ML17284A823

From kanterella
Revision as of 00:38, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr
ML17284A823
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-204, NUDOCS 9812160076
Download: ML17284A823 (5)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSION NBR:9812160076 DOC.DATE: 98/11/30 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME~AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMXTH,G.O.

Washington Public Power Supply System RECXP.NAME RECIPXENT AFFILXATION I DOCKET I 05000397

SUBJECT:

Monthly operating rept for Nov 1998 for WNP-2.With 981207 ltr.D1STRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL 1 S1'BE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: A T E RECXPIENT XD CODE/NAME PD4-2 PD INTERNAL: AC FILE CENTE GN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 G EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 0 N (Q~g Lt&~'Qb NOTE TO ALL NRIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 1 t.I WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 December 7, 1998 G02-98-204 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT'OVEMBER 1998 Transmitted herewith is the Monthly Operating Report for the month of November 1998 as required by Technical Specification 5.6.4.Respectfully, G.O.Smi Plant General Manager Mail Drop 927M CC: EW Merschoff-NRC RIV C Poslusny, Jr.-NRR GA Pick-NRC RIV NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/1399 r 98i2i60076 98iiSO PDR ADOCK 05000397')"<8 PDR OPERATING STATUS REPORT for WNP-2 Date: December 1, 1998 2;3.4.5.Docket: 50-397 Reporting Period: NOVEMBER 1998 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 720.0 720.0 0.0 758,127 YEAR 5,852.0 5,631.2 0.0 6,090,426 CUMULATIVE 88,097.3 85,130.2 3,037.5 82,504,283 10.Challenges to safety/relief valves: None UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: December 1, 1998 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 REPORT PERIOD: NOVEMBER 1998 No.NA Date Type F: Forced S: Scheduled Duration (Hours)Reason (I)Method (2)Cause and Corrective Action To Prevent Recurrence

SUMMARY

The plant entered the month at 100%power.The plant reduced power to 80%on November 24th and to 65%on November 27th due to economic dispatch.The plant ended the month at full power operation.

~lREAS ON A-Equ>pment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other