Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17292B2471998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2.W/980212 Ltr ML17292B2151997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for WNP-2.W/980115 Ltr ML17292B1341997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr ML17292B1101997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr ML17292B0851997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2.W/971010 Ltr ML17292B0511997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for WNP-2.W/970911 Ltr ML17292A9611997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2.W/970807 Ltr ML17292A9331997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr ML17292A8971997-05-31031 May 1997 Monthly Operating Rept for May 1997 for WNP-2 ML17292A8531997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for WNP-2 ML17292A8561997-03-31031 March 1997 Corrected MOR for Mar 1997 for WNP-2 ML17292A8171997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for WNP-2.W/970411 Ltr ML17292A7391997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for WNP-2.W/970313 Ltr ML17292A7011997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr ML17292A6631996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for WNP-2.W/970109 Ltr ML17292A6311996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for WNP-2.W/961210 Ltr ML17292A5921996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr ML17292A5371996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for WNP-2.W/961009 Ltr ML17292A4761996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for WNP-2. W/960912 Ltr ML17292A4071996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for WNP-2.W/960807 Ltr ML17292A3611996-06-30030 June 1996 Monthly Operating Rept for June 1996 for WNP-2.W/960712 Ltr ML17292A3191996-05-31031 May 1996 Monthly Operating Rept for May 1996 for WNP-2.W/960610 Ltr ML17292A2671996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr ML17291B2961996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for WNP-2.W/960410 Ltr ML17291B2631996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr ML17291B2291996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Wnp Unit 2.W/960209 Ltr ML17291B1941995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr ML17291B1541995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for WNP-2.W/951207 Ltr ML17291B1071995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for WNP-2.W/951110 Ltr ML17291B0731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for WNP-2.W/951009 Ltr ML17291B0131995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for WNP-2.W/950911 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
seem,mam oonmmx orsx m"row svsxmr Ci~REGULA INFORMATION DISTRIBUTI YSTEM (RIDS)ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED:
NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL: EG6G BRYCE,J.H NSIC COPIES LTTR ENCZ 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR DORS/OEAB EG FIL 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
I'LEASE HELP US'fO REDUCE WASTE!CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 1 aw (q., s, t'0~'sn I'I vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 G02-93-059 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555
Dear Sir:
Subject:
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.Very truly ours, J.W.Baker WNP-2 Plant Manager (MD 927M)LBH/hh cc: Mr.Mr.Ms.Mr.Mr.Mr.W;: H.Lovelace, NRC, Washington, DC J.B.Martin, NRC Region V Dottie Sherman, ANI, Farmington, CT R.C.Barr, NRC Resident Inspector (901A)J.T.Wheelock, INPO F.Yost, Utility Data Institute tgyta I~9303i90385 930228,'PDR ADOCK 05000397 R'-'"-.PDR 4 g*wj 1 P I', N.4 fl,lt~., l'I~
OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE+ON-LINE HOURS: 672 3.UTILITY CONTACT: Leonard Hutchison (509)377-2486 4 5.6.7.8.9.LICENSED THERMAL POWER (MWt)'AMEPLATE RATING (GROSS MWe): DESIGN ELECTRICAL RATING (NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY (NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE 3323 1200.9 1120 1165 1112 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): REASONS FOR RESTRICTIONS, IF ANY: N NE 12.13.14.15.16.17.18.19.20.21.22.23.24.25.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (he<)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (MDC NET)UNIT CAPACITY FACTOR (DER NET)UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 672.0 435.9 0.0 386.5 0.0 1,057,089 361,160 339,012 57.5%57.5%45.4%45.0%33,3%192.8 YEAR 1,416.0 968.3 0.0 878.3 0.0 2,668,613 924,470 873,977 62.0%62.0%55.5%55.1%30.9%392.5 CUMULATIVE 71,984.2 50,116.9 340.4 48,186.0 381.7 139,833,263 46,773,560 44,824,396 66.9%67.5%56.9%56.6%13.7%7,665.8 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION: REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
0 I ,)I I-DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8;1993 COMPLETED BY: LB HUTCHISON TELEPHONE:
(509)377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO.DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE&CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B 9344 2/06/93 F 32.42 A 93%5 2/10/93 F 160.38 A N/A HA Turbine 93~CB Pumpxx 93-007 CH Pumpxx Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown.After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems.After valves were repaired, the plant was returned to service.Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise)in the pump control circuitry.
Reactor automatically scrammed on low level due to loss of reactor feedwater pump.The cause of failure was an electric coil in the feed pump governor control circuitry.
After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems.After compl of assessment, the plant was returned to service.
SUMMARY
- F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM&COMPONENT EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG-0161)
'4 lt~~LWW-4 A C
~4+f~~0 AVERAGE DAILY VNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
50-397 WNP-2 FEBRUARY, 1993 LB HUTCHISON (509)377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILY POWER LEVEL (M We-NET)DAY'AVERAGE DAILY POWER LEVEL (MWe-NET)&2 17.102 2.18.823 3.19.1078 4.20.1075 5.6.72 21.I 22.1110 7.27 23.1106 8.24.9.948 1113 10.o 657 26.1091 27.1103 12, 28.1108 13.14.15.16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATT.THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET , SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.