Corrected Page 3 of 19 to MOR for Apr 1997 for Surry Power Station Unit 1
ML18153A417
Person / Time
Site: Surry Dominion icon.png
Issue date: 04/30/1997
From: Mason D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153A415 List:
References
NUDOCS 9706180286
Download: ML18153A417 (2)


Text

I - -

I ATTACHMENT 2 CORRECTED PAGE April 1997

,- - 9706180286 970612 ',

I PDR ADOCK 05000280 ,

R PDR

'-_)

. l.,

OPERATING DATA REPORT

  • Surry Monthly Operating Report No. 97-04 Page 3 of 19 Docket No.: 50-280 Date: 05/01/97 Completed By: D. K. Mason Telephone: (804) 365-2459
1. Unit Name: ............................................................ Surry Unit 1
2. Reporting Period: ................................................. . April, 1997
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ......................... . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): ... . 840
7. Maximum Dependable Capacity (Net MWe): ....... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month YTD Cumulative

11. Hours In Reporting Period .............................. 719.0 2879.0 213503.0
12. Number of Hours Reactor Was Critical. .......... 19.2 1320.1 148154.8
13. Reactor Reserve Shutdown Hours ................. 0.0 0.0 3774.5
14. Hours Generator On-Line ............................... 0.0 1278.3 145809.3
15. Unit Reserve Shutdown Hours ....................... 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) ..... 0.0 3190453.6 341825897.4
17. Gross Electrical Energy Generated (MWH) .... 0.0 1065255.0 112038073.0
18. Net Electrical Energy Generated (MWH) ........ 0.0 1029190.0 106622939.0
19. Unit Service Factor ......................................... 0.0% 44.4% 68.3%
20. Unit Availability Factor .................................... 0.0% 44.4% 70.0%
21. Unit Capacity Factor (Using MDC Net) ........... 0.0% 44.6% 64.2%
22. Unit Capacity Factor (Using DER Net) ........... 0.0% 45.4% 63.4%
23. Unit Forced Outage Rate ................................ 0.0% 18.3% 15.2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up: 5/5/97
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION