UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 21, 2019 Susquehanna Nuclear, LLC FACILITY:
Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 7, 2018, PRE-SUBMITTAL MEETING WITH SUSQUEHANNA NUCLEAR, LLC TO DISCUSS A POTENTIAL LICENSE AMENDMENT REQUEST RE: USE OF ATRIUM 11 FUEL (EPID L-2019-LRM-0022)
On May 7, 2019, a pre-submittal meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Susquehanna Nuclear, LLC (Susquehanna or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss a proposed license amendment request to allow the use of Atrium 11 fuel for the Susquehanna Steam Electric Station, Units 1 and 2. The licensee's presentation material can be found in the Agencywide Documents Access and Management System at Accession No. ML 19099A016.
During the meeting, the licensee presented information regarding the schedule to submit, review, and approve the license amendment request. Specifically, Susquehanna plans to submit a license amendment request to revise the list of approved methodologies in Technical Specification 5.6.5, "Reporting Requirements
-Core Operating Limits Report (COLR)," to reference Advanced Framatome Methodologies in order to support loading of Framatome Atrium 11 fuel in 2021 and 2022, respectively.
Staff focused discussion on the transition to advanced Framatome methodologies, including adopting Technical Specifications Task Force (TSTF) Traveler TSTF-535, "Revise Shutdown Margin Definition to Address Advanced Fuel Designs," and removal of two analysis penalties that are no longer applicable.
Questions from the U.S. Nuclear Regulatory Commission (NRC) staff concentrated on:
- Differences between the Atrium 10 fuel currently in use at Susquehanna and the Atrium 11 fuel the licensee plans to use going forward. The questions specifically concentrated on debris protection features and thermal hydraulic properties of the new fuel compared to the existing fuel.
- How Susquehanna and Framatome intend to model the cores. The analyses prepared for the amendment will use an equilibrium cycle of only Atrium 11 fuel. The reload specific analyses, which will be submitted to the NRC for information during the application process as they become available, will document the behavior of the mixed cores (i.e., fresh Atrium 11 and once-or twice-burned Atrium 10).
- Changes to the fuel property models used in the stability method currently employed by Susquehanna and their comparison to the fuel property models used in the application for advanced Framatome methodologies the NRC currently has under review (Brunswick Steam Electric Plant).
- Impacts on accident analyses, specifically, dose consequences thereof. A list of attendees is enclosed.
No regulatory decisions were made during the meeting. Please direct any inquiries to me at (301) 415-2328 or Jennifer.
Tobin@nrc.gov.
Docket Nos. 50-387 and 50-388
Enclosure:
List of Attendees cc: Listserv Sincerely, 2~bin, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES MAY 15, 2018, CLOSED PRE-SUBMITTAL MEETING WITH SUSQUEHANNA NUCLEAR, LLC TO DISCUSS A POTENTIAL LICENSE AMENDMENT REQUEST RE: USE OF ATRIUM 11 FUEL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 Name Oraanization Reed Anzalone U.S. Nuclear Requlatorv Commission (NRC) Robert Beaton NRC Jenny Tobin NRC Mohammad Razzaque NRC Joshua Wilson NRC John Parillo NRC Ashley Smith* NRC Kevin Heller NRC Melisa Krick Susquehanna Nuclear, LLC (Susquehanna)
Jason Hartzell Susquehanna William Kahler Susquehanna Chris Hoffman Susquehanna Shane Jurek* Susquehanna Ron Vasquies*
Susquehanna Michael Anderson*
Roland DeSteese Framatome Ralph Grummer* Consultant to Framatome Dirk Howlett Framatome Corey Long Framatome Dang Patachana*
Framatome Kevin Quick Framatome Dan Tinkler Framatome
- by telephone Enclosure
SUBJECT:
SUMMARY
OF MAY 7, 2018, PRE-SUBMITTAL MEETING WITH SUSQUEHANNA NUCLEAR, LLC TO DISCUSS A POTENTIAL LICENSE AMENDMENT REQUEST RE: USE OF ATRIUM 11 FUEL (EPID L-2019-LRM-0022)
DATED MAY 21, 2019 DISTRIBUTION:
Public PM File Copy RidsNrrDorlLpl1 RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsNrrDssStsb Resource RidsNrrDssSrxb Resource RidsNrrDmlrMvib Resource RidsNrrLALRonewicz RidsNrrPMSusquehanna JJohnston, NRR JQuichocho, OEDO MMCcCoppin, OEDO RAnzalone, NRR RBeaton, NRR KHeller, NRR JParillo, NRR MRazzaque, NRR JWilson, NRR ASmith, NRR ADAMS A ccess1on N ML 19134A029 o.: OFFICE DORL/LPL 1 /PM DORL/LPL 1 /LA DORL/LPL 1 /BC NAME JTobin LRonewicz JDanna DATE 05/15/2019 05/15/2019 05/21/2019 OFFICIAL RECORD COPY *b ,ye-ma, DORL/LPL 1 /PM JTobin 05/21/2019