ML17285A904

From kanterella
Revision as of 14:30, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1989 for WNP-2.W/891206 Ltr
ML17285A904
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912210126
Download: ML17285A904 (8)


Text

ACCELERATED DI UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)

ACCESSION NBR:8912210126 DOC.D NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Nov 1989 for WNP-2. /891206 l r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL D TITLE: Monthly Operating Report '(per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL .A PD5 LA 3 3 PD5 PD 1 1 l,l SAMWORTH,R 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA ~

' 1 D AEOD/DSP/TPAB IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEABll," 1 '

1 PRPB11 1 1 NUDOCS-ABSTRACT 1 REG FI 01 1 1 RGN5 1 '

EXTERNAL EG&G S IMPSON g F 1 1' LPDR NRC PDR 1 NSIC D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP, US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

r

~

( ~ ~s ~ ~

~ ~ , ~ l

"'i 4 l i

'f 1 g I

'i i/~-'f ~ ii i g -~" ~e < if' <

j ~

l I h

g pl ~

S

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 December, 6; 1989 U.S. Nuclear, Regulatory Comission Document Control Desk Washington; D.C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, November, 1989 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,. J. B. Martin NRC Region V Mr,. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI; Farmington CT Mr,. J. T. Wheelock INPO Mr.. W. H. Lovelace NRC; Washington D.C.

8912210126 S91130 PDR ADOCK 05000397 R PDC-

<'

~

~ h DOCKET NO.

lNIT I'IRI 1E llNP-2 ORTE 12/1/89 LNIT SIIUTDOl'INS / AEOUCTIONS COMPLETED QY Le Hutchison AEPCAT PEAIOO November1989 TELEPIIONE (509) 377-2486; month, year

$ >i>. t>nE ~> -TU>n~ ~Gism> Ts&liU Yll llRST C IOt PAF E ACIN C None

~:

SUhWlNY

~:

lINP-2 Operated routinely during November with no outages or significant power reductions SYSTEM h COMPOhCNT F-Forced R-Equip Failure F-Rdmin l-Manual Exhibit F h H S-Scllcd 0-Maint or Test ~ G-Oper Error 2-Manual Scrain Instructions for C-Ae fue ling H-Other 3-Iluto Scram Preparation of'-

O-AeOulatory Aestriction 4-Continued Data Entry Sheet E-Operator Training 6 Aeduced Load Licensee Event Aepnrt I License Examination 9-OI:her (LEA) File (NUAEG-0161)

OPERATING DATA REPORT WNP-2 01-Dec-89

1. DOCKET: 50-397
2. REPORTING PERIOD: Nov-89 OUTAGE + ON-LINE HOURS 720
3. UTILITY CONTACT: LEONARD HUTCHXSON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRXCAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095 9 ~ IFNoneCHANGES I OCCUR ABOVE S NCE LAST REPORT i I G VE REASONS
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

None MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 8016 43520.2
13. HOURS REACTOR CRXTICAL 720.0 6113.7 32331.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 720.0 5939.4 31103.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2332340 16840250 85951455
18. GROSS ELECTRICAL ENERGY (MWH) 780990 5565030 28598530
19. NET ELECTRICAL ENERGY (MWH) 755603 5337830 27506138
20. UNXT SERVXCE FACTOR 100.0~o 74 '~o 71 5+o
21. UNIT AVAILABILITYFACTOR 100 '+o 74ol~o 72 '~o
22. UNIT CAPACXTY FACTOR (MDC NET) 95. 8>o 60 '~o 57 7~o
23. UNIT CAPACITY FACTOR (DER NET) 95. 4~o 60 '+o 57 5~o
24. UNIT FORCED OUTAGE RATE 0.04 4.9% 8. 8~o
25. FORCED OUTAGE HOURS 0.0 304.6 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)

REFUELING OUTAGE 4 13 90 for 45 DAYS

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

I

~ ~

AGE DAILY UNIT POWER LEVEL DOCKET NO.

WNP-2 DATE 12/1/89 COMPLETED BY LB .Hutchison TELEPHONE (509) 377-2486 t 10NTH NOVEMBER 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 1082 17. 1076

2. 1086 18. 1079
3. 1056 19. 1075 4, 1042 20.
5. 1079 21. 1077
6. 1023 22. 1082
7. 1048 23. 1079
8. 996 24. 1045
9. 950 25. 1065 876 26. 1079 10.

870 27. 1083

12. 1061 28. 1083
13. 1063 29 ~
14. 1075 30. 1085
15. 1079 31.

16.

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the (or the restricted power level line). In such cases, the average daily 100'ine unit power output sheet should be footnoted to explain the apparent anomaly.

"p