of EPIP-S. Aooendix A used for the State Notification hasbeen faxed to TSC at 365-83GS and CECC attil-1682.

l2l lF the emergency has been declared based upon a security related eventTHENA. DELAY making notification steps 1.0[3] through 1.0t61B. NOTIFY the Shift Manager of the delayC. Periodically MONITOR the event until such time that the Shift Managerdetermines the present danger has subsidedORThe Shift Manager suspends notification steps 1.0[3] through 1.016IOtherwise continue in this procedure t3l NOTIFY Nuclear Security (NS) Shift Supervisor at Plant Extension 365-8464or 8495. INFORM NS that a "GENERAL EMERGENCY HAS BEENDECLARED" AND DIRECT NS to activate EPIP-11, "security and AccessControl".

141 NOTIFY the Chemistry Lab at Plant Extension 365-8330 or 8339. INFORMChemistry Lab personnelthat a "GENERAL EMERGENCY HAS BEENDECLARED" tsl NOTIFY the RP Lab at Plant Extension 365-8300 or 7865. TNFORM RP LabPETSONNEIthAt A "GENERAL EMERGENCY HAS BEEN DECLARED" ANDDIRECT RP Lab personnelto implement as applicable EPIP-14, "Radiotogical Control Procedure".

t6] NOTIFY the "On-Call" NRC Resident at Plant Extension 365-1776 (Secretary) or from Weekly Duty List. INFORM NRC Resident that a "GENERALEMERGENCY HAS BEEN DECLARED" 2.0 Return completed Apoendix c to the site Emergency Director.

WBNUnit 0General Emergency EPIP.5Rev.0046Paoe 19 of 36Appendix D(Page 1 ot 2lNotification of the Nuclear Regulatory Gommission (NRC)(NRC Event Notification Worksheet)

NOTES1) Utilize the NRC Emergency Notification System (ENS) when available or if the NRCENS is inoperable or unavailable utilize any plant telephone.

2) Ensure prior to making this notification that all previously made emergency classifications have been communicated.

Fast breaking plant conditions may haveresulted in classifications that have not been officially communicated.

3) Utilize completed Aooendix A for determining information below.1.0 Complete the NRC Event Notification Worksheet below (afterStep 3.0)2.0 Utilize the following telephone numbers when making thisnotification.

(Dialing 1 may be required)

Main 800-532-3469 OR 301-816-5100 o Backup 1 800-449-3694 OR 301-951-0550 Backup 2 301-415-0550 Backup 3 301415-0553 Fax 301-816-5151

. Region lV (alternate site) 817-860-8100 General Emergency EPIP.5Rev.0046Paqe 20 of 363.0Appendix D(Page 2 ot 2lNotification of the Nuclear Regulatory Gommission (NRC)(NRC Event Notification Worksheet)

Provide the following information to NRC. Be prepared toanswer other questions directed from the NRC based upon theevent.Time NRC NotifiedFacilityWBNAffected UnitTVA ContactNRC ContactTime ofGlassification

/EasternGlassification DatePower/Mode BeforePower/Mode AfterCall Back NumberENS Telephone 423-365-1422 TVA Gontact423-365Emergency Classification GENERALEMERGENCY Emergency ActionLevel Designator Brief Description of Emergency Action LevelProtective ActionRecommendations (GE ONLY)lf known whenstaffed PARdeveloped bycEccComments4.0 RECORD the NRC Event Notification Number (will be provided by the NRC)5.0 RETURN the completed Appendix D to the Site Emergency Director.

WBNUnit 0General Emergency EPIP-5Rev.0046Paqe 21 of 36Appendix E(Page 1 ot 2lMonitor / Re-Evaluate the Event1.0 Monitor / Re-Evaluate t1] Re-evaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.

The need to upgrade PARs is determined through the continuous assessment of Appendix H "Protective Action Recommendation Flowchart".

lF it is determined that a PAR upgrade is appropriate THEN COMMUNICATE the Upgrade to the State using Apoendix J "Upgrade-Protective Action Recommendation" l2l lF significant changes in plant conditions occur, DIRECT a SRO toCOMPLETE Aooendix F "General Emergency Follow-Up lnformation Form".l3l COMMUNICATE the Aopendix F information to:. On-Site Emergency Centerso Plant personnel through PA announcements (if applicable) o CECC (751-1614) o ODS (751-1700 or 751-2495),

when the CECC is not activated

. State of Tennessee when the CECC is not activated 24 HoursPrimary:

1-800-262-3300 Backup: 1-6 15-741 -0001o Nuclear Regulatory Commission (refer to Appendix D)Otherwise Continue in this Appendix.

WBNUnit 0Genera! Emergency EPIP-5Rev.0046Paqe 22 of 362.43.0Appendix E(Page 2 ot 2lMonitor / Re-Evaluate the EventEvacuation of Non-Emergency Responders l1l lF Evacuation of Non-Emergency Responders has not been performed THEN RE-EVALUATE the following conditions to determine the ability toperform an evacuation A. A severe weather condition is currently in progress or is projected on-site, such as a tornado.ORB. An on-site security risk condition exists that may present a danger to sitepersonnel during the Assembly

/ Accountability process as determined by SED/Nuclear Security.

ORC. Rapid Evacuation of the Protected Area (REPA) has been conducted.

lF conditions permit evacuation of Non-Emergency Responders.

A. THEN INITIATE evacuation of Non-Emergency Responders inaccordance with EPIP-8, "Personnel Accountability and Evacuation" WHILE continuing with this procedure.

Termination

/ Recoveryt1l lF conditions warrant termination of the emergency classification, THEN ENTER EP!E!*, "Termination and Recovery Procedure" and exit thisprocedure l2l WBNUnit 0Genera! Emergency EPIP.5Rev.0046Paqe 23 of 36Appendix F(Page 1 ot 2lGeneral Emergency Follow-Up Information Form1. tr This is a Drill tr This is an Actual Event2. The SED at Watts Bar has declared a GENERAL EMERGENCY

3. Reactor Status:Unit 1: tr SHUT DOWN E At Power tr Refueling tr N/AUnit 2: tr SHUT DOWN E At Power tr Refueling tr N/A4. Additional EAL Designators:
5. Significant Changes in Plant Conditions:
6. Significant Ghanges in Radiological Conditions:
7. Onsite Protective Actions:Assembly and Accountability Site Evacuation trNotrNotr lnitiated tr lnitiated tr Completed E Completed
8. The Meteorological Gonditions are: I Wind Speed:mph(Use 46 meter data on the Met Tower)(15 minute Average)Wind Direction is from:_ degrees WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 24 of 36Appendix F(Page 2 ot 2lGeneral Emergency Follow-Up Information Form9. Offsite Protective ActionsA) AFFECTED SECTORSEvacuate2Mile trA1 trBltrcl trD1EM trA3 EJB,2 trB4 EC2 trC4 trCs trC7 trC8 rlD2 trD45 MiletrD5trA4 trAs trA6 trA7 trB3 tr85 trC3 trC6 trCg trC1o trC1110 MiletrD3 trD6 ElD7 trD8 trD9Shelter (do not check sectors evacuated above)2Mile trA1 tr81 trC1 trD1EM trA3 rlB2 tr84 ElC2 trC4 trCs EC7 trC8 rlD2 trD45 MiletrD510 trA4 trAs trA6 trA7 trB3 trBs trC3 trC6 trCg trC1O trC11Mile trD3 trD6 trD7 trD8 trD9B) ALL OTHER SECTORS MONTTOR ANDPREPARE.C) CONSIDER ISSUANGE OF KI IN ACCORDANCE WITHTHE STATE PLAN.10. Please repeat the information you have received to ensure accuracy.
11. Fff to applicable contact after reporting follow-up information:

CEGC Director at(151-1682) or ODSat (751-8620) or TEMA at(1-615-242-9635).

Completed by:Date/Time:

Eastern Time WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 25 of 36Appendix G(Page 1 of 5)Technical Support GenterGeneral Emergency Glassification Instruction NOTES1) Procedure steps can be performed concurrently.

2) Procedure steps 1.0[1] and 1.0[3] CANNOT be delegated, except as prescribed.

Allother procedure steps can be delegated.

1.0 NOTIFICATION OF STATE OF TENNESSEE t1l CECC Notification A. RECORD the following information:

GE Classification EAL Designator:

GE Classification declared at time:Site Emergency Director:

(Name)B. Contact the CECC Director utilizing the CECC direct ring downtelephone or at extension 751-1614, C. COMMUNICATE the information recorded in step 1.0 [1] A.l2l lF the CECC Director was contacted, THEN the state of Tennessee notification action is complete.

RE-ENTER thisappendix at Section 2.013] !F the CECC Director was NOT contacted, THEN COMPLETE the State of Tennessee notification A. COMPLETE Aopendix A andB. COMPLETE Aooendix B, "State of Tennessee Notification" (This may bedelegated to the Ops Communicator, Ops Manager or the EP Manager)

WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 26 of 36Appendix G(Page 2 ot 5lTechnical Support CenterGeneral Emergency Glassification lnstruction 2.0 Notification of Site Personnel CAUTIONOngoing or anticipated security events may present danger to site personnel.

Do notconduct the notification of site personnel PA message during an ongoing oranticipated security event. All pertinent site personnel PA messageJwill beconducted per 1-Aol-,42.01 "security Events" for securityr events.11] DIRECT a member of the TSC to CONDUCT a Plant PA announcement similar to the following:

(Dial487 to obtain the plant pA)"Attention All Personnel.

Attention All personnet.',

A General Emergency Glassification has been declared.

The Watts Bar Emergency Plan is being implemented at this time.Further updates will follow.,'

(Repeat Message)3.0 Dose Assessment Evaluation t1l lF emergency circumstances warrant dose assessment, THEN DIRECT Radiation Protection to implement EPIP-I3 lnitial DoseAssessment For Radiolooical Emeroencies.

WBNUnit 0General Emergency EPIP.5Rev. 0046Paoe 27 of 36Appendix G(Page 3 of 5)Technical Support CenterGeneral Emergency Classification I nstruction 4.0 Evacuation of Non-Emergency Responders t1l INITIATE Assembly and Accountability A. lF any of the following conditions existso A severe weather condition is currently in progress or is projected on-site, such as a Tornado.ORo An on-site security risk condition exists that may present a danger tosite personnel during the Assembly

/ Accountability process asdetermined by SED/Nuclear Security.

OR. Rapid Evacuation of the Protected Area (REPA) has beenconducted.

THEN DO NOT initiate the Evacuation ProcessANDCONTINUE in this procedure at Section 5.0I21 INITIATE Evacuation of Non-Emergency Responders A. INITIATE EP!89, WHILE continuing with this appendix WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 28 of 365.0Appendix G(Page 4 of 5)Technical Support CenterGeneral Emergency Classification Instruction Notification of the Nuclear Regulatory Gommission (NRC)CAUTIONNotification of the NRC shall be completed immediately after notification of theappropriate State or local agencies and not later than one hour after the time ofEmergency Classification.

DIRECT the TSC NRC Coordinator to implement Aooendix D, "Notification ofthe NRC".lF REQUESTED by the NRC to maintain an open and continuous tine ofcommunications, DIRECT TSC NRc Coordinator to maintain and or managean open and continuous line of communications as directed by NRC.6.0Monitor / Re-evaluate the eventRecord when the state commenced evacuation of the 2 mire radius.Time evacuation commenced:

l2lMonitoring and re-evaluation of plant events along with communicating significant changes should be performed continuously as a function of theemergency response.

Methods used to communicate significant changes arenot formalized and may vary depending upon staffing levers as well asavailability of personnel or equipment.

Aooendix E provides a systematic approach to monitoring/re-evaluation andthe communication of significant changes in plant conditions.

GONTINUE to conduct State follow-ups until the cEcc has assumed Statecommunications responsibilities using Aooendix F "Generar Emergency Follow-up lnformation Form" to communicate follow-up information.

Re-evaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.

The need to upgrade PARs is determined through the continuous assessment of Aooendix H "Protective Action Recommendations".

lF it has been determined that a PAR Upgrade is appropriate, THEN GOMMUNICATE the Upgrade to the state using Aooendix J "upgrade-Protective Action Recommendation" t1Il2lt1It3I WBNUnit 0General Emergency EPIP.5Rev.0046Paoe 29 of 36Appendix G(Page 5 of 5)Technical Support GenterGeneral Emergency Classification Instruction 6.0 Monitor / Re-evaluate the event (continued) 141 Gontinue to assess PARs untilthe CECC has assumed PAR responsibilities.

7.0 Procedure Reviewt1l DIRECT a member of the staff to review this procedure ensuring that all stepshave been completed as applicable.

WBNUnit 0General Emergency EPIP.5Rev.0046Pase 30 of 36Appendix H(Page 1 ot 2lProtective Action Recommendation Flow ChartINITIAL PROTECTIVE ACTION RECOMMENDATTON FLOWCHART Note l: lF flflchart declslon block condlfiona arc unknown THEN ansr NO.Noto 2: state agencl*s hav* Prcvldad prlor knotivledge of offstte Impeatmeniiio sEcuaflon Note 3:Note 4:Note 5:(such a3 floodlng' brldg.rmd cb3ur6, ctc.j ana rq@mnrGnd that any needea ini snoura bG sh*tter.A ahort te]m ElGs* 18 daflnad a8 "a rolaasothat does not axc*ed a l-5 mlnut* duraton,'.

RPSA ftr BFN EAL 2.342OR EAL 4.t*.RPSA for soN,wBN 18 d.finad a8 a lo8s of cortalnmont bamer (EAL i.3) AND ElTHER z2o,a chd damag! (EAL 1.3.5) oRa rcleaae ln progEss that exccd8 pAG Etu6 (EAL Z.f (GED.'r Rec 2 :,1ir SheJter 5 ml Radtue,,!

there a shott-term controlled release whercaincar plart areas cannot beevacuated bcfore plumeal? (See Note 3therc a knowrioffslte lmpedlment toevtcurtlon?

ls this a RapldlyProgresslng SevereAccident (RPSA)See Note 4 or 5lEuacude 2 mi RadlusEuacuate 5 mi DWEYacuate 2 mi RadlusSheltter 5 rml [lllll7 Recl. \Sheltgr 2 nrl RadlusEvacuate 2 rrri RadiusShe]ter 5 rni tttllf WBNUnit 0General Emergency EPIP.5Rev.0046Paqe 31 of 36Appendix H(Page 2 ot 2lProtective Action Recommendation FIow Chartr Shift in 15 rnin aur{. wand dr.ctaon rc..dtang anadditaorlal 3.ctor3 bdng .tf.ci.d.

o State provide-anformaaaon tha otfJaaa arr?.dam.rt3 nolonCcr.xara INC) rcl...c an progt -).o Ho:tilc Actaon Evura h.r b.an t.rmant.d.

o E2(}lt clad dam.g. (Ac. ilot. t!.. sat. .p.aafe tam. h!. .hp..d .aric. 2 mt r.dh.r..v.cualion cofirn.nc.d (lfil l:4O. tclil l:55, U\rEL {:4O1.r- R.cZ ,l. sh.lt.r 3 rnl Redlur ,lNote 1:NoG 2:Noil.3:NoG4:Not.6:PROTECTIVE ACTTON RECOMMENDATIONS(PAR)

UPGRADElFflowahart dccblon block condltlons arc unknown THEN angwer NO.6tatc agcnclc.

h.v. prEvld.d prlor knowlcdge of offolte lmpcdlments to evacuatlon (3uoh ar rloodlng, brldg.rtod cloeur!3, rtc.) and rccommcnd that any needed PAR *hotlld bc 3hcltcr.R.fGr to.ltc EALr (BFN 2.3{it, SOil 1.3.6. WBN 1.8.6}, Chemlstry sample, or Corc Damagc A33e33mcnt.

RPaA tor BFN EAL 2.9*2 OR EAL4.i*.RPEA fo, SCINTWBN 13 dcflncd a3 a lo(ra of contalnment barrlcr (EAL f .S) ANO EITHER =29,6 clad damagp (EAL f .t.6) OR. rrlc... ln progrt.3 ihlt .xcc.ds PAG valu.e (EAL 7.'l (GE))-Plant eondltlon.

..c undcr3tood (Eource tcrml Relea3e pethuray undcr3tood (flltcrcdrunflltcrcd, alcvat.d, monltor.d),

.nd mctcorologleal lnformstlon lB avallabla.

Conlkl.r gh.!t.r for 3hort tcrm lrlca3c lf accurat.h/

proJeqted to be =1 5 mlnutc3 ln duratlon and coniroll.d (c.gt , controllGd vcrtilng of cont.lnmcnt).

Not S:Xot T:

WBNUnit 0General Emergency EPIP.5Rev. 0046Pase 32 of 361.0Appendix I(Page 1 ot 2)Activation of the Emergency Paging systemAlternate ERO Activation Activate the Emergency Paging System (EpS)11] PREss the EPS cRT screen once to activate the paging options121 PRESS the appropriate option as instructed by the SEDo DRILL. EMERGENCY o STAGING AREAI3l PRESS the SIARf button to initiate the optionORPRESS the ABORf button to deny the option requestl4l lF the EPS fails to operate tocaily, coNTAcr the oDS at751-1700 or751-2495 and DIREGT the ODS to activate the notification system (TEENS ispreferred; EPS is Alternate) for WBN.15] lF the EPS FAILS to operate either locally or by the ODS exit this step andre-enter this Appendix at Section 2.0Otherwise continue in this procedure.

1)NOTESThe Emergency Paging System (EPS) consists of a dedicated touch screen CRT.Activation of any screen feature requires the user ptace their fingertip within theboundary of the select button and leave it there for at least 1 second. The CRT Screenwill normally display a large rectangle that indicates that the paging system is available but currently inactive.

lf the EPS fails to operate, contact the SM/SED immediately.

Request that the ODS becontacted to initiate the notification system (TEENS is preferred EPS is Alternate) fromtheir location.

2)

WBNUnit 0General Emergency EPIP.5Rev. 0046Paoe 33 of 36Appendix I(Page 2 ot 2lActivation of the Emergency Paging SystemAlternate ERO Activation 1.0 Activate the Emergency Paging System (EPS) (continued) 16l MONITOR the Paging System Terminal DisplayNOTEMonitor ERO positions through OSC Document Control.

Positions below OSC DocumentControl are courtesy pages and are not subject to call-out requirements.

A. lF A'NO" response is observed, ORThe position being paged has not responded promptly or withinapproximately 20 minutes,THEN UTILIZE the Weekly Duty List and aftempt to contact the positionrepresentative with available information.

(No Fitness for Duty questionis required.)

B. IF The individual cannot be reached utilizing the Weekly Duty List,THEN UTILIZE the Call-Out List and attempt to contact an alternate position representative.

(Fitness for Duty question is required whenutilizing the Call-Out List.)2.0 ALTERNATE BACKUP ERO ACTIVATION

- Manual Gall'Outt1] UTILIZE the current Weekly Duty List and contact positions as listed. (NoFitness for Duty question is required.)

l2l lf a position cannot be reached from the current Weekly Duty list, then refer tothe Call-out List as applicable to fill all vacant positions.

(Fitness for Dutyquestion is required when utilizing the Call-Out List.)t3] CONTINUE until all positions have been filled.

WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 34 of 36Appendix J(Page 1 of 3)Upgrade - Protective Action Recommendation Protective Action Recommendation Worksheet

1. Determine the correct PAR using the PAR diagram-trRecommendation 1Shelter 2 mile radiusShelter 5 miles downwindootrRecommendation 2Shelter 5 mile radiusatrRecommendation 3Evacuate 2 mile radiusShelter 5 miles downwindootrRecommendation 4Evacuate 2 mile radiusEvacuate 5 miles downwindShelter 10 miles downwindaaOtr Recommendation 5o Evacuate 2 mile radius and all sectors greater thanProtective Action Guidelines (PAG)uRecommendation 6Evacuate 2 mile radiusEvacuate 5 miles downwindoO2. ldentify the affected sectors using the table betowWind direction From:degrees2 Mile RadiusSectors5 Mile RadiusSectors5 Mile DownwindSectorsWindDirection From10 Mile Downwind SectorsA1, Bl, C1, DlA1, 81,C1, D1, M82, C2, D2, A3, 84c4, c5, c7, cg, D4D5c7, D2, D4, D5260- 680C9, D6, D7, D8, D9A3, D2, D4, D569"- 1 10"42, A3, D2, D5111"- 170"A4, A5, A6, A7, D3, D6M,A3,B,2,B.4,C2 171"- 230.A5, A6, A7,83, 8582,B.4, C223',a"- 270"85, C3B,2, C2, C4, C52710- 3250B3,C3, C6, C11c2, c4, c5, c7, cg,D4326"- 25c6, cg, c10, c11, Dg WBNGeneral Emergency IEPIP-SUnitO I lRev.0046 Paqe 35 of 36Appendix J(Page 2 of 3)Upgrade - Protective Action Recommendation
3. ldentify any affected Sectors from previous PARs.Evacuate2 Mile tr A1tr81 trC1 trD1SMile EM trA3 ElB2 tr84 ElCz trC4 trCs ElC7 trC8 EJD2 trD4 trDstrA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC1l trD310 MiletrD6 trD7 trD8 trD9Shelter (do not check sectors evacuated above)2 MiletrA1 tr81 trC1 trD15Mile EM trA3 ElB2 tr84 ElCz trC4 trC5 ElC7 trC8 ElD2 trD4 trD5trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD3l0 MiletrD6 trD7 trD8 trD9o lf a sector was previously sheltered and now is to be evacuated it should only be listed as evacuate.

o Once a Sector has been recommended to be evacuated it cannot be recommended for sheltering

4. Use the above information to complete page 3 of this appendix WBNUnit 0General Emergency EPIP.5Rev. 0046Paqe 36 of 36Appendix J(Page 3 of 3)Upgrade - Protective Action Recommendation
t. I u rnis is a oritt g tnis is an Actual Event - EeEc! - This is;; AcGt Eve;2. watts Bar has declared a GENERAL EMERGENCY
3. Watts Bar is making a PAR UPGRADE.4. The Meteorological Conditions are: (Use 46 meter data from the Met Tower. lf data is not available from the METtower, contact the National Weather Service by dialing 142&58&8400.

The National Weather Service will providewind direction and wind speed.)Wind Direction is FROM:degrees Wind Speed:mph(15 min average)(15 min average)5. Provide Protective Action Recommendation utilizing Appendix H: (Check all sectors 9s appropriate)

A) AFFECTED SECTORS-IEvacuate2Mile trA1 tr81 trCl trD15Mile EM trA3 ElB2 trB4 rlc2 trc4 trcs Elct trc8 t]D2 trD4 trDstrA4 trA5 trA6 ElA7 tr83 tr85 trC3 trC6 trC9 trClO trC11 trD310 MiletrD6 trD7 trD8 trD9shelter (do not check sectors evacuated above)2Mile trA1 tr81 trCl trD1SMile EM trA3 ElB2 trB4 Ec2 trc4 trcs trcr trcB rlD2 trD4 trDstrA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trClO trC11 trD310 MiletrD6 trD7 trD8 trD9B) ALL OTHER SECTORS MONITOR AND PREPARE.C} CONSIDER ISSUANCE OF KI IN ACCORDANGE WITH THE STATE PLAN.6. Please repeat the information you have received to ensure accuracy.

State of rennessee FAx number 1-61 s-242-963s Completed byApproved by (SED)

ENCLOSURE 2WATTS BAR NUCLEAR PLANT, UNIT OEPIP Screening Evaluation FormEPIP-6, Activation and Operation of the TechnicalSupport Center (TSC), Revision 0049 EPDP-17 , Attachrnent 2Screening Evaluation FormEvaluation No.: WBN-2016-014 Activity Scope: I BLOCK 2X The activity is a change to the radiological emergency plan (includes EPIPs or any otherdocument describing the programmatic methods for maintaining preparedness orresponding to an emergency).

[Go to Blocli 3]tr The activity is not a change to the radiological emergency plan. lGo tct Blor:t< 5lChangeType:

I BLOGK3X The change is editorial or typographical.

iGri ln 91,,,,trt 7 jI The change is not editorial or typographical

. [(;r-) h) 8/lr;L -tlConformance:

I BLOCK 4n The change conforms to an activity that has prior approval.

Record the prior approved activity:

lGtt lo tslttt:li 7jtr The change does not conform to an activity that has prior approval.

[$p tct Elot:h 5]Activity Description and

References:

I BLOCK {Activity is Revision 49 to EPIP-6:Corrected procedure titles for NPG-SPP-14.1 and NPG-SPP-O3.21 and procedure number foro-Tt-12.19 Deleted lnterface documents that are no longer applicable to EPIP-6 and added RCI-104.

Areview of the deleted documents showed that their inclusion on this list was no longer needed.Deleted reference Materials and Equipment List (Appendix V) (CR 1190970).

This list isredundant to information found in EPIP-12.

Updated Appendix references throughout documentAppendix C - Added space to reference SED priority related to action request (CR 1202372).

This additional space on the form does not change the intent or use of this form, only allows anadditional piece of information to be included.

Appendix P - Reformatted first bulleted item to conform with procedure template format.Appendix S - Changed reference to condenser vacuum exhaust mid and high range monitorsfrom 1-RE-90-404A and 4048 to 1-RE-90-255 and 256 (CR 1190962).

1-RE-404A and 4048are no longer used at WBN. These numbers have been changed in the plant to 1-RE-90-255 and 256. They perform the same function.

These changes are all considered to be editorial in nature. They do not change the intent or therequirements of this procedure.

They do not require any additional work for any of the positions in the Technical Support Center.Page 1 of 3 EPDP-I 7, Attachment 2Screening Evaluation FormEvaluation No.: WBN-2016-014 Planning Standard lmpact Determination (Check All Applicable):

n 50.47(bX1)

- Assignment of Responsibility (Organization Control)tr 50.47(bX2)

- Onsite Emergency Organization n 50.47(bX3)

- Emergency Response Support and Resources tr 50.47(bX4)

- Emergency Classification System .n 50.47(bX5)-

Notification Methods and procedures "tr 50.47(bXO)-EmergencyCommunications tr 50.47(bX7)

- Public Education and tnformation n 50.47(bXB)-

Emergency Facility and Equipment tr 50.47(bxg)

- Accident Assessment

  • tr 50.47(b)(10)

- Protective Response

  • ! 50.47(bX11)

- Radiological Exposure Controtn 50.47(b)(12)

- Medical and Pubtic Heatth Supporttr 50.47(bX13)

- Recovery and Reentry Planning and Post-Accident Operations tr 50.47(bX14)

- Drilts and Exercises tr 50.47(bX15)

- Emergency Responder Trainingtr 50.47(bX16)

- Emergency Plan Maintenance n 72.44(f)-

lndependent Spent Fuel Storage lnstailation (tSFSl)If ;'trt1' Plttrrrttn;l Slartt/arrls rntstar;le<l gts to Block 7 lf rtrsne are tntpaclecl.

c1o to Btocti 6lBLOCK 5* Denofes Risk Significant Planning StandardGommitment lmpact Determination:

LtB-t-ggt<e tr The activity involves a site specific EP commitment.

Record the Commitment or Commitment reference:

lGo lo Bktr:h 7ltr The activity does not involve a site specific EP commitment.

[Go to Btock 7]Page 2 of 3 EPDP-17, Attachmentz Screening Evaluation FormEvaluation No. : WBN-2016-01 4scruentng Evaluaton Regults:

-IE The activity can be implemented without performing a 50.54(q) reduction in effectiveness evaluation.

tr The activity cannot be implemented without performing a 50.5a(q) reduction ineffec'tiveness evaluation.

Approvals:

Preparer Name:Michael R. WhitePreparer Signature:

  • 44%Date:fi/r*/ teReviewer Name:Thomas F. Detchemendy Date:8l st lzowPage 3 of 3 Watts Bar Nuclear PlantUnit 0Emergency Plan lmplementing Procedure EPIP.6Activation and Operation of the Technical Support Genter (TSC)Revision 0049Quality RelatedLevel of Use: Reference UseEffective Date: 09-02-201 6Responsible Organization:

REP, Radiological Emer. Prep.Prepared By: Michael R. WhiteApproved By: Thomas F. Detchemendy WBNUnit 0Activation and Operation of theTechnical Support Center (TSG)EPIP.6Rev. 0049Paqe 2 of 74Revision LogRevisionor GhangeNumberEffective DateAffectedPageNumbersDescription of Revision/Change Rev 4409127 11322-23167BSection 4.1 , added applicable appendices toQA records section.

PER 724038Section 3.3.E.3, Added instruction for turnoverof ERO positions in the TSC if relieving aprevious shift. PER7670B0 Added a signature line to attachment Y.sR 7851 99Rev 4505/06 1146269-72Removed reference to the facilityclassification/clock marquee which is no longerinstalled in the TSCRevised Appendix S to align with the fleetRev 4612t08t142231444649,5360151850, 61, 62,6351Added note that Ops Manager m ay anitiate TSCbriefing if SED is unavailable.

Added Normal Work Process Deviation information.

(PER 925653)Added additional guidance for the Maintenance Manager regarding the establishment of OSCteams and maintenance of the teams statusboard.Updated the names of status boards and "REP"vehicle and corrected spelling and grammatical errors.Removed reference to the CECC computer.

Removed reference to smoking in the facilities Added note to TSC Logkeeper responsibilities stating that Web EOC is the preferred methodof maintaining facility logs.Revised step 3.3.B to allow the SED to activatethe TSC once responders for the requiredminimum staffing positions are identified aspresent in the TSC. (PER 933425)

WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 3 of 74Revision LogRevisionor ChangeNumberEffective DateAffectedPageNumbersDescription of Revision/Ghange Rev 4710-30-1514-2122232528,29,32, 36, 37 and3B36, 37 and3831, 39, 41,43, 45, 47,49,51, 54,56, 60, 62,63, 653031333713Added NPG-SPP-18.3 and EPIP- 14 to list ofinterfacing documents.

Added unit designators to appropriate procedures Changed OSC to TSCRearranged steps for filling out and routingAppendix C in order to better clarify instructions.

Added Appendix R Fire to examplesAdded "radiological" to step 3 .4.F.1 in order tospecify which type of habitability survey shouldbe performed Changed records retention to eight yearsRearranged and added blocks to Appendix Band Appendix D, in order to make the status ofUn,t 2 more clear (CR 101 8225)Added space to record EAL, release point andrelease type in SED Turnover Datasheet.

Alsoadded clarifying words to SED TurnoverDatasheet in several places.Added bullet "Sign in on TSC Sign ln Roster"and instruction to notify SED of arrival toAppendices that did not have those instructions Made format changes to Appendix C toincrease usability Added instructions to SED to Declare the TSCactivated and added notation clarifying thatchecklist completion is not required for facilityactivation.

Deleted requirement to collectchecklist from TAT Leader and TAT TearnRemoved reference to ODS in third bulletAdded protective action recommendations 4, 5and 6 to SED Turnover Datasheet (CR 979327)

WBNUnit 0Activation and Operation of theTechnical Support Genter (TSG)EPIP.6Rev. 0049Paqe 4 of 74RevisionLogRevisionor GhangeNumberEffective DateAffectedPageNumbersDescription of Revision/Change Rev47(cont)384245515261626466747678Added place for SED to record time forassuming SED responsibilities Changed Station Technical Advisor to ShiftTechnical Advisor.

Added MCR staffingnumbers for two unit operation and addednotation that the AUOs may be assigned to theOSCAdded comment stating th e 4104 telephone bridge is available to appendix H.Reworded statement regarding habitability toclarify responsi b i I ityAdded "if necessary" to second bulletAdded bullet directing the EP Manager tochange the classification signAdded bullet directing the Log Keeper toestablish video link with the OSCAdded bullet directing the clerk to fax/scanappendix C to the OSCreworded first bullet to clarify intentchanged instructions to send Appendix T fromthe CECC RAC to the Plant Assessment Team.Added Unit 2 Technical Specifications Removed columns for "replacement within 12hou rs"Rev 4804101 11665Revised bullet to add the reference toprocedure RCI-104 for determining RCSactivity.

(CR 1 10BO 14)

WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 5 of 74Revision LogRevisionor GhangeNumberEffective DateAffectedPageNumbersDescription of Revision/Change Rev 49091021168,72912,13,1 5,21 ,38,60,7226586BCorrected procedure titles for NPG-SPP-1 4.1and NPG-SPP-O3.21 and procedure number for0-Tl-12.

19Deleted Interface documents that are no longerapplicable to EPIP-6 and added RCI-104Deleted reference Materials and Equipment List(Appendix V) (CR 1 190970),

Updated Appendixreferences th roughout docu ment.Added space to reference SED priority relatedto action request (CR 1202372)Reformatted first bulleted item to conform withprocedure template format.Changed reference to condenser vacuumexhaust mid and high range monitors from 1-RE-90-4044 and 4048 to 1-RE-90-255 and256(CR 1 1e0e62)

WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 6 of 74Table of Contents1.0 PURPOSE ..............8

2.0 REFERENCES

........

................

83.0 INSTRUCTTONS

.... 104.0 RECORDS ............21 Appendix A: TSG Facility Layout Diagram ................22 Appendix B: Facility Briefing Guide......

....24Appendix C: Action Request Form ...........26 Appendix D: SITE EMERGENCY D1RECTOR.............

.................27 Appendix E: SITE VICE PRES1DENT..............

............35 Appendix F: OPERATIONS MANAGER.........

.............37 Appendix G: TECHNICAL ASSESSMENT MANAGER ................

39Appendix H: MAINTENANCE MANAGER ...................41 Appendix l: OPERATIONS COMMUN!CATOR..............

.............43 Appendix J: NUCLEAR SECURITY MANAGER ......,..45 Appendix K: RP MANAGER ........

...............47 Appendix L: CHEMISTRY MANAGER........

................

50Appendix M: NRC COORD!NATOR..............

...............52 Appendix N: CONTROL ROOM COMMUNICATOR...

..................54 Appendix O: EP MANAGER........

...............

56Appendix P: TSC LOGKEEPER

..................58 Appendix Q: TSC CLERICAL STAFF .........59 Appendix R: TECHNICAL ASSESSMENT TEAM ....... 61Appendix S: Plant Parameter Data Sheets ................64 Appendix T: Predictive Release Data Sheet...............

................70 Appendix U: TSC Accident Assessment Summary Sheet ........71 WBNUnit 0Activation and Operation of theTechnical Support Genter (TSG)EPIP.6Rev. 0049Paqe 7 of 74Appendix V:Appendix W:Appendix X:Table of Contents (continued)

EMERGENCY RESPONDER NOTIFICATION FORM ..............72 WBN TSC Sign ln Roster. ......73TSC LOG .................74 WBNUnit 0Activation and Operation of theTechnical Support Center (TSG)EPIP.6Rev. 0049Paqe 8 of 741.02.02.12.2PURPOSEThe purpose of this Procedure is to describe activation of Technical Support Center(TSC), describe the TSC organization, and provide for TSC operation once it hasbeen staffed.REFERENCES Source Documents:

A. Tennessee Valley Authority Nuclear Power Radiological Emergency Plan (REP)B. NPG-SPP-14.1, Fitness-For-Duty and Fatigue Management C. NPG-SPP-03.21, Fatigue Rule and Work Hour LimitsD. Memo from J. B. Hosmer to R. J. Johnson dated '1115188, RIMS No. B25 880115028E. NUREG 0654, FEMA-REP-1, Rev. 1, Criteria for Preparation and Evaluation ofRadiological Emergency Response Plans and Preparedness in support ofNuclear Power PlantsNUREG 0696, Functional Criteria for Emergency Response Facilities, FinalReportANSI Standard N 18.7-1976 CFR 20, Standards for Protection From Radiation EPA 400-R-92-001, Manual of Protective Action Guides and Protective Actionsfor Nuclear lncidents NRC Generic Letter 96-06, Assurance of Equipment Operability andContainment Integrity During Design Basis Accident Condition Response Technical Manual (RTM) 96 Vol. 1 Rev. 40-Tl-12.19, Control of Time Critical OperatorActions lnterface Documents A. EPIP-1 Emergency Plan Classification LogicB. EPIP-Z Notification of Unusual EventC. EPIP-3 AlertF.GHl.J.K.L.

WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 9 of 742.2 Interface Documents (continued)

D. EPIP-4 Site Area Emergency E. EPIP-5 General Emergency F. EPIP-7 Activation and Operation of the Operations Support CenterG. EPIP-8 Personnel Accountability and Evacuation H. EPIP-11 Security and Access Controll. EPIP-13 lnitial Dose Assessment for Radiological Emergencies J. EPIP-14 Radiological Control ResponseK. EPIP-15 Emergency Exposure Guidelines L. EPIP-16 Termination of the Emergency and RecoveryM. NPG-SPP-18.3 Emergency Preparedness N. RCI-104 Radiological Response To Abnormal Plant Conditions O. Tl-128 Post Accident Technical Considerations (TSC)P. CECC-EPIP-9 Emergency Environmental Radiological Monitoring Procedure O. WBN FSARR. Chemistry Manual, Chapter 13 (PASS)S. ICS Use/s Manual WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 10 of 743.0INSTRUCTIONS General3.1A. Concept of Operations

1. The TSC is an area within the plant near the control room dedicated foruse during an emergency.

The TSC will be the focal point of onsite activityduring the event. The TSC will have sufficient staff to provide management control of the site response to the event. Equipment will be available toenable the TSC staff to communicate with onsite and offsite TVAemergency personnel.

2. An area within the TSC will be dedicated for NRC use and will include fivetelephone sets and the NRC FTS 2000 System telephones.
3. The TSC will have the same habitability as the control room.4. Sufficient plant parameter information will be available to the TSC toenable the TSC staff to assess the consequences of an event and assistthe control room personne!

in mitigating the accident.

5. Sufficient information will be transmitted to the CECC to enable the CECCDirector to make protective action recommendations to State authorities.
6. Activation time for the TSC is approximately 90 minutes following declaration of an Alert or higher emergency classification, depending uponthe time of day, weather conditions or immediate availability of personnel.
7. The Site Emergency Director (SED) shall assume responsibility forimplementing this procedure and directing TSC personnel and activities.
8. The SED is responsible for the timely activation of the TSC.NOTEln the event of plant inaccessibility, all references to the TSC (or OSC) are intended torefer to the alternate location selected for staffing, such as the Alternate Facility in the PSOBuilding.

The TSC will provide the following functions:

1. Provide plant management and technical support to plant Operations personnel during emergency conditions.
2. Perform CECC functions for the Alert Emergency class, the Site AreaEmergency class, and General Emergency class untilthe CECC isfunctional.

B.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Activation and Operation of the I EPIP-GPaqe 11 of 743.1 General (continued)

3. Help the reactor operators determine the plant safety status.4. Relieve the reactor operators of peripheral duties and communications notdirectly related to reactor system manipulations.
5. Prevent congestion in the control room.6. Provide assistance to the operators by technical personnelwho havecomprehensive plant data at their disposal.
7. Provide a coordinated emergency response by both technical andmanagement personnel.
8. Provide reliable communications between onsite and offsite emergency response personnel.
9. Provide a focal point for development of recommendations for offsiteactions.10. Provide relevant plant data to the NRC for its analysis of abnormal plantoperating conditions.

C. lf the TSC becomes uninhabitable, the SED will relocate the TSC to analternate location based on RP/OPERATIONS advice.D. Log Keeping1. lndividual logs and facility logs are legal records of activities that occurredduring an emergency.

lt is vital that they are as complete as possible.

WebEOC electronic logs can be accessed on the EP web site and should beused when applicable.

2. Logs should include such information as:a. Times of major events and subsequent actions taken (such as,change in emergency classifications, fission product barrier status,discovery of an unplanned radiological release).
b. Times and content of important communications with other membersof the ERO that are related to major events (such as, decisions madeduring turnover or routine briefings and subsequent actions taken).c. Specific actions taken to mitigate equipment
failures, contain chemicalor radiological spills or fires, and so forth.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 12 of 743.1 General (continued)

d. Specific references to Emergency Radiation Work Permits,clearances, procedure deviations authorized emergency radiation exposures authorized, and so forth.3. Corrections to paper logs shal! be made by drawing a single line throughand initialing and dating the incorrect entry.4. Preparation of paper Logs (Appendix X)a. lnitiate the last sheet of the applicable checklists as follows:(1) DArE(2) PAGE OF: Enter "1" on the first page and sequential numbers onthe following pages as they are used.b. Enter chronologically those events that are pertinent to the particular individual or organizations:

(1) TIME: Record the time (using the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> clock) that a messageor information was received or action was taken.(2) COMMENTS:

Briefly record the incident,

message, or orderreceived or transmitted.

lndicate the time of the incident andactions taken.c. Upon relief from the position or termination of the emergency, complete the log as follows:(1) PAGE OF: Enter the total number of pages used at the top ofeach page (that is, Page I of 12, Page 2 of 12, and so forth).(2) NAME AND SIGNATURE:

Check the log for completeness, thenin the Comments Section of the last page used in the log, printand sign your name.d. The person relieving the position will initiate and maintain a new logand review any previously prepared logs to allow for continuity of theposition.

e. Upon termination of the emergency or exercise/drill, provide allcompleted logs to the EP Manager.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 13 of 743.2 Initiating Conditions A. The TSC will be activated and Operated during the following conditions

1. Upon declaration of an Alert, Site Area Emergency or General Emergency classification.
2. At the discretion of the Shift Manager (SM)/Site Emergency Director (SED).B. The Shift Manager will initiate activation of the TSC by announcing theemergency condition using one or more of the following methods.1. Plant Public Address (PA) announcement.
2. TEENS or Emergency Paging System (EPS) activation.

NOTEThe Radiological Emergency Response Organization Call List is managed in accordance with the TVA Fitness For Duty Program.3. Utilizing the Radiological Emergency Response Organization Call List andAppendix V of this procedure.

3.3 Activation of the TSGA. Target activation time for the TSC is approximately 90 minutes.

Once notified, Emergency Responders are expected to report to the TSC without delay.B. The SED will declare the TSC activated once responders for the requiredminimum staffing positions are identified as present in the TSC and shall informthe Shift Manager of the final transfer of responsibilities.

C. Once the TSC is activated a plant-wide brief will be given announcing thefacility activation, transfer of SED responsibilities from the SM to the TSC andupdating personnel on the status of the emergency.

D. Positions that are in communication with the CECC will contact their CECCcounterparts as soon as practical.

TSC personnel should not let contacting theCECC delay activation of the TSC.E. Upon arrival in the TSC, personnel will perform the following

1. Sign in on the roster and the TSC Staffing chart.

WBN I Activation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 14 of 743.3Activation of the TSC (continued)

2. Refer to their appropriate position notebook and appendix to this procedure and perform the activities listed in the appropriate lnitial TSC Activation Checklist (appendices D-R). lf relieving a position in the TSC that ispreviously activated and staffed, completion of the activation checklist isnot required.

Receive turnover and log turnover in accordance with thisprocedure.

3. Turn on and perform function checks of equipment they will be using.4. Report readiness status to the EP Manager when activation checklist iscomplete.

NOTEAll TSC responders shall have unescorted protected area access and shall comply withfitness-for-duty policies while on-call.TSC Staffing Requirements (See Appendix A pag e 2 af 2)1. Required minimum staffing positions:

a. Site Emergency Directorb. Operations Managerc. Technical Assessment Manager (TAM)d. RP Managere. Maintenance Managerf. Chemistry ManagerF.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 15 of 743.3 Activation of the TSG (continued)

2. Additional positions for FULL STAFFING:
a. Ops Communicator
b. CR Communicator
c. Board writer (status)d. Board writer (teams)e. Asst. Chem Mgr.f. Asst. RP Mgr.g. TAT Leaderh. TAT Team (ElecUl & C, Mech/Civil, Thermal Hydraulics)
i. Security Mgr.j. NRC Coordinator
k. Log keeperl. EP Mgr.3. Other plant staff the SED determines to be necessary to support TSCfunctions will be called:a. Site Vice President
b. Media Relations Specialist
c. Westinghouse Representative
d. Clerical Staffe. Others, as needed4. The SED or Operations Manager may designate individuals to fill a positionbased on capabilities, training or team needs.5. Appendix W wil! be used to document who fills which position.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 16 of 743.4Operation SED Priorities and Assignments

1. The SED will periodically review the plant conditions and update thepriorities for mitigating the plant emergency.
2. These priorities will be communicated to the ERO during periodic briefings and on the SED Priorities Status Board.3. The SED may assign tasks to functional areas in the TSC. These taskswill be tracked by the TSC Logkeeper and the TSC organization the task isassigned to using logs and status boards as appropriate.

Briefings

1. lnitial Facility BriefingAn initial briefing should be provided to the facility staff as soon aspossible.
2. Periodic Facility Briefings
a. lntra-facility briefings should be held at least once per hour using thePlant PA or the TSC/OSC PA system.b. The SED, if available, will initiate the briefings.
c. lf the SED is not available, then the EP manager or the Operations Manager will initiate the briefings.
d. Briefings will use Appendix B, Facility Briefing Guide, as a guide.3. lmpromptu Facility UpdateAnyone in the TSC that comes into possession of important information should conduct a facility update by first gaining everyone's attention andthen making an announcement.

C. Requesting Tasks/Actions from other Facilities (OSC, Control Room or CECC)1. Appendix C, Action Request Form, will be used to request tasks beperformed by another facility.

A.B.

WBN I Activation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 17 of 743.4 Operation (continued)

2. The person initiating the request will check, as appropriate, this is a driil orthis is an actual emergency.

lf the request is from the Main Control Room, then the Operations Communicator will initiate the request.3. The initiator will fill out their name, the date and time, and the nature of therequest.4. The initiator will give the form to the TAM or Operations Manager forreview.5. The TAM or Ops Manager will decide if the request is for a RapidResponse Team.6. The form will be approved or rejected by the SED or designee, who willrecord this in the disposition section.7. The form will be provided to the TSC Logkeeper, who will review the formfor completeness and assign a tracking number to the request (RequestNumber).8. The Logkeeper will give the form to the appropriate team member fordisposition.

9. lf the request is an OSC task, the Maintenance Manager will call the OSCBoard Writer to discuss.10. The form will be faxed to the appropriate facility.
11. The completed forms will be collected by the Maintenance Manager.D. Types of teams dispatched from the OSC1. TeamAa. Team A will consist of an electrician and an Assistant Unit Operator(AUO) that will be dispatched to the Main Control Room to assist withplant shutdown issues. They will be tracked on the teams statusboard and operate under the control of the Main Control Room. TeamA should be considered a Rapid Response Team.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 18 of 743.4Operation (continued)

b. The primary responsibilities of Team A are to respond to instructions that require operations within the shutdown board rooms, (thoseelectrical board rooms located on Auxiliary
Building, elevations 757'and772');

and any tasks that would be in the Control Building proper.This allows the MCR to perform necessary actions in a timely mannerthat is required for unit shutdown.

Team "A" should not be sentanywhere else for additional tasks, i.e., Reactor Building, TurbineBuilding, etc. The Shift Manager or his designee would haveresponsibility for these individuals accountability and would notify theTSC/OSC of their locations and all actions taken by this team, asrequired.

2. Rapid Response TeamA Rapid Response Team may be assembled and dispatched with aminimal briefing in order to perform time critical operator
actions, evolutions or assessments of plant conditions.

A Rapid Response Team may includean RP Technician to provide job coverage in lieu of a detailed RP brief.Examples of rapid response actions may include the following:

a. opening reactor trip breakers following an Anticipated Transient Without Scram (ATWS)b. medical emergency
c. fire/appendix R fired. providing system alignments for core coolinge. establishing water inventory for core coolingf. mitigating LOCAsg. mitigatingradiological releasesh. restoring vital/shutdown power suppliesi. performing radiological surveillances for dose assessment
j. determining radiological release pathwaysk. realigning steam supply to TDAFW pumpL closing MSIVs or PORVs to prevent release from tube rupturem. SED/TSC discretion to restore control of the plant WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 19 of 743.4Operation (continued)

The Designation of an OSC team as a "Rapid Response Team" will berecommended by the TSC staff and authorized by the SED or designee.

Refer to Appendix C.3. Radiological Survey Team4. Maintenance Team5. Search and Rescue Team6. Operations Team7. Other types of teams may be dispatched at the request of the TSC.E. Communications

1. The following dedicated NRC Telephone lines are located in the TSCa. Emergency Notification System (ENS)b. Health Physics Network (HPN)c. Reactor Safety Counterpart Link (RSCL)d. Protective Measures Counterpart Link (PMCL)2.3.e. Management Counterpart Link (MCL)A fixed satellite telephone is located in thetelephone operation is lost.Portable satellite telephones are located innormal telephone operation is lost.Several telephone conference bridges arecommunications with the control room andTSC in the event that normalthe TSC in the event thatavailable to provide forother facilities.

4.F.Facility Habitability

1. Radiation Protection will conduct periodic radiologica!

habitability surveysto ensure the continued safety of TSC occupants.

2. Unsatisfactory habitability surveys may indicate a need to suspend eating,drinking and smoking in affected plant areas or move the TSC to analternate location based on RP/Operations advice.Severe Accident Management G.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 20 of 743.4Operation (continued) ln order to assume Severe Accident Management responsibilities, the TSCmust have:One SAMG Decision MakerThree SAh/G Evaluators 3.5Long-Term Operation A. Long-term operation will be put into effect during emergencies which areprojected to exist for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.B. The SED will notify the Central Emergency Control Center (CECC) of thedecision to begin long{erm operation.

C. Meals and arrangements for sleeping facilities will be made at the request of theSED. These arrangements may be made by the CECC.D. Additional personnel will be called in at the request of the SED to providecoverage or to ensure 12-hour or shorter shifts in the TSC. The SED willcoordinate these call-ins with Nuclear Security to facilitate site access.E. The SED, through the OSC Manager, will establish 12-hour (or shorter) shiftsfor craft personnel onsite and call in additional personnel as necessary.

Normal Work Process Deviation When a Site Area Emergency or General Emergency has been declared, deviations from normal processes may be authorized by the Site Emergency

Director, or designee, in order to take action to restore core cooling, mitigate anoff-site release in progress, or maintain spent fuel pool cooling.

Evaluation ofdeviations from the normal established processes should be considered prior todispatch of work.Attachment 5 of NPG-SPP-18.3, SED Procedure Deviation Checklist, providesa mechanism to evaluate and document such deviations.

3.7Termination and Deactivation REFER TO EPIP-16, "Termination of the Emergency and Recovery,"

foractivities associated with terminating emergencies, TSC deactivation, and post-accident recovery.

All equipment,

supplies, and procedures will be replenished in the TSCfollowing a drill, exercise or emergency by applicable groups as assigned inEPIP-12,1.2.3.6A.B.A.B.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 21 of 744.04.14.2RECORDSCl,A RecordsThe following records are QA records when completed during actual radiological emergencies.

Appendix D: Site Emergency DirectorAppendix W: WBN TSC Sign in RosterNon-QA Recordst1ll2lEmergency RecordsThe records generated due to declaration of an emergency classification areconsidered Lifetime Retention records.

These records shall be forwarded tothe WBN EP Manager.

The records necessary to demonstrate performance are then submitted to the Corporate EP Manager for storage.Drill and Exercise RecordsThe records deemed necessary to demonstrate performance of key actionsduring drills are considered Non-QA records.

These records shall beforwarded to the WBN EP Manager.

The WBN EP Manager shall retainrecords necessary to demonstrate eight-year plan requirements for eightyears. The WBN EP Manager shall retain other records in this category forthree years.

WBN I Activation and Operation of the IEPIP-GUnit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 22 of 74(t:!:Tll, TSC Facility Layout Diagram755.0 - CI6CHEM.MGRASST.CHEM.MGRi***-**':

I I *_..-;llELEPI"{ONE 755.0 - C17TECHNICUPPORT CE755.0 - C1TInffiffi WBN I Activation and Operation of the IEPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 23 of 74Appendix A(Page 2 of 2lTechnical Support Center (TSC)WBN EMERGENCY RESPONSE ORGANIZATION Westinghouse Representative o$cContacts:

Htrain Control RoomContaets:

$ite VPSite Emergency Director

(#)Emergency P reparedness ManagerTSC ClerksTSC Logkeeper fechnical Assessment Manager (#)Operations Manager {#}Nucfear SecurityManagerMaintenance Manager (#)Chernistry Manager (#)Operatlons Cornrnunicator Technical Assessment Teamfr$cChemistry BrieferO$C RPSupervisor oscOperations BrieferoscNuclearSecurityAdvisorO$C h4anagerShift Manager andControl Room SkffControl RoomCommunicator

(#) denotes 90 minute minimum staffing position(s)

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 24 of 74Appendix B(Page 1 ot 2lFacility Briefing GuideOSC, (if applicable, say "This is a drill, this is a drill") -, Site Emergency DirectorThe current emergency classification is:Attention in the TSC andThis istrEItrE]Levels (EALs) in effect are:Notification of Unusual Event (NOUE)AlertSite Area Emergency (SAE)General Emergency (GE)The Emergency ActionBrief Event

Description:

The upgrade criteria is:The affected unit(s):

tr Unit 1tr Unit2tr Units 1 and 2The status of the Fission Product Barriers:

SED Priorities:

1.Unit IUnit 2Bairier,lntact,iPotential LostlntaetPotential LostFuel CladRCSContainment 2.3.4.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 25 of 74Appendix B(Page 2 ot 2)Unit Status (if delegated to the Ops Manager, announce the statement below)"The Ops Manager will now provide plant status" - (plant parameters and unit status,emergency procedures in effect, key equipment out of service, etc.):Unit 1Unat 2Radiological Status (if delegated to the RP Manager, announce the statement below)"The RP Manager will now provide radiological status" - (airborne areas, onsite and offsitedose rates, wind direction, ongoing releases, etc.):Onsite and Offsite Protective Actions (assembly and accountability status, personnel early releases or evacuations, PARs, etc.):Security Issues:Major activities ongoing in the field:End of Brief (This is a drill - if applicable)

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 26 of 74Appendix C(Page 1 of 1)Action Request Formtr This is a Drill tr This is an ActualEmergency Requested by: Request No.(Name/Title)

(Date/Time)

Request:Which SED Priority doesthis task support?Rapid Response Team:tr YestrNoReviewed By TAM/OpsMgr:(lnit)(Date/Time)

Disposition:

tr Acceptance of Request:

El Assigned to OSC as taskE Assigned to Main Control Roomtr Assigned to CECC PATtr Other:u Rejection of RequesUReason:

Approved By SED(or designee):

(ln it)(Date/Time)

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSG) lRev. 0049Paqe 27 of 74Appendix D(Page 1 of 8)SITE EMERGENCY DIRECTORLnitial Activation of the Technical Support Center Checklist Date:lnits/Time l_ OBTAIN turnover briefing from SM/SED. Pages 6, 7 and 8 of Appendix D,SED Turnover Data Sheet may be used as a guide.I REPORT to the TSCl_ SIGN lN on the staffing chart and PUT ON position badge.l_ ESTABLISH log of communications/events.

l_ SIGN lN on the TSC Sign ln Roster.l_ CHECK the status of emergency actions already in effect such asemergency notifications (NRC, State, etc.) and accountability or siteevacuation.

l_ REQUEST checklist completion status for required positions:

(Check list completion is not required for facility activation) tr Site Emergency Directortr Operations Managertr TAMtr RP Managertr Chemistry Managertr Maintenance Managerl_ CONFIRM TSC staffed and Operational.

I Declare the TSC activated at(time)l_ ASSUME role of SED from SM (confirmatory phone call to the SM).INFORM the CECC Director (if the CECC is activated) and OSC Manager that theTSC is operational and that you have assumed responsibilities of the SED andprovide initial briefi ng.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 28 of 74Appendix D(Page 2 ot 8lSITE EMERGENCY DIRECTORMAKE a general plant-wide announcement regarding plant condition similar to thefollowing:

ACCESS the Public Address System by dialing 487.COVER the following points as a minimum:a. .ATTENTION ALL SITE PERSONNEL.

ATTENTION ALL SITEPERSONNEL.'

tr "This is a drill, this is a drill." OREI "This is a real emergency.

This is a real emergency."

This is(name)Site Emergency Director.

TheTSC was activated athours. Due toin unit(s)We have declared(NOUE, Alert, Site Area Emerqencv, General Emerqencv).

Weare implementing plant protective actions including:

(Evacuations, assemblyand accountability, etc.)e.Unit 1 Status isUnit 2 Status isRadiological releasepoints:Our plan of action at this time istoThe OSC (is, is not) activated.

Allemergency response teams will bedispatched from the OSC.Any emergency response personnel, who are fatigued or feel they cannotperform their assigned duties, should notify the EP Manager in the TSC or theOSC Manager in the OSC.tr "This is a drill, this is a drill." ORtr "This is a real emergency.

This is a real emergency."

1.2.b.c.d.g.h.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 29 of 74Appendix D(Page 3 of 8)SITE EMERGENCY DIRECTOROoerational Resoonsi bilitieso Determines the emergency classification and periodically reevaluates theclassification.

Changes to the classification will be reported to the CECCDirector and the NRC. THE CLASSIFICATION OF THE EVENT CANNOT BEDELEGATED.

(See EPIP-I). Approves or authorizes emergency doses that may exceed applicable NRCdose limits. THIS RESPONSIBILITY CANNOT BE DELEGATED.

(SeeEPtP-15)o Prior to the CECC being staffed makes recommendations for protective actionsto State and Local agencies.

THIS RESPONSIBILITY CANNOT BEDELEGATED EXCEPT TO THE CECC DIRECTOR.

Refers to EPIP-S,Protective Action Recommendation Guidance Flowchart, as a guide.o Directs onsite emergency accident mitigation activities and briefs the TSC/OSCstaff on the current plant situation.

. Approves Action Requests and authorizes the designation of OSC teams as"Rapid Response Teams".o Ensures that general plant population is periodically briefed on the emergency conditions.

o Periodically reviews priority of field teams with the OSC Manager.

(See EPIP-7)o Directs activities of onsite emergency organizations.

. Consults with the CECC Director and Site VP on important decisions.

Use theCECC Ring-down Line to the CECC Director.

. Approves normalwork process deviations in accordance with NPG-SPP-18.3, attachment

5.

WBN I Activation and Operation of the IEPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 30 of 74Appendix D(Page 4 of 8)SITE EMERGENCY DIRECTOROoerational Resoonsibilities (continued)

Coordinates emergency actions with onsite NRC.lnitiates onsite protective actions.

(See EPIP-8)Verifies the administration of Potassium lodine (Kl)to TVA personnel based onRP Manage/s advice/direction.

(See EPIP-14)Establishes a RP checkpoint for site evacuation if conditions warrant.

(SeeEPIP-8 and EPIP-14)lnitiates long-term 24 Hourlday operation.

When Severe Accident Management Guidelines are entered, assumes DecisionMaker responsibility (lf qualified).

This responsibility can be delegated toanother qualified Decision Maker.Coordinates with lncident Commander (lf assigned) and/or any offsiteemergency responders that have responded to the site.

WBN I Activation and Operation of the I EPIP6Unit 0 l Technical Support Center (TSG) lRev. 0049Paqe 31 of 74Appendix D(Page 5 of 8)SITE EMERGENCY DIRECTOROoerational Resoonsibilities (continued) o Evaluates conditions and determines if emergency procedures should beimplemented.

a. Emergency Environmental CECC-EPIP-9 Radiological Monitoring Procedures
b. Medical Emergency Response EPIP-10c. Security Threat Physical Security Pland. PersonnelAccountability and EPIP-8Evacuation
e. lnitial Dose Assessment for EPIP-13Radiological Emergencies DEACTIVATION RESPONSI BI LITI ESReference EPIP-1 6.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 32 of 74Appendix D(Page 6 of 8)SITE EMERGENCY DIRECTORSED Turnovel, Q3tashee!

The affected unit:El Units 1 and 2UE tr ALERT tr SAE trTime/Date Declared IGENEvent

Description:

1.tr Unit 1tr Unit2Cu rrent Emergency Classification

EAL:2.3.4.Equipment Problems:

5.Status of the unaffected unit:6.Site Radiological Problems:

7.Radiological Release:

Yes trRelease Point:Release Type:FilteredMonitored Controlled GAP tr Fuel Damage trUnfiltered trUnmonitored trUncontrolled trNotrRCS trtrtrtrFue! Melt trProjected Duration(hrs.lmin.)

WBN I Activation and Operation of the I EPIP6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 33 of 74Appendix D(Page 7 of 8)SITE EMERGENCY DIRECTORSED Turnover Datasheej Jgontinued)

Wind Speedmph Wind Direction FROMProjected Whole Body DoseProjected Thyroid Dosemrem = milesmrem = miles8. Protective Action Recommendations to Offsite Officials (use PAR Flowchart in EPIP-5):Nonetr 1tr 2i 3tr 4E str 6tr9. Onsite Protective Actions Taken:tr SITE EVACUATION tr ACCOUNTABILITY tr SPECIF]C AREA EVACUATIONS

10. Field Monitoring Vans Activated:

Yes tr No El11. SM/SED Notifications Made:Time State notified:

Time NRC Notified:

12. lnjured or contaminated persons status:Transported to:tr Rhea County Medical Centertl Athens Regional Medical Centertr Other WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 34 of 74Appendix D(Page 8 of 8)SITE EMERGENCY DIRECTORS ED Tu rnover Datasheet,

(,cgn,tinued

)13.Status of personnel in the field:NAMESED Responsibility Transferred

tr Physically in the TSCtr TSC has minimum staffingtr Call SM to see if conditions have changed.tr Declares over the telephone, "The TSC is staffed and activated.

This isand I am now assuming the role of SiteEmergency Director at(time)."From:toSMTSC/SEDDate:Time:LOCATIOI.\.

14.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 35 of 74Appendix E(Page 1 ot 2lSITE VICE PRESIDENT lnitial Activation of the Technical Support Qgntg.,l,,9Lecklist Date:lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH a log of communications/events.

I ESTABLISH contact with the CECC Director.

l_ CHECK the status of emergency actions already in progress.

(Such asaccountability, site evacuation or press inquiries.)

l_ PROVIDE this completed checklist to the SED or EP Manager.

WBNActivation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 36 of 74Appendix E(Page 2 ot 2lSITE VICE PRESIDENT Operational Resoonsibilities Listo Provides TVA policy direction to the Site Emergency director (SED).o Provides support to other emergency centers as necessary.

. Serves as the primary site representative to function as a TVA Spokesperson inthe Local News Center (LNC) at the WBN Training Center (if activated).

o Directs the site resources to support the SED in the accident mitigation activities.

o Provides direct interface on overall site response activities with NRC, FEMA,other Federal organizations, the CECC Director, and onsite media.o Provides interfaces/briefings (as needed) at offsite locations on the overall siteresponse activities with Federal, State and Local agencies.

. Update Fission Product Barrier Matrix status in WebEOC as conditions change.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 37 of 74Appendix F(Page 1 of 2)OPERATIONS MANAGERlnitial Activation of The Technical Support Center Checklist Date:Inits/Tirne l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l- SIGN IN on the TSC Sign in Roster.l- NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC Operations Briefer and the CRCommunicator in the MCR. MCR bridge line is 41 01 .l_ CHECK the status of onsite emergency actions already in effect such asAccountability or Evacuations.

l_ REPORT the status of in plant field activities (operations, repair, radiological, etc.) received from the OSC Operations

Briefer, Maintenance Manager orSM.l_ VERIFY that notification of the NRC has been accomplished and informSED and NRC Coordinator.

l_ DESIGNATES a person knowledgeable of the event to establish andmaintain communications with the NRC via the phone as needed. This willbe the NRC Coordinator when present.

NOTIFY the SM that responsibility for NRC contact has been transferred to the TSC.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 38 of 74Appendix F(Page 2 ot 2lOPERATIONS MANAGEROoerational Responsibilities o Directs operational activities.

o lnforms the SED of plant status and operational problems.

o Recommends solutions and mitigating action for operational problems.

. Designates a SRO for the Technical Assessment Team, as needed.o Provides advice regarding Technical Specifications, system response, safetylimits, etc.o Periodically reviews the emergency status with the control room. Reviewstrended parameters, time history information, and status boards with the ControlRoom staff.o Ensures that the Control Room is aware of TSC accident assessments andOSC repair and response activities and priorities.

o Reviews Action Requests (Appendix C) and recommends if an OSC teamshould be designated as a "Rapid Response Team"o Ensures that adequate Operations staffing is currently in the Main ControlRoom and that oncoming control room staffing requirements are being met forthe following positions (Appendix V, Emergency Responder Notification Form,may be used to document):

tr Shift Managertr 2 Unit Supervisors tr Shift TechnicalAdvisor tr 4 Reactor Operators tr 8 AUOs (minimum tech specs/Appendix R staffing.

May be assignedto the OSC)

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 39 of 74Appendix G(Page 1 of 2lTEGHNICAL ASSESSMENT MANAGERlnitial Activation of The fechni.qa,LQ.ttpport Center Checklist Date:lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ CHECK the status of emergency actions already in effect such asAccountability or Site Evacuation or Response Teams in the Plant.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 40 of 74Appendix G(Page 2 ot 2lTECHNICAL ASSESSMENT MANAGEROoerational Resoonsibil ities. Designates Technical Assessment Team Leader (if necessary).

o Directs activities of the Technical Assessment Team.o Reviews Action Requests (Appendix C) and recommends if an OSC teamshould be designated as a "Rapid Response Team"o Directs onsite effluent assessment.

. Projects future plant status based on present plant conditions.

o Keeps assessment team informed of plant status.o Provides information, evaluations, and projections to the SED.o Coordinates assessment activities with the CECC Plant Assessment team.o Establishes and maintains a status of significant plant problems.

. lf ICS is not operable, ensures information on Appendices S and T are sent tothe CECC to be used in the predictive release rate model.o Coordinate with the Chemistry Manager to initiate a Post-Accident Sample(PASS) as needed for assessment of the containment atmosphere and/or fueldamage.o Provides for trending of significant parameters.

. Coordinate support activities performed by the TAT Team in association withWOG-99-064 Emergency Response Guidelines (ERGs) Background lnformation.

. Assumes SAMG responsibilities when directed by the SED. The TSC must befunctional and 3 SAMG Evaluators must be monitoring the "TSC Diagnostic Flow Chart' (DFC) to assume SAMG responsibilities.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 41 of 74Appendix H(Page 1 ot 2lMAINTENANCE MANAGERlnitial Activation,gf.."The fqchnic,al Support Center Checklist Date:Inits/Time t_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC Manager or Asst. OSC Manager.The 4104 telephone bridge is available for coordinating communications between the TSC Maintenance

Manager, OSC Assistant
Manager, OSCBoard Writer and the OSC Teams Coordinator.

l_ CHECK the status of emergency actions already in effect such asAccountability, Site Evacuation and Team A status.t_ CHECK status of deployed emergency response teams (Operations, Maintenance, Medical Emergency Response Teams, etc.)l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 42 of 74Appendix H(Page 2 ot 2lMAINTENANCE MANAGEROoerational Resoonsibilities o Coordinates emergency response team assignment activities with the SED andthe OSC.o Maintains an understanding of deployed OSC teams' purpose and status.o Collects completed Action Requests (Appendix C)o Assists the SED and the OSC Manager in determining the relative priorities ofmaintenance/repair activities.

. Communicates the need to establish new OSC teams with the OSC.o Ensures that damage assessment and repair priorities are coordinated with theosc.o Maintains the Emergency Response Teams tracking board in the TSC.A. The preferred method for tracking the status of OSC teams is using theTeams Status Board in Web EOC.

WBNActivation and Operation of the I EPIP-GUnit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 43 of 74Appendix I(Page 1 ot 2lOPERATIONS GOM MU N ICATORlniti,A,l.Ac:[vation of The Technical Support Cenler Checklist Date:!nits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC Sign in Roster.l_ ESTABLISH communication via telephone with the Control RoomCommunicator by dialing 4101 .l_ RECEM update on plant status from Control Room Communicator.

l_ CHECK operability of the lntegrated Computer System (lCS) system.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 44 of 74Appendix I(Page 2 of 2lOPERATIONS COMMUNICATOR Ooerational Resoonsibilities o Provides operationa!

knowledge as needed to status evaluations of plantsystems.. Provides advice to the Operations Manager regarding Technical Specifications, Systems Response, and safety limits.o Assist Operations Manager in development of operations recommendations toproblems.

o Monitors the Control Room Communicator Party line.o Operates TSC ICS to obtain plant status and parameters.

o Provides information from the Control Room to the Technical Support Centerpersonnel.

o lnitiates Action Requests (Appendix C) for the Control Room. Completes portions of plant parameter data sheets (Appendices S and T) asneeded.o Monitors plant status boards.. Obtains supplemental data as needed by the TSC, OSC, or CECC.o Makes inquiries to the Control Room Communicator to obtain specificinformation as necessary.

o Update Fission Product Barrier Matrix status in WebEOC WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 45 of 74Appendix J(Page 1 ot 2lNUGLEAR SEGURITY MANAGERlnitial Activation of The Technical Support Cg.nter QhecKlist Date:lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the Central Alarm Station (CAS) and theSecondary Alarm Station (SAS).l_ CHECK the status of emergency actions already in effect such asAccountability, Site Evacuation or site being closed to visitors.

t_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 46 of 74Appendix J(Page 2 ot 2lNUCLEAR SECURITY MANAGEROoerational Resoonsibilities o Directs activities of Nuclear Security personnel and mobilizes additional personnel as needed.. Reports on site accountability/evacuation as defined in EPIP-8.o Assists in establishing search teams, as required.

(EPIP-8)o Provides status updates to Nuclear Security personnel.

o Reports status of Security related events to the SED.o Remain cognizant of Plant Radiological Conditions and report location(s)of Security Personnel/Patrols (as needed) to the RP Manager and the SED.o Controls access to the site and the Main Control Room.. Advises incoming emergency response personnel at the gate house of anyradiological,

security, or environmental hazards in route to the TSC/OSC.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 47 of 74Appendix K(Page 1 of 3)RP MANAGERlnitial Activation of The Technical Support 9gntgr,Qhqg,Klist Date:lnits/Time l_ SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC RP Superuisor and the radiological monitoring vans (if dispatched).

l_ EVALUATE radiological habitability in the TSC and suspend eating anddrinking if necessary.

l_ CHECK the status of offsite/onsite radiological conditions and emergency actions already in effect such as Accountability or Site Evacuation.

l_ VERIFY that Security has distributed emergency dosimetry packages to alloffsite responders (i.e., EMS, Fire, or LLEA) and to any TVA Securitypersonnel in the OCA and Protected Area whose duties do not allowdosimetry issue at the RCA.l_ PROVIDE this completed checklist to the SED or EP Manager, WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 48 of 74Appendix K(Page 2 ot 3lRP MANAGEROoerational Resoonsibilities Directs onsite RP activities.

IF necessary AND the CECC is not staffed, utilize EPIP-13 to perform doseassessment.

REPORT results to the SED.Makes recommendations for protective actions for onsite personnel to the SEDand for personnel entry into radiological hazardous environments.

Consults with the CECC Radiological Assessment Team to determine potential plume path and location prior to evacuating personnel from the site.Obtains MET data as needed by using lCS, PEDS or the Environmental DisplaySystem (through Web EOC).Directs the issuance of Kl by following EPIP-14 guidelines to onsite personnel after notifying the SED.Remains cognizant of assessments of in-plant and onsite radiological conditions from the OSC RP Supervisor.

Directs the radiologica!

monitoring vans until the CECC assumes control (CECCEPrP-9).Provides periodic status reports to the SED on radiological conditions.

lnitiates Action Requests (Appendix C) when requesting RP teams bedispatched from the OSCKeeps the CECC-Radiological Assessment Coordinator (RAC) informed of on-site radiological conditions and coordinates supplemental RP support.Coordinates assessment of radiological conditions offsite with CECCRadiological Assessment Manager (RAM).Maintains status maps of offsite radiological conditions and in-plant Radiological Conditions status board (ensuring times are posted next to radiological data).Provide RP surveillance through the OSC to MET station personnel, if requiredby environmental releases.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 49 of 74Appendix K(Page 3 of 3)RP MANAGEROoerational Resoonsibilities (continued)

. Designates a qualified/knowledgeable person to provide in-plant radiological data to the NRC via the Health Physics Network (HPN) upon request.o Ensures outlying emergency responders (i.e. line crews, warehouse) havedosimetry and are being protected during the emergency.

o Provide radiological data to the OSC that must be obtained from the MainControl Room.o Maintain control of personnel sent out of the TSC that are not part of a teamsent out by the OSC, when radiological conditions are a concern.. Evaluate the need for suspending eating and drinking in potential radiological affected areas of the site OR site wide until radiological conditions can beassessed.

. lf eating and drinking needs to be suspended in any areas, initiate a publicannouncement to communicate areas where eating and drinking aresuspended.

o A similar announcement to the following should be utilized once theassessment is completed:

"Attention, due to abnormal radiological conditions eating and drinking havebeen suspended (SITE WIDE or lN THEFOLLOWTNG AREAS)List Areas:No eating or drinking(SITE WIDE or THESE AREAS)until Radiation Protection removes this suspension".

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 50 of 74Appendix L(Page 1 ot 2lCHEMISTRY MANAGERInitlal Activation of The Technical Support Center Checklist Date:lnits/Time SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.SIGN !N on the TSC sign in roster.NOTIFY SED of anival.ESTABLISH log of communications/events.

ESTABLISH contact with the OSC Chemistry Briefer.CHECK the status of emergency actions already in effect such as chemistry sampling.

PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 51 of 74Appendix L(Page 2 ot 2lCHEMISTRY MANAGEROoerational Resoonsibilities

. Coordinates information and the assessment of radioactive effluents with theCECC.. Directs and remains cognizant of OSC Chemistry Briefer's Post-Accident Sampling Activities.

NOTEFrom the time a decision is made to take a PASS sample, the results must be obtained inthree (3) hours. A PASS should not (normally) be requested until post-accident conditions are stable enough to provide for useful evaluation results.o Determines the impact of the incident on radwaste and various effluenttreatment systems.o Assist the RP Manager in Dose Assessment Calculations using EPIP-13, lnitialDose Assessment for Radiological Emergencies.

o Maintains the release rate portion on the Chemistry Status Board.o lnitiates an Action Request (Appendix C) when requesting Chemistry teams tobe dispatched from the OSC.. Completes portions of plant parameter data sheets (Appendices S and T) asneeded.o Provides assistance to the SED and Technical Assessment Manager asneeded.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 52 of 74Appendix M(Page 1 ot 2lNRC COORDINATOR lnitial Activation of Ihe Technical Support Center Checklist Date:lnits/Time SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.SIGN lN on the TSC sign in roster.NOTIFY SED and OPS Manager of arrival.RELIEVE the Control Room of responsibility for maintaining contact with theNRC, (ENS).ESTABLISH log of communications/events.

CHECK the status of plant conditions and emergency actions already ineffect such as Accountability or Site Evacuation.

CALL NRC to inform them that you have assumed responsibility for contactfrom the Control Room.PROVIDE this completed checklist to the SED or EP Manager.

WBNActivation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) JRev. 0049Paqe 53 of 74Appendix M(Page 2 ot 2lNRC COORDINATOR Operational Resoonsibilities o Acts as primary liaison with onsite NRC personnel.

o Remains fully cognizant of emergency and plant conditions.

. Updates NRC personnel on plant status (use Appendices S and T as a guidewhen ICS is unavailable).

o Provides information requests from NRC to TSC personnel.

WBN I Activation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSG) lRev. 0049Paqe 54 of 74Appendix N(Page 1 ot 2lCONTROL ROOM COMMUNICATOR lnitial Activation of.fhe Technical Support Center Checklist Date:lnits/Time OBTAIN the control room communicator portable phone headset at the SMdesk.RECEIVE turnover from Control Room staff on plant conditions and relevantactions in progress.

ESTABLISH the Main Control Room bridge line by dialing 4101.ESTABLISH contact with the TSC OPS Communicator and other party linereceivers (OSC-OPS

Briefer, CECC).INFORM TSC this form is complete and PROVIDE this completed checklist to the SED or EP Manager when conditions permit WBN I Activation and Operation of the I EPIP-6Unit 0 I Technical Support Center (TSC) lRev. 0049Paqe 55 of 74Appendix N(Page 2 ot 2lCONTROL ROOM COMMUNICATOR Ooerational Resoonsibilities o Serves as the control room - operations communications interface.

o Provides key plant parameters and critical safety function conditions and otherinformation as requested over the operations "pafty line" to various positions inthe TSC, OSC, and CECC.o Provides operational knowledge for status evaluation of plant systems.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 56 of 74Appendix O(Page 1 ot 2)EP MANAGERlnitial Activation of The Technical Suoport Center Checklist Date:Inits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ CHECK the status of emergency actions already in effect such asAccountability, Site Evacuation and MERT actions.l_ ENSURE checklists are being completed.

l_ INFORM SED when key staff members are present.l_ ENSURE all essential positions are filled by qualified responders who are fitfor duty and checklists are returned.

l_ CALL TSC Clerks to come to the TSC as necessary.

l_ ENSURE all activation activities are preceding normally.

l-ENSUREoperabiIityofbackupcommunicationS.

l_ ANNOUNCE activation of the TSC and provide SED (name) on the Plant PAand instruct AUOs in the plant to report to the OSC staging area once theyhave completed previous missions assigned by the Main Control Room.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 57 of 74Appendix O(Page 2 of 2lEP MANAGEROoerational Resoonsibil itieso As soon as possible after the CECC is activated, ensure initial conditions aretransmitted to the CECC. This may include equipment status, core status and acopy of the latest RCS chemical analysis.

. Advises the SED regarding the REP, use of EPlPs, emergency equipment useand availability, and coordination with the CECC.. Confirm completion of action steps in EPIPS 2 - 5.. Confirms TSC and OSC are operating properly.

o Monitor fitness for duty (i.e. fatigue) for the response team and makerecommendations to the SED as needed.. Provides assistance to the SED as requested.

o Ensures relief staff are identified for TSC shift turnover. Coordinates food and lodging requirements for the ERO with the CECC.o Assist the SED by making PA announcements to update plant personnel ofemergency status.. Update Fission Product Barrier Matrix status in WebEOCo Changes emergency classification signs as conditions change.Deactiyation Responsibilities Reference EPIP-16.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Genter (TSC) lRev. 0049Paqe 58 of 74Appendix P(Page 1 of 1)TSC LOGKEEPER lnitial A"qlivation of The Technical Suppgrt Center Checklist Date:lnits/Time l- SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.l_ REPORT to the SED and begin a log of his/her activities.

l- RECORD significant information in Web EOC boards such as significant events, priorities, etc.t_ PROVIDE this completed checklist to the SED or EP Manager.Operational Responsibilities o Maintains official logs of the events and SED activities (Web EOC is thepreferred method for maintaining the facility log).o Records assignments made by the SED to functional areas in the TSC. Assigns tracking numbers to allAction Requests (Appendix C)o lnitiates the shift turnover list as directed by the SED.o Establishes video link with the OSC Team Status Board Writer during facilitybriefings.

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 59 of 74Appendix Q(Page 1 ot 2lTSC CLERICAL STAFFlnitial Activation,of The Technical Support Center Chegklis.,l Date:lnits/Time l_ SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.I_ SIGN lN on the TSC sign in roster.l_ DISTRIBUTE manuals and TSC supplies and operate equipment asreq uested.l_ ENSURE that EPIPs are at the appropriate revision level.t_ ASSIST RP Manager in distributing TLDs to TSC personnel if applicable.

t_ DISTRIBUTE Emergency Notification forms and news releases toappropriate personnel within the facility, including the NRC.l_ DISTRIBUTE copies of the Radiological Emergency Notification Directory toappropriate personnel within the facility, including the NRC.Deactivation of the TSCl_ COLLECT all logs, notes, and other materials from each TSC position andPROVIDE them to the EP Manager for documentation and storage.l_ ASSIST in the deactivation of the TSC by returning all equipment, suppliesand manuals to the proper storage cabinets.

l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 60 of 74Appendix Q(Page 2 ot 2lTSC CLERICAL STAFFOoerational Resoonsibilities Assist in the set up of the TSC.Maintains accountability of TSC personnel and staff organization board.ln the event of a Site Wide Evacuation, inform the TSC RP Manager that theclerk position is a non-radiation worker position.

Answers telephones.

Distributes plant parameter data sheets (Appendices S and T), if ICS isunavailable.

Operates facsimile machines.

Faxes andior scans Appendix C forms to the OSC.Uses Emergency Response Call List to obtain staff for unfilled positions orreplacement staff for shift turnover using Appendix V, "Emergency Responder Notification Form". Ensure that the following directions relative to call-in forunscheduled work per the "Fitness For Duty" (NPG-SPP-14.1) are followed:

ASK responder the following questions:

1. "Have you consumed alcohol in the past five hours?"2. "Are you fit for duty?"lf the first question is answered in the affirmative, call the next person on thecall list unless the individual indicates that he/she is fit for duty in which caseyou should refer the determination to a supervisor.

WBN I Activation and Operation of the IEPIP-GUnit 0 l Technical Support Center (TSC) lRev. 0049Paqe 61 of 74Appendix R(Page 1 of 3)TECHNICAL ASSESSMENT TEAMlnitiql Activation of The Technical Support Center Ch,e.qKlist Date:Inits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the Technical Assessment Manager.t_ CHECK the status of emergency actions already in effect such asAccountability or Site Evacuation.

l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-GUnit 0 l Technical Support Center (TSC) lRev. 0049Paqe 62 of 74Appendix R(Page 2 of 3)TECHNICAL ASSESSMENT TEAMOoerational Responsibilities o The TAT Leader may designate a TAT member to be the TAT Board Writer.o Prepares and provides current assessment on plant conditions and providesthis information to the CECC Plant Assessment Team.o Reviews Tl-128, "Post Accident Technical Considerations (TSC)," for additional information which may be applicable to the ongoing events.o Reviews MA-1 , 1- AOI-42.01 and EDMG-2 for additional information which maybe applicable to the ongoing events.. Project future status based on present plant conditions.

o Provide technical support and recommendations to plant operations onmitigating the accident.

o lnitiates Action Requests (Appendix C) to request actions by other facilities o Determines the condition of the reactor and nuclear fuel. (Evaluate use of RCI-104 for determining RCS activity)

. lf ICS is unavailable, prepares accident assessment form (Appendix U) for theTAM and NRC Communicator as needed.o Provides Predictive Release Data Sheet (Appendix T)to the CECC asrequested.

o Performs trending of key plant parameters using lCS.o Assumes SAMG responsibilities, when directed by the TAM. The TSC must befunctional and 3 SAMG Evaluators must be monitoring the "TSC Diagnostic Flow Chart'(DFC) to assume SAMG responsibilities.

. If applicable, verifies that all Aux. Bldg. Secondary Containment Enclosures (ABSCE)doors are closed. (50l-30.06, Auxiliary Building Gas Treatment System, Checklist 3 or Fire Protection)

WBN I Activation and Operation of the IEPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 63 of 74Appendix R(Page 3 of 3)TECHNICAL ASSESSMENT TEAMOoerational Responsibilities (continued) o ldentifies and tracks the status of current ABSCE breaches.

(Contact HVACSystem Engineer for Breaching Log status)o Verifies that all Main Control Room Habitability Zone (MCRHZ) doors areclosed.o ldentifies and tracks the status of current MCRHZ breaches.

WBNUnit 0Activation and Operation of theTechnical Support Genter (TSC)EPIP.6Rev. 0049Paqe 64 of 74Appendix S(Page 1 of 6)Plant Parameter Data SheetsDATE:TIME:UNIT:NOTEUnit status updates can be gained from the ICS computer utilizing the TSC Mimics and thefollowing subgroups:

REP1, REP2, 2PS1, 3MS1, 4S11, or SPDS.Refer to the ICS System User's Guide for additional information.

lf the ICS is inoperable, utilize the sheets of this appendix to trend/track needed data.1. CST LEVEL: (Ll-2-230A)_

(Lt-2-233A)_GAL

2. SG HEAT SINK: E CONDENSER tr ATMOSPHERE
3. AFW PUMPS RUNNING:

E A-A4. SG LEVELS: NR: (1) (2)(Lr-3-3e) wR: (1) (2)(Lr-3-43A)

5. SG PRESSURES:

(1) (2)(Pr-1-24)

RVLIS: DYNAMIC RANGEPZR LEVEL: (LI-68-335A)

(coLD cAL)PZR PRESSURE:

(Pl-68-342A) tr B.B E] TDGrffa (3) (Lr{-%)@ (3) Gr+eBA)(Pt-1-eA)

(3) (@STATIC %tloa-z+nl (3) @@(3) @(4)(4)(4)(Lr-68-320)

%(HOr CAL)(Pr-68-340A)_PSrG (Pr-68-64)_PSrG o/o@ffi1(Pr-127APSlG

%6.7.8.9.10.RCS PRESSURE:

(LOOP 3 HOT LEG)HL TEMP: WR (1) (2)(r-68-1)oF(4)(rrc8-65)

11. CLTEMP: WR (1) @ (2)(4) _"F(Tt-68-83)

WBNUnit 0Activation and Operation of theTechnical Support Genter (TSG)EPIP.6Rev. 0049Paqe 65 of 746:3:i',:};)

Plant Parameter Data SheetsDATE:T!ME:UNIT:12. RCSFLOW:

RCP'SRUNNING:

tr1 Fl2El3 tr4 tr NATURALCIRC

13. ECCS STATUS: U STANDBY tr INJECT U RECIRC tr SPRAY14. RWST LEVEL: (Ll-63-50)_cAL (Ll-63-51)_cAL
15. CNTMT SUMP LEVEL:(Lt-63-180, 181)_%16. FLOWRATE:

(Fl-62-93)_GPM (Fl-63-170) cPMCHARGINGBIT17. CNTMT PRESSURE:

NR (Pl-30-44)

(Pl-30-45)

PSID18. INCORETHERMOCOUPLES:

QUAD 1 (1 of H1 ,28,24,56,55,29,6)

_"FQUAD 2 - (1 of #44,22,58

,21,16,63

,64) _"FQUAD 3 - (1 of #54,12,8,40,4,3,7)

QUAD 4 - (1 of #60 ,9,45,6,46

,42,36)"FoF19. NIS SOURCE RANGE: (N-131 )_CPS (N-132)_CPS

20. SUB COOLING MARGIN OF OFtr-oe-rosl lfloe-r rs121. STATUS TREE INDICATING:

RED trORANGE trREASON:REASON:DATA BY:

WBNUnit 0Activation and Operation of theTechnical Support Center (TSG)EPIP.6Rev. 0049Paqe 66 of 74Appendix S(Page 3 of 6)Plant Parameter Data SheetsDATE:TIME:UNIT:RADIATION MONITORSNOTEUnit Status Update Sheets (For Use When TSC/ICS Computer ls lnoperable)

2. UPPER CNTMT (RE-90-112)

(A) PARTICULATE_CPM tr TSoLATED tr TO UPPER (B) TOTAL GAS _CPMtr TO LOWER (C) IODINE _CPM1. LOWER CNTMT (RE-90-106) tr ISOLATED tr TO LOWER3. SHIELD BLDG VENT(1&2-RE-e0-400)

FLOW CFMtr ISOLATEDFLOW CFM5. CONDENSER EXHAUST (LR)(A) PARTICULATE CPM(B) TOTAL GAS _CPMTOTAL GAS U1_ U2 frCi/cc(B) TOTAL GAS CPM(c) roDrNE cPMCPM FLOW CFM(RE-e0-1 1e)(Fr-2-256) 4.AUxlLlARYBLDGVENT(0-RE-90-101)(A)PARTlcULATE-cPM WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 67 of 74Appendix S(Page 4 of 6)Plant Parameter Data SheetsDATE:TIME:UNIT:NOTEICS radiation monitor(s)

RE identifications may be referenced as RM in the MCR.6. STEAM LINE RAD MONITORS:

RE-90-421 RE-90-422 RE-90-423 RE-90-424 STEAMFLOW (MCR)Fr-1-3A(3B)

Fr- 1-10A(1 0B)Fr-1-21 A(21 B)Fr-1-28A(2BB)

SERVICE BLDG VENTSG BLOWDOWN:

ERCW DISCHARGE:

HEADER A:0-RE-90-133 HEADER B:0-RE 13410. Additional monitors in alarm (trend as needed).DATA BY:7.B.9.SG1SG2SG3SG40-RE 132RE-90-120 mR/hrmR/hrmR/hrmR/hrlbmlhr.Ibm/hr.lbm/hr.Ibm/hr.CPM FLOWCPMCPMCPMCFMCPMRE-90-121 0-RE 1400-RE 141CPMCPM WBNUnit 0Activation and Operation of theTechnical Support Genter (TSG)EPIP-6Rev. 0049Paqe 68 of 746:3:i',:}3)

Plant Parameter Data SheetsDATE:TIME:UNIT:POST-ACCI DENT RADIATION MON ITORSNOTEUnit Status Update (For Use When TSC/ICS Computer ls lnoperable) 1.UPPERCNTMT:(ToPoF#2&#3SG)RE-90-271:-R/hr (TOP OF #1 & #4 SG) RE-90-272:_R/hr 2.LoWERCNTMT:(BETWEEN#2&#3SG)RE.90.273:-R/hr (BETWEEN

  1. 1 & #4 SG) RE-90-274:_Rl/hr
3. COND VAC EXHAUST:

(mid.R/1-RE-90-255)_(HRv1-RE-90-256)_CPM (mid. R/2-RE-90-255)_(

H R/2-RE-e0-256)_CPM

4. Additional monitors in alarm (trend as needed):DATA BY:

WBNActivation and Operation of the I EPIP-6Unit 0Technical Support Center (TSG) lRev. 0049Paqe 69 of 74Appendix S(Page 6 of 6)Plant Parameter Data SheetsRADIATION RELEASESDate:Time:UnitRelease Point:Release Inforrnation:

Release Began at _ and expected to end at _ (for duration of _ hours).Release Potential of _ Ci in volume of _ ft3/galRelease Rates: EI Lowering tr Stable n Rising tr UnknownAirborne ReleasesLiquid ReleasesGross Release Rates (uCi/sec)

Concentration FIowTotal ReleaseNoble GaslsotopeValueUnitsValueUnitsValueUnitslodinesParticulate lsotopic Release Rates (uCi/sec) lsotopeRelease RateMet DataDateTimeSensorElevation (m)Wind Speed (m/sec)Wind Direction (from)Stability LayerStability ClassRemarks/Comments:

Data Collected by:

WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paqe 7A of 74Appendix T(Page 1 of 1)Predictive Release Data SheetDATE:TIME:UNIT:DATA NEEDED FOR CECC TO PERFORM PREDICTIVE RELEASE METHODOLOGY

1. PRIMARY COOLANT CONCENTRATION IN GAS IN LIQISOTOPE prCi/cc pCi/mlI-131t-132t-133l-134I-135cs- 137cs-138KR-B5mKR-85KR.B7KR-BBxE-133xE-135SAMPLE DATADATE: TIME:LOCATION:

TEMPERATURE:

OFPRESSURE PSIAGAS VOLUME: CCWATER MASS: GRAMWATER LEVEL:2. CONCENTRATION OF HYDROGEN IN CONTAINMENT ATMOSPHERE H2 CONC (MOLE %): DATE:CNTMT TEMP:F TIME:CNTMT PRESS PSI LOCATION:

3. OPERATTNG POWER HTSTORY (tF CECC/lCS DATALTNK TNOPERABLE)

DATEffIME OF SHUTDOWN:_

START END AVG POWER START END AVG POWERPERIOD PERIOD IN MWt PERIOD PERIOD IN MWt4. CORE EXlT THERMOCOUPLE READTNGS (rF CECC/lCS DATALTNK TNOPERABLE)

THERMOCOUPLE DATE TIME READING NOTES:NUMBER (F)5. REACTOR WATER LEVEL HTSTORY (rF CECC/lCS DATALINK INOPERABLE)

DATE TIME READING RCS VOL NOTES:(uNrrs) (cu Fr)Send to: CECC Plant Assessment TeamDATA BY WBN I Activation and Operation of the I EPIP-GUnit 0 l Technical Support Center (TSC) lRev. 0049Paqe 71 of 74Appendix U(Page 1 of 1)TSC Accident Assessment Summary SheetNOTEThis Status Update Sheet is for use when the TSC ICS/ERDS data systems are inoperable.

TO: Tech. Assmt. Mgr. & NRC Coordinator and CECC Plant Assessment TeamFROM: WBN Tech. Assmt. TeamL HEAT REMOVAL CAPABILITY (Core Cooling, Heat Sink, RSC lnventory):

Status Tree:ll. FUEL INTEGRITY (Subcriticality, RCS Radionuclide):

III. RADIOACTIVITY IN CONTAINMENT; IV. CONTAINMENT INTEGRITY:

Status Tree:V. OVERALL ASSESSMENT

& RECOMMENDATIONS:

Prepared byWBN /EXTTime WBN I Activation and Operation of the I EPIP-6Unit 0 l Technical Support Center (TSC) lRev. 0049Paoe 72 of 74Appendix V(Page 1 of 1)EMERGENCY RESPONDER NOTIFICATION FORMPerson CallingFitness for DutyDateDepartment Refer to NPG-SPP-03.21 Fatigue Rule and Work Hour Limits(1)NameTimeCalledTimeNeeded toReportAlcohol 5 Hrs.Prior to Report(Y/N)Fit forDuty(Y/N)Overtimerestricted (1)DutyOfficialComments WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6Rev. 0049Paqe 73 of 74Appendix W(Page 1 of 1)WBN TSC Sign ln RosterDate of TSC Activation NAME (Print)Signature Position/Role EP Review WBNUnit 0Activation and Operation of theTechnical Support Center (TSC)EPIP.6'l Rev. 0049Paqe 74 of 74Appendix X(Page 1 of 1)TSC LOGPOSITION:

TSCDATE:PAGE OFTimeGommentsNOTE: Upon relief or termination of the emergency, ensure that the log is completed bychecking the log for completeness, then printing and signing your name.Signatu re (print/sign

)Date