ML17285A904

From kanterella
Revision as of 21:54, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1989 for WNP-2.W/891206 Ltr
ML17285A904
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1989
From: HUTCHISON L B, POWERS C M
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912210126
Download: ML17285A904 (8)


Text

ACCELERATED DI UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)

ACCESSION NBR:8912210126 DOC.D NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397 R

SUBJECT:

Monthly operating rept for Nov 1989 for WNP-2./891206 l r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report'(per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1 1.A D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 PRPB11 REG FI 01 EXTERNAL EG&G S IMPSON g F NRC PDR 10 10 l,l 1 1 1 1 1 1 1 1'1 AEOD/DOA~'1 IRM TECH ADV 2 2 NRR/DOEA/OEABll," 1 1 NUDOCS-ABSTRACT 1'RGN5 1'LPDR NSIC D D NOTE TO ALL"RIDS" RECIPIENTS:

A D D PLEASE HELP, US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

~(r~,~l~~s~~~~"'i 4 l i'f 1 g I'i i/~-'f~ii i g-~"~e<if'<j~l I h g pl~S WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 December, 6;1989 U.S.Nuclear, Regulatory Comission Document Control Desk Washington; D.C.20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, November, 1989 as required by our, Technical Specifications 6.9.1.6.Very Truly Yours, C.M.Powers (M/D 927M)WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,.Mr,.Ms.Mr,.Mr..J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI;Farmington CT INPO NRC;Washington D.C.8912210126 S91130 PDR ADOCK 05000397 R PDC-

<'~

AEPCAT PEAIOO November1989 month, year$>i>.t>nE~>-TU>n~~Gism>Ts&liU None LNIT SIIUTDOl'INS

/AEOUCTIONS Yll llRST~h DOCKET NO.lNIT I'IRI 1E llNP-2 ORTE 12/1/89 COMPLETED QY Le Hutchison TELEPIIONE (509)377-2486;C IOt PAF E ACIN C~: SUhWlNY lINP-2 Operated routinely during November with no outages or significant power reductions

~: F-Forced S-Scllcd R-Equip Failure 0-Maint or Test~C-Ae f ue ling O-AeOulatory Aestriction E-Operator Training I License Examination F-Rdmin G-Oper Error H-Other l-Manual 2-Manual Scrain 3-Iluto Scram 4-Continued 6 Aeduced Load 9-OI:her SYSTEM h COMPOhCNT Exhibit F h H Instructions for Preparation of'-Data Entry Sheet Licensee Event Aepnrt (LEA)File (NUAEG-0161)

OPERATING DATA REPORT WNP-2 01-Dec-89 1.DOCKET: 50-397 2.REPORTING PERIOD: 3.UTILITY CONTACT: Nov-89 OUTAGE+ON-LINE HOURS LEONARD HUTCHXSON (509)377-2486 720 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRXCAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9~I F CHANGES OCCUR ABOVE S I NCE LAST REPORT i G I VE REASONS None 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: None 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRXTICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNXT SERVXCE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACXTY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 720 720.0 0.0 720.0 0.0 2332340 780990 755603 100.0~o 100'+o 95.8>o 95.4~o 0.04 0.0 YEAR CUMULATIVE 8016 43520.2 6113.7 32331.3 0.0 340.4 5939.4 31103.9 0.0 381.7 16840250 85951455 5565030 28598530 5337830 27506138 74'~o 71 5+o 74ol~o 72'~o 60'~o 57 7~o 60'+o 57 5~o 4.9%8.8~o 304.6 2996.2 2 6~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)REFUELING OUTAGE 4 13 90 for 45 DAYS 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~~I AGE DAILY UNIT POWER LEVEL DOCKET NO.WNP-2 DATE 12/1/89 COMPLETED BY LB.Hutchison t 10NTH NOVEMBER 1989 TELEPHONE (509)377-2486 2.3.4, 5.6.7.8.9.10.12.13.14.15.16.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)1082 1086 1056 1042 1079 1023 1048 996 950 876 870 1061 1063 1075 1079 17.18.19.20.21.22.23.24.25.26.27.28.29~30.31.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)1076 1079 1075 1077 1082 1079 1045 1065 1079 1083 1083 1085 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'ine (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

"p