ML18136A197
Jump to navigation
Jump to search
| ML18136A197 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/15/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Haller N NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML18136A198 | List: |
| References | |
| 937, NUDOCS 7911200367 | |
| Download: ML18136A197 (1) | |
Text
- =-::::------ - ---------
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA 23261 November 15, _1979 Mr. N. M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Haller:
Serial No. 9 37 PO/RMT:scj Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of October, 1979.
Very truly yours, z;§. )QIJ. "1'ite~e-"'c~
I C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)
Office of Inspection and Enforc.ement - Region II