ML17292B134

From kanterella
Revision as of 18:58, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
ML17292B134
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1997
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-220, NUDOCS 9712150118
Download: ML17292B134 (6)


Text

CATEGORYREGULAYINFORMATION DISTRIBUTI SYSTEM(RIDS)ACCESSION NBR:9712150118 DOC.DATE:

97/11/30NOTARIZED:

NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAU'fH.NAME AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.E.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000397

SUBJECT:

Monthlyoperating reptforNov1997forWNP-2.W/971205 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:INTERNAL:

RECIPIENT IDCODE/NAME PD4-2PDFILECENTER0N4COPIESLTTRENCL11111111RECIPIENT IDCODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EEXTERNAL:

LITCOBRYCE,JHNRCPDR1111NOAC11DENNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROF.COPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR10ENCL10 e01'e~

WASHINGTON PUBLICPOWERSUPPLYSYSTEMPO.Box968~Richland, Washington 99352-0968 December5,1997G02-97-220 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTNOVEMBER1997Transmitted herewithistheMonthlyOperating ReportforthemonthofNovember1997asrequiredbyTechnical Specification 5.6.4.Respectfully, pp(~)gf$PAWICNG.O.SmithPlantGeneralManagerMailDrop927MCC:EWMerschoff

-NRCRIVTGColburn-NRRCPoslusny, Jr.-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector

-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399+8&ir.~r.~-~97i2i50iia 9'7ii30PDRADQCK05000897RPDRIlllffflllfllllllllllfflllllllllllllll' OPERATING STATUSREPORTforWNP-2Date:December1,19972.3.4.5.Docket:50-397Reporting Period:NOVEMBER1997UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH720.0720.00.0818,029YEAR5,628.75,504.91,081.35,261,075 CUMULATIVE 81,501.378,755.03,037.575,569,350 10.Challenges tosafety/relief valves:None UNITSHUTDOWNS REPORTPERIOD:NOVEMBER1997DOCKETNO.:50-397UNITNAME:Wlg'-2DATE:December1,1997COMPLETED BY:BKaskoTELEPHONE:

(509)377M73No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(I)Method(2)CauseandCorrective ActionToPreventRecurrence NoneSUMMARY:AttheendofthemonthWNP-2wasoperating at100%power.lREASONA-u>pmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-anua2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other 0~-~l'sg