ML18153A417
| ML18153A417 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/30/1997 |
| From: | Mason D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML18153A415 | List: |
| References | |
| NUDOCS 9706180286 | |
| Download: ML18153A417 (2) | |
Text
I -
I ATTACHMENT 2 CORRECTED PAGE April 1997 9706180286 970612 I
PDR ADOCK 05000280 R
'-_)
. l.,
OPERATING DATA REPORT Docket No.:
Date:
50-280 05/01/97 Surry Monthly Operating Report No. 97-04 Page 3 of 19 Completed By:
Telephone:
D. K. Mason (804) 365-2459
- 1.
Unit Name:............................................................
- 2.
Reporting Period:..................................................
- 3.
Licensed Thermal Power (MWt):..........................
- 4.
Nameplate Rating (Gross MWe):..........................
- 5.
Design Electrical Rating (Net MWe):....................
- 6.
Maximum Dependable Capacity (Gross MWe):....
- 7.
Maximum Dependable Capacity (Net MWe):........
Surry Unit 1 April, 1997 2546 847.5 788 840 801
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month YTD Cumulative
- 11.
Hours In Reporting Period..............................
719.0 2879.0 213503.0
- 12.
Number of Hours Reactor Was Critical...........
19.2 1320.1 148154.8
- 13.
Reactor Reserve Shutdown Hours.................
0.0 0.0 3774.5
- 14.
Hours Generator On-Line...............................
0.0 1278.3 145809.3
- 15.
Unit Reserve Shutdown Hours.......................
0.0 0.0 3736.2
- 16.
Gross Thermal Energy Generated (MWH).....
0.0 3190453.6 341825897.4
- 17. Gross Electrical Energy Generated (MWH)....
0.0 1065255.0 112038073.0
- 18.
Net Electrical Energy Generated (MWH)........
0.0 1029190.0 106622939.0
- 19.
Unit Service Factor.........................................
0.0%
44.4%
68.3%
- 20.
Unit Availability Factor....................................
0.0%
44.4%
70.0%
- 21.
Unit Capacity Factor (Using MDC Net)...........
0.0%
44.6%
64.2%
- 22.
Unit Capacity Factor (Using DER Net)...........
0.0%
45.4%
63.4%
- 23.
Unit Forced Outage Rate................................
0.0%
18.3%
15.2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
5/5/97
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION