ML20198H213

From kanterella
Revision as of 16:44, 21 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 70-7002/97-12 on 971103-1214 & Nov. Violations Continue to Indicate Weakness in Implementation of Nuclear Criticality Safety & C/A Programs.No Response Required for Violation 70-7002/97-12-01
ML20198H213
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 01/09/1998
From: Hiland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20198H217 List:
References
70-7002-97-12, NUDOCS 9801130229
Download: ML20198H213 (3)


Text

_ _ _. _ _ - - - . .._ _. . _ .

L, ,, Des -

i, i 9

Jailuar*y 9, 1998 Mr. J. H. Miller Vice Presidont Production

  • United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive >

Bethesda, MD 20817  ;

SUBJECT:

NRC INSPECTION REPORT 70-7002/97012(DNMS)

AND NOTICE OF VIOLATION

Dear Mr,

Miller:

On December 14,1997, the NRC completed an inspection at your Portsmouth Gaseous Diffusion Plant. -The enclosed report presents the results of that inspection. The results of our inspection over a six week period covered by t',e'onclosed report indicate that the facility was operated in a safe manner.

Four violations of NRC requirements were identified during the inspection period The -

violations continue to indicate a weakness in the implementation of your nuclear criticality safety and corrective action programs. The first violation was another example of Violation 70 7002/97010-02 and indicated narrowly focused initial corrective actions. However, the corrective actions in your Response to Notice of Violation 70-7002/97010-02, received ,

December 23,1997 (CDP 97 2041), were reviewed, and adequately addressed the violation cited in this report. Therefore, unless the description in '.he December 23,1997, correspondence does not accurately reflect your corrective actions or your position, no response to Violation 70 7002/97012 01 is required.

Two violations dealt with the failure to follow written procedures for the timely and auurate l reporting of losses of nuclear criticality safety controls to the NRC, and the failure to follow written

, procedures for performing static cell treatments. The fourth violation constituted a failure to calibrate the infrared analyzer carts used at the cold recovery stations on a semiannual basis, as required by the Technical Safety Requirements, l

l The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violations are described in detailin the enclosed report. You are required to ,

respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.

, c(cordance with 10 CFR 2.790 of the NRC's Rules of Practice" a copy of this letter, its ersasures, and your response will be placed in'the NRC Pubiic Document Room.  % ,

l-se1

J. Miller 2 We will gladly discuss any questions you have concerning these observations.

Sincerely, Original signed by Patrick L Hiland, Chief Fuel Cycle Branch Docket No. 70-7002

Enclosures:

1. Notice of Violation
2. Inspection Report 70 7002/97012(DNMS) cc w/encis: S. A. Toalle, Manager, Nuclear Regulatory Assurance and Policy, USEC J. B. Morgan, Portsmouth Acting General Manager R. W. Gaston, Portsmouth Nuclear Regulatory Affairs Manager S. A. Polston, Paducah General Manager Portsmouth Resident inspector Office Paducah Resident inspector Office bec w/encis: R Pierson, NMSS P, Ting, NMSS W. Schwink, NMSS P. Harich, NMSS Y. H. Faraz, Project Manager Portsmouth, NMSS R. Bellamy, RI E. McAlpine, Ril F. Wenslawski, RIV/WCFO DOCUMENT NAME: G:\SEC\POR97012.DNM To receive a copy of this document, indicate in the box:"G" = Copy with]ut enc!osure E"=

Copy with enclosure"N"= No copy OFFICE Rlli l/V l l NAME Hitand:ib PJ.id DATE 01/9/98 OFFICIAL RECORD COPY

J. Miller 3 Qigtribution PUBLIC (IE 07) w/encls OCFO/LARFB w/encls A. B. Beach, Rill w/encls J. L Caldwell, Rlli w/encls C. D. Pederson, Rlll w/encls R. J. Canlano, Rlll w/encls Rlli Enf. Coordinator w/encls CAA1 w/encls DOCDESK w/encls

.