,.l *,*

'1

  • e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 11, 1996 United States Nuclear Regulatory Commission Serial No.96-624 Attention: Document Control Desk NURPC Washington, D.C. 20555 Docket Nos. 50-280 50.:.281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 1996.

If you have any questions or require additional information, please contact us.

Very truly yours, S. P. Sarver, Acting Manager Nuclear Licensing and Operations Support Enclosure cc: U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323

,I Mr. R. A. Musser NRC Senior Resident Inspector =r: {2/3l.l-- I, Surry Power Station

/

9612240092 961130 PDR ADOCK 05000280 R PDR

,..I l

. \ . e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 96-11 Approved:

/'L--/o- 7b Station Manager Date

e Surry Monthly Operating Report No. 96-11

. Page 2 of 19 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1.................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 ........ :......................................................................................... 6 Average Daily Unit Power Level - Unit No. 1 ............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 ............................................................................................................. 8 Summary of Operating Experience - Unit No. 1 ......................................................................................................... 9 Summary of Operating Experience - Unit No. 2 ......................................................................................................... 9 Facility Changes That Did Not Require NRG Approval. ........................................................................................... 11 Procedure or Method of Operation Changes That Did Not Require NRG Approval. ................................................ 14 Tests and Experiments That Did Not Require NRG Approval. ................................................................................. 16 Chemistry Report ..................................................................................................................................................... 17 Fuel Handling - Unit No. 1 ........................................................................................................................................ 18 Fuel Handling - Unit No. 2 ........................................................................................................................................ 18 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 19

'.J e Surry Monthly Operating Report No. 96-11 Page3of19 OPERATING DATA REPORT Docket No.: 50-280 Date: 12-02-96 Completed By: D. K. Mason Telephone: {804) 365-2459

1. Unit Name: ........................................................... Surry Unit 1
2. Reporting Period: ................................................ . November, 1996
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month YTD Cumulative

11. Hours In Reporting Period ............................... 720.0 8040.0 209880.0
12. Number of Hours Reactor Was Critical ........... 720.0 8040.0 146090.7
13. Reactor Reserve Shutdown Hours .................. 0.0 0.0 3774.5
14. Hours Generator On-Line ................................ 720.0 8040.0 143787.0
15. Unit Reserve Shutdown Hours ........... :............ 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) ...... 1831836.9 20344832.7 336742625.2
17. Gross Electrical Energy Generated (MWH) ..... 613055.0 6762400.0 110339583.0
18. Net Electrical Energy Generated (MWH) ......... 592053.0 6527656.0 104983629.0
19. Unit Service Factor .......................................... 100.0% 100.0% 68.5%
20. Unit Availability Factor ..................................... 100.0% 100.0% 70.3%
21. Unit Capacity Factor (Using MDC Net) ............ 102.7% 101.4% 64.4%
22. Unit Capacity Factor (Using DER Net) ............ 104.4% 103.0% 63.5%
23. Unit Forced Outage Rate ................................ 0.0% 0.0% 15.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, March 6, 1997, 37 Days

25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e - Surry Monthly Operating Report No. 96-11 Page4of19 OPERATING DATA REPORT Docket No.: 50-281 Date: 12-02-96 Completed By: D. K. Mason Telephone: (804) 365-2459

1. Unit Name: ........................................................... Surry Unit 2
2. Reporting Period: ................................................ . November, 1996
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month YTD Cumulative

11. Hours In Reporting Period ............................... 720.0 8040.0 206760.0
12. Number of Hours Reactor Was Critical ........... 720.0 7070.2 142573.1
13. Reactor Reserve Shutdown Hours .................. 0.0 0.0 328.1
14. Hours Generator On-Line ................................ 720.0 7048.1 140604.2
15. Unit Reserve Shutdown Hours ........................ 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) ...... 1800857.2 17700808.0 330235862.0
17. Gross Electrical Energy Generated (MWH) ..... 605255.0 5879660.0 108035304.0
18. Net Electrical Energy Generated (MWH) ......... 584511.0 5680316.0 102790731.0
19. Unit Service Factor. ......................................... 100.0% 87.7% 68.0%
20. Unit Availability Factor. .................................... 100.0% 87.7% 68.0%
21. Unit Capacity Factor (Using MDC Net) ............ 101.4% 88.2% 63.7%
22. Unit Capacity Factor (Using DER Net) ............ 103.0% 89.7% 63.1%
23. Unit Forced Outage Rate ................................ 0.0% 1.8% 12.5%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Maintenance, December 12, 1996, 9 Days

25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 96-11

. Page 5 of 19 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November, 1996 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12-05-96 Completed by: M. J. Fanguy Telephone: (804) 365-2155 (1) (2) (3) (4) (5)

Method Duration of LER System Component Cause & Corrective Action to Date Type Hours Reason Shutting No. Code Code Prevent Recurrence Down Rx None During the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A Equipment Failure (Explain) 1 - Manual 8 Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 96-11 Page 6 of 19 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: November, 1996 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 12-05-96 Completed by: M. J. Fanguy Telephone: (804) 365-2155 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action to Date Type Hours Reason Shutting Code Code Prevent Recurrence Down Rx 11/19/96 S NA B NA NA TA V Reduce Power to perform 2-0SP-TM-001.

11/19/96 F NA B NA NA SB V Reduce power to <50% due to "D" reheat stop valve problems during 2-0SP-TM-001.

11/25/96 S NA B NA NA TA V Reduce power to perform 2-0SP-TM-001.

11/25/96 F NA B NA NA SB V Reduce power to <50% due to "B" intercept valve not reopening during 2-0SP-TM-001.

(1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

e Surry Monthly Operating Report No. 96-11 Page 7 of 19 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 12-05-96 Completed by: J. D. Kilmer Telephone: (804) 365-2792 MONTH: November, 1996 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 819 17 824 2 823 18 823 3 823 19 823 4 824 20 823 5 822 21 824 6 822 22 824 7 819 23 823 8 822 24 824 9 822 25 823 10 822 26 819 11 822 27 823 12 822 28 823 13 823 29 823 14 818 30 822 15 819 16 823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e

  • Surry Monthly Operating Report No. 96-11 Page 8 of 19 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 12-05-96 Completed by: John D. Kilmer Telephone: (804) 365-2792 MONTH: November, 1996 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 1 825 17 828 2 826 18 827 3 826 19 642 4 826 20 768 5 826 21 827 6 826 22 827 7 827 23 827 8 825 24 828 9 826 25 654 10 827 26 819 11 828 27 823 12 827 28 822 13 827 29 821 14 825 30 820 15 828 16 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 96-11 Page 9 of 19

SUMMARY

OF OPERATING EXPERIENCE MONTH/VEAR: November, 1996 The following chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

11/01/96 0000

  • The reporting period began with the unit ramping up with power at 93.5% power, 803 MWe.

0332 Stopped power increase at 100%, 855 MWe.

11/07/96 1804 Start power reduction to switch to IMP-IN.

1856 Stopped power reduction at 98%, 840 MWe.

1930 Started power increase after switching to IMP-IN.

2016 Stopped power increase at 100%, 855 MWe.

11/09/96 0931 Start power reduction to switch to IMP-OUT.

0947 Stopped power reduction at 98%, 841 MWe; Started power increase after switching to IMP-OUT.

0957 Stopped power increase at 100%, 856 MWe.

11/30/96 2400 The reporting period ended with the unit operating at 100% power, 850 MWe.

UNIT Two:

11/01/96 0000 The reporting period began with the unit operating at 100% power, 860 MWe.

11/19/96 1000 Start power reduction to perform 2-0SP-TM-001.

1109 Stopped power reduction at 91 %, 790 MWe.

1256 Start power reduction for reheat and intercept valve testing.

1432 Stopped power reduction at 71 %, 618 MWe.

1521 Start power reduction due to problems with "D" reheat valve.

1545 Stopped power reduction at 49%, 400 MWe.

- Surry Monthly Operating Report No. 96-11 Page10of19

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR: November, 1996 11/20/96 0101 Started power increase.

0216 Stopped power increase at 70%, 615 MWe to perform 2-0PT-RX-001.

0244 Started power increase.

0722 Stopped power increase at 100%, 855 MWe.

11/25/96 1021 Start power reduction to perform 2-0SP-TM-001.

1103 Stopped power reduction at 91 %, 784 MWe.

1117 Start power reduction due to problems with No. 2 governor valve oscillations.

1422 Stopped power reduction at 74%, 642 MWe.

1522 Start power reduction due to problems with "B" intercept valve not re-opening.

1535 Stopped power reduction at 71%, 606 MWe for IRPI adjustment.

1540 Start power reduction.

1716 Stopped power reduction at 49%, 385 MWe.

2155 Started power increase.

11/26/96 0123 Stopped power increase at 95%, 820 MWe to switch to IMP-OUT.

.0213 Started power increase.

0259 Stopped power increase at 100%, 855 MWe.

11/27/96 1038 Start power reduction due to computer calorimetric indication of > 100% power.

1210 Computer calorimetric determined to be inoperable due to a failed Feedwater RTD; manual calorimetric used.

11/30/96 2400 The reporting period ended with the unit operating at 99% power, 850 MWe.

- e Surry Monthly Operating Report No. 96-11 Page 11 of 19 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: November, 1996 TM S1 0018 Temporary Modification 11-7-96 (Safety Evaluation No.96-140)

The purpose of this Temporary Modification is to perform troubleshooting on the Unit 1 Main Generator 230KV Leads Pilot Wire Protection Circuit. The troubleshooting will determine why the Pilot Wire Ammeter indicates current with the associated Selector Switch in Normal and to correct this condition, if possible.

An unreviewed safety question does not exist. The Surry Power Generation System is non-safety related. Sufficient protective relaying will remain in service while primary relaying is disabled.

TM S1-96-0019 Temporary Modification 11-13-96 (Safety Evaluation No.96-141)

This Temporary Modification is to replace test switch 1-SI-CS-FC-494-TA in the Unit 1 train "A" of the Safety Injection (SI) system. All work performed will be in the train "A" portion of the SI system only. Train "B" will remain unaffected and will function as designed at all times. With the jumper installed, train "A" of the SI system will provide all of it's manual and automatic functions.

The test switch replacement is a like-for-like replacement with no change to the design of the system or any station isolation. During the time of switch replacement both trains of SI will function as designed. Therefore, an unreviewed safety question does not exist.

SE 96-095 Rev.4 Safety Evaluation 11-14-96 Safety Evaluation 96-095, Rev. 4, was revised to evaluate the in leakage of hydrogen gas into the pressurizer relief tank (PRT). The in leakage of hydrogen displaces the nitrogen blanket normally present in the PRT.

There are no sources of oxygen to the PRT. This eliminates the possibility of an explosive atmosphere developing in the PRT. Additionally, the previous installation of the Temporary Modification will maintain the PRT at a positive pressure, prohibiting the influx of air. Therefore, an unreviewed safety question does not exist.

FS 96-50 Updated Final Safety Analysis Report Change 11-14-96 (Safety Evaluation 96-142)

This UFSAR change revises Section 9.1.2.4, "Reactor Makeup Control," to correct an invalid description of component operation, describe actual design performance, and expand on the described method of operation.

There are no changes to plant equipment or to methods of operation as described in approved operating procedures. Therefore, an unreviewed safety question is not created.

,,*J e e Surry Monthly Operating Report No. 96-11

. Page 12 of 19 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: November, 1996 FS 96-27 Updated Final Safety Analysis Report Change 11-21-96 (Safety Evaluation 96-144)

Currently, the UFSAR states that pressure-relieving devices in the Safety Injection System located outside containment that circulate radioactive water under accident conditions discharge to a closed system. Section 6 of the UFSAR is being revised to reflect actual plant configuration by changing the words "closed system" to "Liquid Waste Disposal System."

During normal operation, opening of the relief valve results in no significant radiological consequences. If the relief valve lifts during accident conditions, highly radioactive water would be released into a partially open sump. However, the resulting offsite dose would not exceed 10 CFR 100 limits. Therefore, an unreviewed safety question does not exist.

FS 96-46 Updated Final Safety Analysis Report Change 11-21-96 (Safety Evaluation 96-145)

Testing of the Safety Injection System is not performed as described in the UFSAR. The UFSAR currently states that the test is performed by injecting a test signal and verifying component actuation in the same test. The change to the UFSAR will depict how the tests are actually performed. The Safety Systems are tested by a series of tests which test portions of each system.

The performance of a series of tests fully satisfies the Technical Specifications and the testing as required by the UFSAR. Therefore, an unreviewed safety question does not exist.

Appendix R Report Technical Report 11-21-96 (Safety Evaluation No.96-146)

This evaluation is being performed to assess the 1996 update of the Surry 10CFR50 Appendix R Report. It incorporates DCPs completed May 1995 through September 1996, and information concerning other station changes as they pertain to Appendix R.

New engineering evaluations were added that address fire barriers and penetration seals. Changes to Appendix R exemption requests were performed to reflect current plant configurations. The report was also revised to incorporate a new method to track combustibles at the station.

The level of fire protection for the station is not being diminished, and the changes will not adversely affect the capacity to achieve and maintain safe shutdown in the event of a fire. Therefore, an unreviewed safety question does not exist.

e Surry Monthly Operating Report No. 96-11 Page 13 of 19 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: November, 1996 1(2)-0SP-TM-001 Temporary Modification

. (Safety Evaluation No.96-148)

This Temporary Modification will evaluate the, use of an alternate power supply to energize the test solenoid valves used to close the Intercept and Reheat Stop Valves if the test circuitry is not working properly.

Nuclear Analysis and Fuel has previously reviewed the potential failure of the turbine control system as referenced in Engineering Transmittal NAF-95010. Should the valve limiter fail, the resultant load increase is bounded by the current safety analyses. The transmittal states that the physical limit on steam flow through the governor valves full open (105.5%) is bounded by the analyzed step load increase safety analysis limit (116%). Should a step load decrease occur, plant response would be within current design requirements and the reactor protection system would function as required.

Therefore, an unreviewed safety question does not exist.

FS 96-45 Updated Final Safety Analysis Report Change 11-25-96 (Safety Evaluation 96-149)

UFSAR Change Request 96-45 revises the Manual SI Block Reference value on UFSAR page 7.5-2 from 2000 PSIA to 2000 PSIG. This change is being made for consistency with Technical Specification 3.7 and the plant's Design Basis Documents.

The 2000 PSI manual block is not one of the key parameters required for the system to fulfill its safety related function described in UFSAR chapter 14. Accident conditions are assumed to initiate from a nominal pressure of 2250 PSIA. Therefore, an unreviewed safety question does not exist.

e e Surry Monthly Operating Report No. 96-11 Page 14 of 19 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: November, 1996 1[2]-CSP-HRS-003 Chemistry Surveillance Procedures 11-7-96 CH-41(42).110 (Safety Evaluation No.96-005 Rev.1)

CH-41(42).310 Chemistry Surveillance Procedures 1[2]-CSP-HRS-003, "High Radiation Sampling System: Sampling Containment Air Chemistry Test and Operator Training," CH-41(42).110, "Post Accident High Radiation Sampling System," and CH-41 (42).310 "High Radiation Sampling System: Sampling Containment Air," were revised to provide instructions for administratively controlling specific containment isolation valves while performing the subject procedure.

The specified containment isolation valves are required to be closed to maintain post accident containment integrity. The administrative controls provided by this change allow the valves to be opened during testing while ensuring compliance with the Technical Specifications. Therefore, an unreviewed safety question does not exist.

1(2)-MOP-IA-003 Maintenance Operating Procedure 11-14-96 (Safety Evaluation No.96-143)

Maintenance Operating Procedure 1(2)-MOP-IA-003, "Pressurizer PORV Air Bottle Changeout," provides instructions for replacement of backup air bottles after the air pressure in those bottles has been depleted. The normal Containment Instrument Air System or the Turbine Building Instrument Air System will be available during this evoiution and system availability is listed as an initial condition.

Although normal Instrument Air supply is available and the Pressurized Power Operated Relief Valve can be cycled, that PORV will be technically inoperable during the brief period that the backup bottled air supply is being valved out and the spare bottles are being valved in. The time restrictions contained in Technical Specification 3.1.A.6 and 3.1.G.2 will be fully met. Therefore , an unreviewed safety question does not exist.

2-TMOP-Rl-3034 Temporary Maintenance Operating Procedure 11-21-96 (Safety Evaluation No.96-147)

Temporary Maintenance Operating Procedure 2-TMOP-Rl-3034,"Removal and Return to Service of Annunicator Panel 2G," was developed to provide instructions for increased monitoring and compensatory measures required while the Unit 2 annunicator "G" panel is removed from service for maintenance.

The Unit 2 Main Control Room annunicator "G" panel will be taken out of service to allow maintenance to be performed on annunicator panel connector plugs in accordance with a work order. Maintenance will be performed when the unit is in cold shutdown. Therefore, an unreviewed safety question does not exist.

' e Surry Monthly Operating Report No. 96-11 Page 15 of 19 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: November,* 1996 SE 95-154, Rev. 1 Safety Evaluation 11-27-96 Safety Evaluation 95-154 Rev.1 was performed to evaluate Unit 2 operation with pressurizer spray control valve 2-RC-PCV-2455A maintained in a fully closed position.

The evaluation concluded that operation with one pressurizer spray valve closed and disabled will not invalidate any of the UFSAR Chapter 14 safety analyses. Therefore, an unreviewed safety question does not exist.

e Surry Monthly Operating Report

. No .. 96-11 Page 16 of 19 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: November, 1996 None During the Reporting Period

1 ,' (

e e Surry Monthly Operating Report No. 96-11 Page 17 of 19 CHEMISTRY REPORT MONTHNEAR: November, 1996 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ.

Gross Radioactivity, µCi/ml 9.02E-1 5.01 E-1 6.72E-1 1.89E-1 9.77E-2 1.38E-1 Suspended Solids, ppm - - - - - -

Gross Tritium, µCi/ml 3.43E-1 3.22E-1 3.33E-1 7.69E-1 6.23E-1 7.05E-1 1131, µCi/ml 3.25E-2 7.41 E-3 1.18E-2 1.71 E-4 2.76E-5 5.17E-5 113111133 0.52 0.40 0.46 0.10 0.06 0.08 HvdroQen, cc/kg 39.2 36.0 38.1 31.2 27.5 29.8 Lithium, ppm 2.25 1.66 1.98 2.34 2.06 2.18 Boron - 10, ppm* 70.6 48.0 57.3 218.5 203.6 211.3 Oxygen, (DO), ppm  ::;0.005  ::;0.005  ::;0.005 ::;0.005  ::;0.005  ::;0.005 Chloride, ppm 0.003 <0.001 0.002 0.005 0.003 0.004 pH at 25 dearee Celsius 7.11 6.55 6.94 6.31 6.09 6.20 Boron - 10 = Total Boron x 0.196 Comments:

None

e e Surry Monthly Operating Report No. 96-11 Page 18 of 19 FUEL HANDLING UNITS 1 & 2 MONTHNEAR: November, 1996 New or Spent Number of New or Spent Fuel Shipment Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Number Received per Shipment Number Number Enrichment Cask Activity New Fuel Unit 1 Batch 17 11/05/96 12 59B LM13V2 4.0099 14.94 Ci Shipment 5 37B LM13UE 3.9968 35B LM13UC 4.0057 38B LM13UF 4.0095 15B LM13TS 3.8087 21B LM13TY 3.8162 52B LM13UV 4.0181 16B LM13TT 3.8152 40B LM13UH 3.9990 41B LM13UJ 4.0014 17B LM13TU 3.8043 36B LM13UD 3.9964

.[

lturry Monthly Operating Report No. 96-11 Page 19 of 19 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: November, 1996 None During the Reporting Period