ML120650424

From kanterella
Revision as of 11:58, 12 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
End of Cycle Assessment Report 22
ML120650424
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML120650415 List:
References
Download: ML120650424 (1)


Text

Inspection / Activity Plan Page 1 of 1 03/05/2012 08:23:38 Report 22 03/01/2012

-06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 2 IP Problem Identification and Resolution 71152B 05/07/2012 05/11/2012 2 IP Problem Identification and Resolution 71152B 05/21/2012 05/25/2012 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 2 2 IP A lert and Notification System Testing 7111402 05/21/2012 05/25/2012 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/21/2012 05/25/2012 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/21/2012 05/25/2012 2 IP Performance Indicator Verification 71151 05/21/2012 05/25/2012 EB3 HS-TRIENNIAL HEAT SINK INSPECTION 1 2 IP Heat Sink Performance 7111107T 06/18/2012 06/22/2012 TI-182-TI-182 BURIED PIPING/TANK - PHASE 1 1 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/16/2012 07/20/2012 MODS-MODIFICATIONS INSPECTION 4 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/23/2012 07/27/2012 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/06/2012 08/10/2012 ROB TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 4 2 IP Fire Protection [Triennial]

7111105T 09/11/2012 09/13/2012 2 IP Fire Protection [Triennial]

7111105T 10/01/2012 10/15/2012 2 IP Fire Protection [Triennial]

7111105T 10/15/2012 10/19/2012 TI-177-TI-177 3 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 11/26/2012 11/30/2012 OL EXAM-INITIAL EXAM PREP 3 2 ROBINSON/FEBRUARY 2013 INITIAL EXAM AT POWER FACILITIES V23392 02/11/2013 02/15/2013 OL EXAM-INITIAL EXAM WEEK 3 2 ROBINSON/FEBRUARY 2013 INITIAL EXAM AT POWER FACILITIES V23392 03/11/2013 03/15/2013 CDBI-COMPONENT DESIGN BASES INSPECTION 5 2 IP Component Design Bases Inspection 7111121 04/08/2013 04/12/2013 2 IP Component Design Bases Inspection 7111121 04/22/2013 04/26/2013 2 IP Component Design Bases Inspection 7111121 05/06/2013 05/10/2013 PSB1-RP-RP PUBLIC RAD SAFETY BASELINE 5 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/20/2013 05/24/2013 2 IP Radiological Environmental Monitoring Program 71124.07 05/20/2013 05/24/2013 2 IP Performance Indicator Verification 71151 05/20/2013 05/24/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.