Issue date: 11/07/1979
From: Costello O, Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18136A198 List:
References
NUDOCS 7911200369
Download: ML18136A199 (41)


Text

,, VIRGINIA ELECTRIC AND POHER COHPAl\!Y SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 79-10 1979 APPROVED:

7911200

-i-CONTENTS Section Operating Data Report Unit /fl Operating Data Report -Unit JI? 1:-Unit Shutdowns and Power Reductions

-Unit lfl Unit Shutdowns and Power Reductions

-Unit ff 2 Load Reductions Due to Environmental Restrictions

-Unit {fl Load Reductions Due to Environmental Restrictions

-Unit 112 Average Daily Unit Power Level -Unit ill Average Daily Unit Power Level Unit ff 2 Summary of Operating Experience Araendments to Facility License or Technical Specifications Facility Changes Requiring NRC Approval Facility.

Changes That Did Not Require NRC Approval Tests and Experiments Requiring HRC Approval Tests and Experiraents That Did Not Require NRC Approval Other Changes, Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Limits Were Exceeded Fuel Handling Procedure Revisions That Changed the Operating Hode Described In The FSAR Description of Periodic Tests Which Were Not Completed Within The Time Limits Specified In Technical Specifications Inservice Inspection Reportable Occurrences Pertaining to Any Outage or Power Reductions Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -liechanical Maintenance


1 1 2 3 4 5 6 7 8 9 10 11 11 13 13 15 16 17 20 21 22 23 27

-ii-Section Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit Cl -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Pm*;er Periods -Unit 112 -Electrical Maintenance lfaintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit Ill -Instrument Maintenance Haintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit f/2 -Instrument Maintenance Health Physics Surrffnary Procedure Deviations reviewed by Station Nuclear Safety and Operating Comiilittee after Time Limits Specified in T.S. 29 31 33 35 37 38


OPERATING D'A REPORT DOCKET NO.

DATE 07 NOV 79 COMPLETED BY O.J. COSTELLO TELEPHONE OPERATING STATUS 1. UNIT NAME 2. REPORTING PERIOD 3. LICENSED THERMAL POWER (MWT) 4. NAMEPLATE RATING (GROSS MWE) 5. DESIGN ELECTRICAL RATING (NET MWE) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS SURRY 1 791001 TO 791031 2441 ,------------------------, 847.5 !NOTES. I 822 I l 811 I l 7 7 5 I --------------*----------1 N/.A 9. POWER LEVEL 70 WHICH RESTRICTED, IF ANY N/A (NET MrlE) 10. REASONS FOR RESTRICTIONS, IF ANY N}A 11. HOURS IN REP02TING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ONaLINE. 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) 19 .. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE 24. SHUTDOWNS SCHEDULED OVER NEXT.6 MONTHS (TYPE,DATE,AND DURATION OF EACH) THIS MONTH CUMULATIVE 745.0 171.2 572.8 168.4 5 76. 6 362746.0 118055.0 112088.0 22.6 o/o 100.0 o/o 19,4 o/o 18.3 o/o 77.3 o/o REFUELING, NOV. 2.0, 1 7296.0 1884.8 3500.8 1880.1 60:120.0 37584.7 3500.8 36739.0 3504.6 3504.6 4522363.0 84878316.0 1453220.0 27760803.0 1380352.0 26352071.0 25 0 8 a/o 61.1 o/o 73,8 o/o 66.9 o/o 24.4 o/o 56.6 o/o 23,0 o/o 53.3 o/o 74,2 o/o 25.0 o/o FEB, 6 WEEKS, SNUBBER WEEK 25. IF SHUT DOWN AT END OF REPORT PERIOD, N/A EPTIMATE DATE OF STARTUP 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED OPERATI-DATA REPORT DOCKET NO.

DATE 06 NOV 7q COMPLETED BY O.J. COSTELLO TELEPHONE OPERATING STATUS 1. UNIT NAME 2. REPORTING PERIOD 3. LICENSED THERMAL POWER (MWT) 4. NAMEPLATE (GROSS MWE) 5. DESIGN ELECTRICAL RATING (NET MWE) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 7. MAXIMUM DEPENDABLE CAPACITY/(NET MWE) S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS SURRY UNIT 2 791001 TO 7q1011 847.S INOTES I 8 22 I i 811 I ! 7 7 5 I -------------------*


I NIA 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY NIA (NET Mf.IE) REASONS FOR RESTRICTIONS, IF ANY NIA 12. 13. 1-;L. * ;-.:>

  • 1 5
  • 17. 1 8
  • 11 g. 20;. 21. :2*2" 23. 2!.i.. HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH) GROBS ELECTRICAL ENERGY GENERATED (MWH) NET ELECTRICAL ERERGY GENERATED (MWH) UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (UBING MDC NET) UNIT CAPACITY FACTOR (USING DER NET) UNIT FORCED RATE SHUTDOWNS PCHEDULED OVER NEXT 6 MONTHB (TYPE,DATE,AND DURATION OF EACH) '25. IF PHUT DOWN AT £ND OF REPORT PERIOD, .EPTIMATE DATE OF STARTUP ,26. UNITE .TN "I'EST (PRIOR COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION THIS MONTH CUMULATIVf 7 )J. 5. 0 o.o 0. 0 0. 0 0. 0 7296.0 819. Li. 0. 0 818.9 0.0 57000.0 341.;.qq.

g iY. 0 o.o 0.0 1957q06.0 7919!.i.081.C 0.0 6!.;.Li.105.0 25858844.Q o.o 611521.0 24535605.0 0.0 11.2 olo 59.6 o/o O.O 11.2 ojo 5g,5 o/o 0.0 10.8 olo 55,5 o/o 0.0 10.2 o/o 5?.,4 o/o 0.0 0.0 21.0 olo SNUBBER FEB. 1980 -1 WEEK FORECAPT ACHIEVED I I I I 1

  • I I I I I I ' Dale ----1-------

79-8 10-01-79 79-.9 10-24-79 r: F111i.:cd S: Scl1cJ11lcd

.(1J/J7) t:: J 0 P-;j n ;.... :3 :i ::c Cl._..

SHUTJOOWNS AND rowmt m2put:nONS HEPOHT MON"lll OCTOBER 1979 Licensee Even I Hcpott H E"<t u ., ... *o "' 0 Ji*u t! \_('; tJ .g P.* 0 *EU 0 . u DOCKEY NO. 5 0-ZSO UNrr NAtltr;

____ _ I>A"fE

2.

l!Y Q. J. CO.s.I.ELLlL_

TELE!

357_:-3184 Cause & Cutrct:llvc Actlu11 1t1 Pcc11t:11l Hcc11uc11cc

--* F 571.3 D 1 Continua tion of shutdown due to Show Cause Order issued by the NRC concerning possible error in piping stress analysis performed by Stone & Webster. F 1 3 H1:arn11:

A*Eq1iipnicnl Fallll!c (Explal11)

Jl.Mal11trna11cc oi . D*Hq;11L1101y ltcst1ktl1111 E-Opi:catnr Tral11l11u

&

Exa1i1!11allll11

!-' * ;\ d ll ii II i S l 1 ii ( j *1 C C*011cri1llo1lal Li 111r l Expl;il11)

II Otlic<(bphl11) 3 Mclho1I:

2*Ma11ual Scram. J-Aulo111;dlc Scr;:nl. '1-0thcr (Explaln)

The Show Cause Order was modified Aug. 22nd to allow interim operatioll.

when required modifications are completed. Shutdown began on 3/19/79. >>Reactor tripped on feed flow/steam flow I mismatch coincident with lo steam gener ator level signal while feeding steam generators in manual during poHer crease. following startup. 4 5 l!id1llil1 0

  • ln1lrn1;tl1J111 for P11:11;11atln11 llr Data E1111y Sltccli f1H l.krn1cc Event lCcpucl (I.Ell) Fiic (NlJlt[G-01 (d) .

UNlT*Si!U-lTIOWNS.AND POWER JtEPUC-nONS HEPOrtT i OCTOBER 19 79 Licensee Evwl ltcpot! :/f E-..r u 4' -*o 0 U'l u -* r::: u"L § *o Cl. 0 *£1 u a . u DOCKET NO. 50-281 UNIT SURRY =-2 ____ , DAlE NOVEMBER 2, 19 79 llY Q_,__J_,_SOSTEL'f:Q__

TELE! llONI!. ( 80Lf) 35 7_-:-3184 CilllSC & C1>11tdlvc Ai.:111>11 to Ptc11c11l (lcc1u1cncc


* ------___ , ____________ , ____ -------!-------------*----------

e 79-8 10-01-79 *e [_ .... __ r: F!lrccd . Sclicd1dcd

('J/17) ., s 745 c l *-----*----

f{,:arn11; A-Eq1dpmc11f Fall111c (Explal11}

o(

C.Hcfucllng . D*Hq;1ila11uy E*Opc1at1ir T1:d1il11u

&

Exa111l11allo11 F-Ad11il11isl1all*1c c:opcr;itl1i11al Liwr (Explain) 1 l O 1111.! r ( Exp I :ii 11) 3 Meth oil:

Scram. J-Aul11111af le Scfam. 4-0llicr (faplal11)

Continuation of shutdown for refueling and steam generator replacement which began on 2/4/79. 4 l!xhl\ill (I. I nil 1111:111>11' for P1q1aratl1111 llf ()ala E1111y for I ..,... I Even! lti:purl (I.Ell) File (NUill:(i-0 I (i I } 5

  • LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.l MONTH: October, 1979 DATE TH1E HOURS LOAD, HW REDUCTIONS 2 M\\T MWH REASON ----None d uring this reportir g period. I MONTI-ILY TOTAL 0
  • LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH: October, 1979 DATE THfE HOURS LOAD 2 MW REDUCTIONS 2 HW HWH. REASON ----None du:r ing this reporting period. ' MONTHLY TOTAL *-*- MQNTlJ: OCTOBER 79 AVERAGE DAILY POWER LF:VEL DAY (MWEwNET) 1 o.o 2 o.o 3 o.o l.j. o.o 5 o.o 6 o.o 7 o.o 8 o.o 9 o.o 10 o.o 11 o.o 12 o.o 13 o.o 14 o.o 1 r _.:i o.o 16 o.o DAILY UNIT POWER LEVEL FORfrf INSTRUCTIONS DOCK.ET NO UNIT DATE COMPLETED BY 50!0280 0 J COSTELLO AVERAGE DAILY POWER LF:VEL DAY (MWE""NET) 17 o.o 18 o.o 19 o.o 20 o.o 21 o.o 22 o.o 23 o.o 2LL o.o 25 352.8 26 519.S 27 748.0 28 789.6 29 755.5 30 756.4 31 750.8 ON THIS FORN., LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE":;1NET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTn ING MONTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE Nti'I' ELECTRICAL RATING OF THE UNIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 o/o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE ANOMALY.
  • DOCKF.NO U:T SURRY II DATE 1hh79 COMPLETED BY 0 J COSTELLO AVEBAGE DAILY rL!!.1J:..

POWER LEVEL MONTH: OCTOBER 79 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MllE :t NET) DAY (UNE::NET) 1 o.o 17 o.o 2 o.o 18 o.o ... ... 3 19 o.o 4 o.a 2a a.a 5 a.a 21 a.a 6 a.a 22 a.a 7 a.a 23 o.o 8 o.o 24-a.a 9 o.o 25 o.o 10 o.o 26 o.o 11 o.o 27 o.o 12 o.o 28 o.o 13 o.o 29 o.o 14 o.o 30 o.o 15 o.o 31 o.o 16 o.o DAILY UNIT POWER LEVEL FORM INS'I'RUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT RJWER LEVEL IN FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT":!!

ING MONTH. NOTE THAI' BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF T.HE UNIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS THE 100 °/0 LINE (OR THE REB'I'RICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY. ... . ' .... . *.

SUMMARY

OF OPER2TING EXPERIENCE e OCTOBER, 1979 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in ificant non-load related incidents.

UNIT 1 October 1 October 23 October 24 October 25 October 26 October 27 October 28 October 31 UNIT 2 October 1 October 31 This report period begins with the unit in a cold shutdown condition.

Reactor coolant system temperature and pressure exceeded 350°F/450 psig at 1855. The reactor was taken critical at 1950 and the main generator synchronized to the line at 2235 and a power increase began. The reactor was at approximately 30% power at 2254 when it tripped on a feedflow/steam flow mismatch coincident with low steam generator (S/G) level signal. At 2335 reactor was taken critical at rod height below that allowed by the estimated critical position (ECP). Rods were immediately inserted to shutdown the reactor while ECP was re-evaluated.

It was mined that the problem with ECP was due to actual boron tration being less than figure used in computing ECP. A new ECP was calculated and reactor was taken critical at 2356. At 0055 the main turbine-generator was synchronized to the line and a power increase was begun. The power increase was stopped at 50% reactor power at 0235 to run a calorimetric.

At 0300 lA Main Feed Pump (1-FW-P-lA) was taken out of service for repairs to a leaking pump seal and reactor power was held at 50%. At 1140 a power increase was begun to 65% reactor power. At 1250 the power increase was stopped at 60% reactor power and 460 :tvIWe until repairs to 1-FW-P-lA were completed.

At 1525 1-FW-P-lA was returned to service and a power increase to 100% was begun. The unit was at 100% reactor power at 194 7. At 2019 reactor power was reduced to 98%, 775 until secondary calibration data can be evaluated.

At 1245 evaluation qf secondary calibration data was completed and unit taken to 100% reactor power. At 0200 the clocks were set back one hour for securing from Daylight Savings Time. This reporting period en.ds with the llllit at 100% reactor power. This reporting period begins with the unit at cold shutdown, all fuel removed from the reactor and steam generator replacement outage in progress.

This reporting period ends with the unit at cold shutdown, with the reactor de-fueled. AMEND HE NT TO FACILITY LICENSE OR October, 1979 SPECIFICATIOUS There were none during this reporting period.

FACILITY CHANGES REQUIRIHG NRG APPROVAL OCTOBER, 1979 There were none during this reporting period. FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL OCTOBER, 1979 Design Changes Unit 1. DC-78-11 Addition of Operations VHF Repeater to the 2H 1,2 Emergency Bus Description-This design change reconfigures the communications system so that the Operations Department VHF repeater is powered from the 2H Emergency Bus. This would assure continuing operability during all station accidents.

Summary of Safety Evaluation The margin of safety has been increased since this modification will provide ample power to the communications system via the emergency diesels under LOCA plus blackout conditions.

2. DC-78-S27 Main Warehouse Fire Protection Modifications 1,2 Description-This design change moved the Yard Fire Protection System Isolation Valve to meet seismic requirements by isolating the branch line. Summary of Safety Evaluation The modification has no safety implication other than isolating the branch line. 3. DC-79-S28 Safety Injection on Low Pressurizer Pressure Only 1 Description

-This design change was prompted by a NRC requirement to have automatic safety injection actuated on low pressurizer pressure as stated in IE Bulletin 79-06A. It converts the automatic Safety Injection initiated from one of the three pairs of low izer levels in coincidence with Low Pressurizer pressure to a Safety Injection initiated on two of three Low Pressurizer pressures.

Summary of Safety Evaluation This design change does not constitute an unreviewed safety question.

However, it does provide protection against an accident not previously evaluated in the FSAR.

Design Changes FACILITY CHANGES DID NOT REQUIRE NRC APPRO,.. (CONTINUED)

4. DC-79-S35 Auxiliary Building Hydrant Block Valve Installation Description

-This design change involved installing a block.valve in the 6" branch line to isolate hydrant l-FP-82 without losing fire protection to the auxiliary building.

Sununary of Safety Evaluation Installation of this block valve does not create an unreviewed safety question and the modification to the branch line is not contrary to any safety analysis.

Unit 1,2 AND EXPERIMENTS REQUIRING

... NRC APPROVAL

  • October, 1979 There were none during this reporting period. TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL October, 1979 There were none during this reporting period. CHANGES, TESTS October, 1979 There were none during this reporting peiiod. __J -SURRY POWER STATION CHEHISTRY REPORT October ' 19Z2._ T..S.6.6.A.ll PRIMARY COOLANT UNIT NO. 1 UNIT NO. ANALYSIS MAXIMUM MINIMUM AVERAGE MAXIMUM MINiffiJM Gross Radioact., µCi/ml 5.18E-l 5.86E-4 9.88E-2 --Suspended Solids, ppm 0.2 0.1 0.1 --Gross Tritium, µCi/ml 3 .69E-2 3.69E-2 3.69E-2 --Iodine-131, µCi/ml 4.60E-3 3.15E-4 2.02E-3 --I-131/1-133 0.1855 0.1120 0.1464 --Hydrogen, cc/kg 27.4 22.4 2 5.6 --Lithium, ppm 0.50 0 .26 0.38 --Boron-10, ppm + 475.3 77.0 353.4 --Oxygen-16, ppm 0.000 0 .000 0 .000 --Chloride, ppm 0.05 0.05 0.05 --pH @ 25°C 6.62 4. 74 5 .38 --+ Boron-10 = Total Boron x 0.196 Phosphate Sulfate 50% NaOH 112 870 1405 NON-RADIOACTIVE CHEMICAL RELEASES, POUNDS T. S. 4 .13 .A .. 8 Chromate 0 .07 Chlorine 0 .0 2 AVERAGE --------...,. --Remarks: Unit #1 at cold shutdown October 1 to October 23, -Critical on October 24, 1979 Unit #2 undergoing steam generator replacement project -RCS and RHR Systems drained days the October October October October October October ... DESCRIPTION OF ALL THERMAL DISCHARGE LIMITS October, 19 79 Due to impairment of the circulating water system thermal discharge limits were exceeded as noted. 26, 1979 Exceeded 17.5°F 6T across station 27, 1979
  • Exceeded 17.5°F 6T across station 28, 1979
  • Exceeded 15°F 6T across station 29, 1979 Exceeded 15°F 6T across station 30. 1979 Exceeded 15°F 6T across station 31, .1979 Exceeded 17.5°F 6T across station on the following
  • Indicates dates where station 6T was <15.0°F across the station for sometime during the day. These 6T excursions were allowable under Technical Specifications 4.14.B.2.

There were no reported instances of significant adverse environmental impact. The temperature change at the station discharge exceeded 3°F per hour on three occasions during October as follows: (1) On 10-25-79 exceeded 3°F/hr. during power increase to 50% reactor pow.er. (2) On 10-26-79 exceeded 3°F /hr. while removing "lD 1' waterbox from service for leak check. (3) On 10-27-79 exceeded 3°F/hr. while returning 11 lD 11 waterbox to service after maintenance.

These events were reported in accordance with Technical Specifications 4.14.

FUEL HAlIDLIUG October, 1979 Twenty-four (24) refabricated fuel assemblies were shipped from Westinghouse Nuclear Fuel Division at Columbia, South Carolina and arrived on site during this reporting period. e UNIT 1 -FUEL HANDLING October. 1979 DATE NO OF ANSI NO. NEW OR SPENT FUEL SHIPPED/RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEI i None during this reporting period. i -' I I I .: I --------*--*---* ------. --. *-----*--*-*------*-*-*-*****.

.. ..... *--* --...... . --. -


e UNIT-1 9--FUEL HANDLING October, 1979 DATE* NO OF ANSI NO. NEW OR SPENT FUEL ASSEMBLIES PER SHIPMENT TNITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL 10-4-79 12 LM06G4/3.4%

2. 5 mR/hr. --LM06ES/3.4%

2.5 mR/hr. LM06EW/3.1%

2.5 mR/hr. LM06ET/3.1%

2 .5 mR/hr. LM06FZ/3.4%

2.5 LM06G2/3.4%

2.5 mR/hr. LM06ER/3.4%

2. 5 mR/hr. LM06GC/3.4%

2 .5 mR/hr. LM06FU/3.4%

2. 5 mR/hr. LM06F2/3.4%

2 .5 mR/hr. LM06EX/3.4%

2.5 mR/hr. LM06Fl/3.4%

2.5 mR/hr . 10-11-79 LM06FT/3.1%

2. 5 mR/hr. LM06FR/3.1%

2.5 mR/hr. LM06FN/3.1%

2.5 mR/hr. i LM06FP/3.1%

2 .5 mR/hr. I LM06FJ/3.1%

2.5 mR/hr. LM06FL/3.1%

2.5 mR/hr. I LM06G6/3.4%

2.5 mR/hr. I LM06FG/3.4%

2.5 mR/hr. I LM06FE/3.4%

2.5 mR/hr. I LM06FD/3.4%

2.5 mR/hr. LM06Fl/3.4%

2. mR/hr. *1 I LM06FF/3.4%

2 .5 mR/hr. I .I I I I I -------------------___ :...._ --.. -----........ --------*-. *--***-* -... -... *. -*---------*1 -.. ---**-' .. PROCEDURE REVISIONS THAT W OPERATING MODE DESCRIBED rn*FSAR October, 1979 There were none during this reporting period. DESCRI ""ON OF PERIODIC TESTS WHICH WE LETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS October, 1979 PT-44.1 Piezometer Readings documenting the depth of the watertable at Surry Power Station was not completed when scheduled (10-21-79).

The test requires checking the water level in the wells each month. The test was completed on 10-31-79 with the results being within allowable tolerances.

-zz= INSERVICE INSPECTION October, 1979 e There was none during this reporting

.... :z:F REPOR ABLE OCCURRENCES PERTAINING TO IT OUTAGE OR POWER REDUCTIONS

-October, 1979 There were none during this reporting period.

  • . Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT /fl Mechanical Maintenance t DEPl'=MECH r' UNIT1 0 ! WAINTENANCE OF SAPETY RELATED l!YBTEMS DURING OUTAGE OR REDUCED POWER PERIODS) RETSEHVlll' SYS COMP MARKNO

SUMMARY

WKPERP u MR .TOTDWNTM

() 10/01/79 CIJ PIPING 8wCH:t17 DC 79vS32C .'-l'RENGTIJEN HILTI BASF:PLAT COMPLETED AS PER ATTACHED SKETCH 1 909140941 390 10/01/79 cc PIPING 10cCC1170 DC *79.,.c::i2A INSTAI,L CONSTRAINT COMPUTED AS PER ATTACIJED SKETCIJ 1 909171209 . 276 () 10/02/79 RC PIPING 14uW1PD"17v601 Rb'PAIR WELD NO 13 INCOMPLETE FUSION RE'PAIRED AREA OF WF:LD 1 907161142 1532 10/02/79 RC PIPING 14aWFPDv9w601 REPAIR WELD NO 6 INCOMPLET8 F'USION REPAIRED AREA OF WELD 1 907161144 1440 10/02/79 RC PIPING 1411WFPDa911601 REPAIR WELD NO 11 INCOMPLETE FUSION Rb'PAIRED AREA ON WELD 1 907161145 1440 <) 10)02/79 RC PIPING 14nWE'PDw9a601 REPAIR WELD NO 5wPOROSITY REPAIRED AREA OP WELD 1 907161146 1440 10/02/79 PW PIPING 14t1WFPDu9

.. 601 REPAIR WELD NO 9 .TNCOMPLE'I'E REPAIRED AREA OF WELD -* 1 907180910 1484 10/02/79 RC PIPING 14 ..

REPAIR IvELD NO 13 RE'PA.rRED AREAS ON WELD 1 907200936 1056 10/02/?9 FW PIPING REPAIR WE'LD NO 5 LACK OF' FUS.TON REPAIRED AR8A OF WELD 1 907231042 1440 10/02/79 PW PIPING RE'PAIR WELD REPAIRED AREA OF WELD -*-1 907240831 1440 10/02)79 cc PUMP 1wCC&Pw2A PUMP IJAS VE'RY BAD SIJAFT LEAK RENElvED SEAL ASSY 1 910010630 14 ') 10/02/79 cc VALVE 1wCC11764 CIJECK VALVE DOES NOT WORK REPAIRED VALVE 1 910010640 6 10/03/79 PW PIPING 811WCMUw5 DC 79nS32B INSTALL SNUBBER COMPLE'TE'D AS n:R A1'TAC/JED SKETCIJ 1 909171247 304 10/03/79 F'W PUMP 1"FWnPv3A O.TL SUMP LEVEL IND.TCATOR IS BROKE ADJU.'ITE'D FOAT VALVE 1 910030700 3 9,_) 10/04/.79 cc VALVE 1"CC"752 CIJECK VALVE' DOES NOT IJOLD REPAIRED VALVE 1 910020335 9 10/05/79 Cl/ PUMP 1wCH11P"113 SWAP UNIT 1 WIT/J UNIT 2 WB OIL PMP REMOVED AND REPLACED WBE OIL PUMP 1 909131501 432 10/05/79 CH INS'l'R RELOCATE' TRANSMIT'I'ERS RELOCAED TRANSMI'I'TER 1 909241100 264 ;_) 10/05J79 SW VALVE 1aSW"113 C/JECK VALVE DOES NOT IJOLD REPAIRED VALVE 1 910040635 28 10}05/.79 SW STRAINER 1w&.,P.10A REPLACE .<;']!RATNER BODY REPLACED STRAINER .. -*---1 9100110745 . --26 -10/.05/79 SW VALVE 111SWd111 VALVE DIFl!'ICULT TO OPERATE REPLACED VALVE 1 910040748 28 u 10/07/79 CH PIPING TE.<;T FLANGE COMPLETED 1 909241547 274 10/08/79 EE COMPRE8S NO 1 BLOWN HEAD GASKET RE'PAIRED COMPRESSOR

.. ---1 910072315 6 .. *J 10/09}79 BS OTHER SEAL BARRTER Pl' 24,11 SEALED HOLES AS .rT WAS REQUIRED 1 907011319 1548 N ., 10/09/79 RC VALVE MOVwRCd591 PACKING LEAK TIGIJTENED PACKING GLAND 1 910080500 3 V1 v I 10/10/79 PR SNUBBER 1 .. RSaHSS11103 REMOVE AND REINSTALL TURNED SNUBBER 90 DEG 1 *910092337 3 10/12/79 BS OTHER SEAL BARRIER PT 24,11 SEALED BARRIERS AS IT WAS REQUIRED 1 907011318 1656 .... , 10/.12J79 RL PIPING 3aRCw6d52 PIPED DINAGED REPLACE PIPE AS PER REQUEST 1 908251550 1056 ** J 10/12/79 RC TANK bRC11TK112 RE'GROUT CONCRETE SUPPORT

  • REGROUT CONCRET AS PER LETTER .. ***-*1 -* 910050840 211 10/13/79 CH PUMP 1wCHwPQ2C PUMP VIBRATES EXCESSIVELY REBUILT PUMP 1 909290630 75 u 10/14/79 cc VALVE Rv-ccv?.198 R1'.'NOVE VALVE COMPLETED 1 910021316 271 10/17/79 SI MOV MOVw1842 SE'AT AND D.rsc LeAKS TIJRU REPLACED VALVE MDV 1842 *1 903071700 5?.B 10/17/79 CJ/ MDV MOVwC/Jw1350

/.JOV OR LINE UPSTREAM OF MDV CLEANED LINE OUT 1 910131130 l.j8 .. 10/17/79 CIJ VALVE' 1aCIJr4:10 VALVE LEAKS DRATN REPLACE DOPE QN TAIL PIECE+CAP 1 9:10152358 53 \.) 10/17/79 cc l'.f PJNG 1. s,,rc ... :io DC REPLACE ROD ffANGBR RE'Pl,ACE ROD HANGER AS PE'R 1 910160904 28 10/10/?ll n.c: O'r!/li.'R ,qf:AL BARRIER Pl' 2ll .11 .'IEALEV BAh'RIERS 1 907011320 151 _9c) 10/18/79 RC PI Pl NG REMOVE LEAD FROM SAFETY RELATED PIP! REMOVED ALL LEAD SHEILDS 1 909291130 79 ' 10/18/79 RC VALVE 11cv.,nc.i557 A VALVE STUCK IN NID POSITION REPLAC8D GASKET 1 . 909300500 643 . 10/18/79 CIJ VALVE :1nCllii365 LEAK BY SEAT RENE'WED GASKET 1 910131331 72 t) 10/18/79 C/J VALVE 1aC//,,413 LEAKS THRU 8EAT11ADJUST VALVE ADJ VALVE CAPPED 1 910131411 65 10/19/79 BS OTIJER SEAL BARRIER PT 24.11 SEALED AS IT WAS REQUIRED 1 907011317 2790 10/19/79 BS OT/JER SEAL BARRIER Pl' 21.j,11 SE'ALED BARRIERS AS THEY WERE REQ 1 907011327 1642 . ) i 10/19/.79 SI VALVE ittSiw48 LOCAL POSITION INDICATOR MISSING INSTALLED NE'W INDICATOR 1 910181156 5 10/.19/79 SI MOV MOVmSiw1860B TIJE LOCAL POSITION INDICATOR IS BROK INSTALLED NEW .TND.fCATOR

.. 1 910181157 6 10/19/79 cs NOV MOV ... CSa156A T/JE LOCAL POSI.TION INDICATOR IS BROK INSTALLED NEW INDICATOR 1 910181158 6 \) 10/19/.79 SI NOV MOVwS.r w1885C TIJE LOCAL POSITION .TNDICATOR IS BROK FIXED POSITION INDICATOR 1 910181159 4 10/19/79 cs MDV MOVwCSw101B TIJE MANUAL POSIT.TON IND IS M.TSS.TNG REPLACED POSITION INDICATOR

1 910181160 4 10/19/79 SI MDV MOV11SI"1890A THE LOCAL POSI'l'ION INDICATOR IS BROK FIXED POSITION INDICATOR 1 910181200 4 ._) -.. -.. *-. ... -*-*--* **---:1...) .. -.. *---*-*--**-***

-* ... ----------*--

  • -\_)

Ii DEPT=MECH UN.fTl (MAINTENANCE:

OF' SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS) RETSERVIYI' SYS COMP MARK.NO

SUMMARY

WKPERF u 10/19/79 SI MOV MOV11Siw1890B LOCAL POSITION INDJCAT IS BROKE FIXED POSITION INDICATOR 1 10/19/79 SI MOV MOV .. S.l'Y1890C LOCAL ?OSI7'.WN INDJC ATOR .rs BROKE JNS'I'ALLl!.'D Nll'W INDICATOR 1 10/21/79 PR SNUBBER SNUBlJEll AS LEFT CONDUCTED AS LEF'l' INSPECTION 1 10/21/79 cc PIPrNG 1B,,CC-16 D/C 79wS32A INSTALL STRUT INSTALLBD S'I'RUT AS PER SKETCH 1 10/21/79 RC VALVE 111/1Cw102 ADJUS7' PACKING ADJU,<:7'ED PACKING GLAND 1 10/21/79 RS PUMP BOL.T SCREEN JN PLACE BOLTED SCREEN IN PLACE 1 10/21/7CJ CIJ VALVE' MOV .. Cl/w1286C PACKING LEAK ADJUS1'ED PACK.[NG 1 10/21/-79 CIJ VALVE' MOVwCHw12B1C PACKING LEAK ADJUS1'ED PACKING 1 10/21/79 /.JS VALVll' TVwMSw101A WBST SIDE AIR CYCLINDli:R LEAKS FIXED LEAK 1 10/21/79 MS VALVE 1'VvMSu101C MISSING BOL1' ON WEST AIR CYCLIND8R REPLACED BOLT 1 10/21/79 RC VALVE 1uRCn70 ADJUST PACKING ADJUSTED PACKING GLAND 1 10/21/79 PW PUMP 1wPWmP .. 3A REPLACE PACKING R8PACKb'D INBOARD PACKING BOX 1 10/22/79 cs TANK 12wCSw2"153 BUFF OUT ARC SPOTS. Rb'MOV8D EI,8CTR.[CAL ARC SPO'l' ----1 10/22/79 RS PUMP PUMP N07' WORKING PUMPED OUT SUMP 1 10/23179 f:'W VALVE lwrSW .. 54 STEM GATE VLV NOT INSTALLED IN SYS 1.'00K TEMPORARY OFF INSTALLED NEW 4 V 1 10/23/79 RH PIPING 3wRHal 3,,602 FLANGE LEAK AT RELIEF VALVE REPAIRED RED FLANGE LEAK .. **-1 10/23/79 BS OTHER Vb'RY HIGIJ LEAKAGE REPLACED GASKETS AND LINK TO STEM 1 10/23/79 RC PIPING RE'MOVE SPOOL PIECES+BLNK FLANGE INSTL BLANK FLANGES AS REQUIRED 1 10/23/.79 cs TANK BOLT DOWN MANWAY INS'l'ALLED MANWAY COVER 1 10/23/79 RC VALVE HCVaRCw1551C ADJ. PACKING ADJ. PACKING 1 10/23)79 RC VALVE i.11c.10 ADJUS1.' PACKING ADJ. PACKING 1 10/23/79 RC MOV MOV*RCw1591 ADJUST PACKING ADJ. PACKING 1 10/23/.79 RS PMP MTR PLACE COVER SCREEN INSTALLED COVER OVER HOLE ON TOP SUM 1 10/.24J79 CJJ PUMP 1wCH11Pv2B PUMP CASING IS LEAK.rNG REPAIRED LEAK 1 10/24/79 RC VALVE t.RCv 36 REPLACE E'LEX ON BLANK FLANGE REPLACED GASKET 1 10/25/79 CV VALVE 111CVw45 VALVE STUCK CLOSE CHECK VALVE RUSTED UP 1 DEP'l' TOTAL MR TOTDWNTM 910181201 11 910101202 5 908241415 1068 910080906 3111 910131256 5 910131332 7 910151402 3 910151405 3 910181345 13 910181347 13 910181540 5 910212130 2 910190820 75 910200344 8 906161701 3071 908261041 3 910210940 24 910211310 48 910212155 5 910230001 1 910230002 1 910230003 1 910230004 1 910131301 256 910222330

?.1 910241546 24 *"**tt***

            • \"-'! () () .) ) ) e ) ) ) : * .. ..* ' .! i ! .J *--* .J 1* l : .. ,) .... -***-*--*

____ I I ( Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT #2 Mechanical Maintenance DEPJ';.MECll UNIT2. (MAfNTENANCE OF SM'ETY RELA.TED SYSTEMS DURING OUTAGE OR REDUCED POltER PERIODS) RE'T.%'11V DT SYS COMP MARKNO

SUMMARY

WKPERF u 10/01)79 MS VALVE 10J04/79 MS VALVE' 10/011/79 CH VALVE 2*MS*11?.

m:PACK+Rl'.'SEAT+IIECOND VLV INSTALLED NEW VALVE 2aMS*112 2 2=MS*120 REPACK-+Re'Sl'.'A1'+RECON/.J !V RE.'BUILD VALVE 2 11cv .. c11 .. 2 311 OP/'.'N AND INSPBC:r VALVE' R/'.'PAIRED VALVE 2 10/04/79 VALVll' 10/09/79 BS OTIJER 2nSWo129 FLANGb' £/!,'AK ON OUTLET FLANGE REPAIRED FLANGE 2 SEAL BARfll[','R PT 24.11 COMPLETb'D 2 10)12/79 BS OTIJER SEAL IJARRIER Pl' 24.11 Sb'ALED AS IT REQUIRED 2 10/12/79 BS OTHER 10/12/79 BS OTHER SEAL BARRIER PT 24.11 SEALED BARRIERS AS .IT IS REQUIRED 2 SEAI, BAllR.IER JY1' 24 .11 SEALED _BARRIER AS IT WAS REQUIRED 2 10/12/79 SI VALVE 10/12/79 s.r VALVE: 10/12/79 s.r VALVE MOVwSI *2 885B PACK.fNG LE'AK.fNG REPAIRED 2 Mov.s.r .2ee5c PACKING LBAKING TIGHTEN PACKING GLAND 2 MOVu8.[ *2 885A LlMITORQUB LE'AK.fNG GREASE REPA.fRE'D 2 10/15/79 MS VALVE 10/17179 BS OT/lER 10/17/79 BS OTIJER 10/18/79 SI VALVE 2rMSd49 RECONDITION VALVE AND RESEAT REPLACED VALVE SEAL BARRIER PT 211.11 BARRIERS SEALED AS. J7° WAS REQUIRED 2 SEAL BARRIER P'I' 24 .11 BARRIERS SEALED AS RFXJUWED 2 2nSid27 CIJECK VALVE LEAKS TllRU REPAIRED VALVE SEAT/REPLACE' 2 10/18/79 MS VALVE 2.,MSa379 VALVE LEAKS T/lROUG/1 REPLACED VALVE 2DMSw379 2 10/19/79 n VALVE 10/22/79 RC SG 2.sI.t06 C/lECK VALVE LEAKS THRU REPLACEED VALVE 2vSin106 2 2.,RC*Ea1B INSTALL SECONDARY MANWAY B s}g INSTALLED A

COVE.R 2 10/23)79 SI VALVE 2*Siv144 CIJECK VALVE LE'AKS THRU REPLAC'E'D VALVE 2 10/26/79 Rll VALVE 10/27/79 cc P.TP.fNG MOV2700 DISASSE'MBLE VALVE FOR .TNSPECTION .fNSPECTED

+ REPAIRED VALVE 2 2*RCwP*1C FIT CC L.fNES ON C RCP INSI'ALLE.'D SPOOL PIECES 10/30/79 CH VALVE 2nC/1u24 STEM STOP NU.TS ARE STR.CPED OFF REPAIRED SRIPPED THREADS 2 10}31/79 F'W PUMP 2 .. PWwP*3A REPACK PUMP REPAIRED PUMP 2 DEPl' TOTAL ------* MR T07'VWNTM 902250022 4426 902250020 4728 907101129 960 909271947 4 907011315 1584 907011321 744 907011331 1512 907011333 744 910081423 211 9100814211 24 910081425 24 902250031 41011 907011329 2304 907011330 23011 901001522 56Ci2 9021111415 5573 901081521 5687 96 901081520 5232 903240902 2032 910191030 171 9102110330 9 910230640 19

            • e *e ell/ 0 I.) ) ) . j .. ) *. I N*. oo' I ,) '**) I \ '-. ./ ., *. ) i ! '.1 I *-**-\
  • i. 1..) . -****--*--j

( Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT Ill Electrical Maintenance DEFT=ELEC RE.'TSERVDT SYS COMP 10/05/79 BR TANK 10/05/79 CH /IT 10/08/79 CH VALVE.' 10/08/79 Cl/ VALVE 10/15/79 SI INH7'R 10/15/79 Cl/ INS'fR 10/17/79 SI MOV 10/18/79 EPL BUS 10/10/79 CJ/ m* 10/18/79 Cl/ IJT 10/18/79 SW DT8SE.'L 10/19/.79 CH /JT 10/19/79 PE O.THE.'R 10/23/79 EE PMP MTR 10/23/.79 MS INSTR DEFT TOTAL UN.f.T1 WAf.NTENANCE.'

OF SAFETY RELATED SYSTEMS DUR.f.NG OUTAGE OR REDUCED POWER PERIODS) MARKNO SUMMAl?Y 1wDBRu7%15 VElnn TANK /JEATERS AR[!,' WORKING PNL 8+9 UN.fT 1 PILTl!,'R AND A BA 2'RANSPER PMP /JCV*1C/Ju1200C ADJ. LIMIT L.fMIT H./17'C/l NE.'ED ADJ, D/C 79828 CllANGE E'LE'CTR.TCAL WIR.TNG NO INDICATING LIGHT MOVnSI111842 DISCONNEC7' AND RECONNECT 1C1 GROUND INDICATED ON 1C1 SWBD PNL 9 LOW TEMP ALARM PNL8+9CKT13A LOI' AMP RE'ADING 1"SW,,Pu1C DIESEL BAT7' PROBLEM CHECK BOTH CHANNELS OF HT DwR11Bw18 REPAIR GAGE LINE BAD BEAR.TNG MOTOR RVwMSw101A L.TG/JTS IN DIC ATE .rNn'RMEDI ATE WKPERF' u MR TOTDWNTM LOAD TESTED HEATERS SAT 1 909301502 CLEARED ALARM AND LOAD CHECKED CIRCU 1 910010900 REPLACED LIMIT SW.fTCH 1 910030336 REPLACED LIMIT SW.r.TCH 1 910030337 COMPLE'TED DESIGN CHANGE 1 909191517 POUNDED DRK RE'D TAGGED 1 9100111033 f(ECONNECTED MOV AND 2'ESTED SAT ** 1 909251224 NO GROUND 1 907150145 ENERGIZED I/EATERS WORK SAT. 1 908262315 RE'PLACED

//EAT TAPE

  • 1 910170726 REPLACED DATT AND TESTED 1 9101710110 RENEWED STR.fP /IEATERS 1 909190400 RE'PLACE'D F'I1'2'INGS LEAKS TESTED * * * *--*-* 1 *** 910031244 REPLACED BEARING 1 9011240430 ADJUSTED LIMIT .'MITCH 1 910201300 18 119 79 79 336 144 525 2064 1970 26 26 44 336 5596 41l Wlfft*.,WWW
            • 0 ) I I \ .i . ) Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT 1/2 Electrical Maintenance

-1 DEPl'=ELEC ( . RETSERV/Yl' COMP 10/01/7q BS OTllER 10/01/79 Cl/ 11.T 10)15,l?'l vs MOV 10/19/79 Cl/ 1/T () 10/23/79 FW MOV 10/24/79 R/l MOV 10/24/79 RH MOV 10/30}79 Sf{ MOV 10/.30/79 SW MOV 10/30/79 SW MOV 10/30/79 SW MOV DEPl TOTAL i'. (. ( UNIT2 (MAINTENANCE OF SAFETY RELATED DURING OUTAGE OR REDUCED POWER PER.WDS) MARKNO WKPERF SEAL BARRIER Pl' 24,11 FILLED ALL PENETRATIONS REPAIR 1/EAT TRACING ON RWST TANK REPLACED //EAT TAPE MOV11VSw200B MOV PMS PERFORMED PMS ON Mov .. .. ?.OOB CKT6A PNLq REPLACE CP.EMELEX WITH ECONOTRACE REPLACED HEAT TAPE MOV"SW"?.04C MOV PMS COMPLETED MOV AS PER PROCEDURE EMP .. P 1700 MOV PMf. PERFORMED FMS AS PER PROCEDURE EMPmC MOV*Rlf.12700 DIECONNECT AND RECONNECT FOR MECH D.U:CONNECT+RECONNEC.T FOR MECHANICS MOVwSWa204A MOV PMS COMPLETED PMS AS PER EMP"P"MOV.45 MOVwSW.,204B MOV PMS COMP.LF.:TED PMS AS PER EMP"P"M0Vw45 Mov .. sw.2os11 MOV PMS COMPLETED AS PER EMPwPwMOVw45 MOVwSWw205B MOV PMS COMPL1'/W AS PER EMP11Pt1MOV.,,45 u MR 2 qo1011322 2 'lO'l?.40730 2 901251426 2 q1010140B 2 'l0125152q 2 'l0125151'l 2 9071q1540 2 <l01251527 2 901251528 2 901251Sn 2 '101251532 TOTDI./NTM 1367 q5 385?. 'lB 5688 nn ?.28'l 6264 6264 6264 6264 *t'lttWa""°'

            • e I w N I

( Maintenance of Safety Related Systems During Outage ot Reduced Power Periods UNIT* /fl Instrument Maintenance DEVI'=INS'I' RETSEHVDT SYS COf.JP 10/01/79 GW IN8TR 10/01/79 GW INSTR 10/01/,79 PC RPI 10/02/79 BR INSTR 10/04/79 SI INSTR 10/.05/79 CIJ PIPING 10/09/79 BR INSTR 10/10/79 RC INSR 10/16/79 s.r INSTR 10/16/79 SI INSR 10/16/'/9 s.r INS'l'R 10/16/79 RS PIPING 10/1BJ79 BR VALVE 10/18}79 SI INSTR 10/.18/79 CH VALVE' 10/.22/79 RM MONITOR 10/24/79 CV INS1'R 10/.25/79 RC INSTR 10/25179 RC INSTR 10/25/79 PC ROD 10/25/.79 RP OTHER 10/25/79 RP OTHE'R DEFT TOTAL UNIT1 (MAINTENANCE OF SAFETY RELATIW SYSTEMS DURING OUTAGE OR REDUCED POWER PERWDS) MARKNO

SUMMARY

WKP1'.'RF u MR P1'nGW"102D C/11-:CK CALIBRATWN .TN 8PECS NO ADJUSTMENT 1 909082152 Cl/b'CK CALIBRA7'.WN ADJUSTED Zb'RO ON TRANSMITTER 1 909082153 REPLACE BENC//BOARD IND.fCATORS 118PLACED BENC/JBOARD IND.fCATORS+CALIB 1 909240840 FCVwBRn101D DOff NOT RESl'ONIJ

'l'O LEV1'.'L RE."'PONDS NOilMALLY 1 909231505 E'1dw9116 METER DOES NOT l/ESPOND PILLED+VEN'l'b'D 1.'RANSMI.TTER 1 910020602 LCVwCIJ.12008 AIR LINb' .rs CRIMPED REPLACED TUBING+FI1.'TINGS 1 910032310 TRwBR .. 120 CH8CK ACCURACY OF POIN'l' NUMBER 11 SYNC RECORDER 1 909301503 L1n459A CALIBRATE Lhl!59A TIG//Tr.:NED FITTING CALWRATED LT .. 1al!S 1 910062345

.!"1nh962 MC:.Tb'R DOES N07' RESPOND z.*.nu:D AND VE'N'l'ED TRANSMITTER 1 910020600 F1wh961 METER DOES NOT RESPOND FILLED AND VENEI) TRANSMITTER 1 910020601 Ft.rt.9S63 METER DOES NOT RESPOND F'.l"LLED AND Vk'N2'ED TRANSMITTER 1 910020603 PT-.RS.,1528 PIP.fNG BENT AND CRIMPED LINE NOT CRWPE'D JUST BENT RECONNECT 1 91013133lj LCVnBR,,100 VALVE W.fLL ONLY COME OPEN REPLACED ORIFICE PLUG ASBY .... --* --1 . 910122215 P.fw1941 GAGE MISS.fNG INSTALLED NEW GAUGE 1 910180800

//CVvCIJ .. 1460A WILL NO.T OPEN PROM CON'l'ROL RM CHECKED SAT, 1 910180915 R.fuRMSn153 NEEDLE STICKS CLEANED CONTACTS ON SWITCH ---1 910190300 PhCV11101A READS LOW CALIBRATED TRANSMITTER+AMPLIFIER 1 9102310l!5 F111J84 STEAM FLOW FEED FLOW MISMATCH REPLACED MULTIPLIER/DIVIDER 1 9102314l!O PT.,402 PRESS 'l'RANSMI.TTER INDICATION HI REPLACED TRANSMITTER

-** -*-------*1 ** 910240701 Nu9 ROD FAL TO MOVE OUT REPLACED SIGNAL CONDITIONING MODULE 1 910241135 ROD CONTROL SYS FAILS TO FUNCTION REPAIRED MODULES 1 910250750 C BANK NEEDS CALWRATWN OF INDICATORS REPLACED SIGNAL CONDITIONING MODULE-1 910250756 . ------TOTDWNTM 120 120 192 189 48 27 27 46 336 336 336 48 2l! 2 !i 70 28 2l! 24 2 1 5 W111WtfW1' 2010 0 (_) I) I ., \ . .J -*) ) .) . ) ' *.. .I I .J I *-' ' \ .... i ,_) \.) : ! ,.) ...........

-....... -**-

'. i , ,_)

( ( Maintenarice of Safety Related Systems During Outage or Reduced Power Periods UNIT #2 Instrument Maintenance



DEl'f';-..f NST UNIT2 (MAINTENANCE OF SAF'ETY RELATED SYSTEMS DURING OUTAGE OR RE:DUCED POWER PERIODS) RETSERVDT SYS COMP MARKNO

SUMMARY

WKPERF 10/04/.79 Cl/ INSTR 2.,C//uh1C OIL PRf:SS GAGE IS BROKE INSTALLED NEW GAUGE 10/04/79 cc .TNS'I'R CCvl'1u105C GAGE OPP AlJOU7' 20 PSI INS'I'Al,E'D NEW GAUGE 10/04/'19 C,'I JN.'.ITfl LT.cs.201 LWEL TRANSMU'Tl?R l!'AILl?D Rl!:STOJIED POWER 10)31/79 l?E INSTR LTwEEw100B LEVl!.'L INDICATION NOT WORKING C Lb'AN ED+ RE.'J!U.U:D MANOMETER DEPT 'I'OTAL u MR .TOTVWNTM 2 909300501 24 2 910010150 . 24 2 910020201 48 2 910072343 312 w*waa 408 ........ ---0 i) ) .) \ .i *e, ' \ .. ) \.) r i ) I i ,) I ' ! *. ) *******-*-*---**--*-*---*

\ ) HEALTH PHYSICS October:, 1979 There was no single release of radioactivity or radiation eA"Posure specifically associated with an outage that accounted for more than 10% of the allowable annual values in 10CFR20. J DEVIATIONS REVIEWED BY S -ON NUCLEAR SAf9 AND OPERATING COMMITTEE AFT *. 'IME LIMITS Number ST-64.4 Appendix B SPECIFIED IN TECHNICAL SPECIFICATIONS October, 1979 Unit Title Deviation

.1 RHR System Operability Clarity Reference Data This procedure was deviated September 18, 1979 and reviewed by the Station Nuclear Safety and Operating Committee October 8, 1979. ST-64.6 Appendix C 1 Refueling Testing of MOV-1373 & 1381 Change system.flow and normal conditions for RCS. This procedure was deviated September 19, 1979 and reviewed by the Station Nuclear Safety and Operating Connnittee October 8, 1979.