Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
Pair'~(ROCHESTER GAS%%3 ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUiSER GlNNA STAT1GN UNlT ff CQI)PLET-D OATE::-TlhtE':--PROCEDURE NO.-37 5 REV.NO.CONTAINMEÃZ RECIRCULATION FANS~iIASS AIR FLOW CHEK TECHNICAL REVIEW (PORC 3-24-80 QC REVIEW APPROVED FOR USE PLAil UPERINTENDENT qA X NON-QA CATEGORY 1.0 REVIEWED BY:/THIS PROCEDUPZ CQiNTAINS 1O PAGES
(PT-37.5 CONTAIRKNT RECIRCULATION FANS HASS AIR PLO'rl CHiCK PT-37.5:1 1.0 PURPOSE: To determine total air flow through Containment Recirculation Pans.2.0 TEST REQUIRE>lENTS:
2.1 Determine
mass air flow of each containment recirculation fan during nornal operation and"A" g"C" fans during accident operation.
3.0 REFERENCES
3.1 Tech.Specs.Section 4.5.2.3.4.0 INITIAL CONDITIONS:
4.1 Ensure
that all fans except that fan undergoing the flow check, are not operating.
This procedure is divided into 6 sections.Indicate which sections were used and mark remainder N/A.4.2.1"A" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.2"A" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.3"8" Containment Recirculation Fan Normal Conditions Hass Air Plow Check.'4.2.4"C" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.5"C" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.6"D" Containment Recirculation Fan Normal Conditions Hass Air Flow Check., 4.3 Test personnel are qualified in accordance with A-1102.5.0 , 5.1 PRECAUTIONS:
Normal company safety precautions will be observed./
PT-37.5:2 (4l INSTRUCTIONS: "A" Containment Recirculation Fan Normal Conditions Mass Air Flow Check: 6.1.1 Ensure that only the"A" Containment Recirculation Fan is running, 6.1.2 Ensure that normal loop entry damper 1 F-LED (5873)is open.6.1.3 Insert Pitot Tube and position end into air flow.6.1.4 Record air flow measurements at points indicated on data sheet.6'.5 Perform calculations for total air flow.6.2"A" Containment Recirculation-Fan Accident Conditions Mass Air Flow Check: 6.2.1 Ensure that only the"A" Containment Recirculation Fan is running.6.2;2 Press in armature button of CF1A/L relay in Relay Racks (latch in type relay), verify the following:
6.2.2.1 1F-LED damper (58?3)assumes its fully closed position.(6.2.2.2 lI-CID damper (5871)assumes its fully open position.6.2.2.3 lK-COD damper (5872)assumes its fully open position.6.2.2.4 Green indicating light (at M.C.B.)for charcoal dampers is extinguished.'.2.3 Insert Pitot Tube and position end into air flow.6.2.4 6.2.5 6.2.6 Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow.Return"A" Containment Recirculation Fan Dampers to their normal position by pressing in.reset push button and verify the following:
6.2.6.1 1F-LED damper (5873)assumes its fully open position.6.2.6.2 1I-CID damper (5871)assumes its fully closed position.6.2.6.3 1K-COD damper (5872)assumes its fully closed position.6.2.6.4 6.3 Green indicating light (at M.C.B.)for charcoal dampers is illuminated."B" Containment Recirculation Fan Normal Conditions Mass Air Flow Check:
PT-37.5:3 6.3.1 Ensure that only the"B" Containment Recirculation Pan is running.6.3.2 6.3.3 6.3.4 6.3.5 Ensure that normal loop entry damper 1G-LED is open.Insert Pitot Tube and position end.into air flow.Record air flow measureme'ats at points indicated on data sheet.Perform calculations for total air flow.6.4"C" Containment Recirculation Pan Normal Conditions Mass Air Plov Check:6.4.1 6.4.2 6.4.3 6.4.4 6.4.5 6.s 6.5.1 6.5.2 Ensure that only the"C" Containment Recirculation Fan is zunning.Ensure that normal loop entry damper 1H-LED (5875)is open.Insert Pitot Tube and position end into air flow.Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow."C" Containment Recirculation Pan Accident Conditions Mass Air Plow Check: Ensure that only the"C" Containment Recirculation Pan is running.Press in armature button of CF1C/L relay in Relay Racks (latch in type relay), verify the fo3;lowing:
6.5.2.1 1H-LED damper (5875)assumes its fully closed position.6.5.2.2 1J-CID damper (5876)assumes its fully open position.6'.2.3 6.5.2.4 6.5.3 6.5.4 6.s.s 6.5.6 1L-COD damper (5874)assumes its fully open position.Green indicating light (at M.C.B.)for charcoal dampers is extinguished.
Insert pitot tube and position end into air flov.Record air flov measurements at points indicated on data sheet.Perform calculations for total air flow.Return"C" Containment Recirculation Fan Dampers to their normal position by pressing in reset push buttong and verify the folloving:
6.5.6.1 1H-LED damper (5875)assumes its fully open position.6.5.6.2 1J-CID damper (5876)assumes its fully closed position.
PT-37.5:4 (6.5.6.3 1L-COD damper (5874)assumes its fully closed position.6.5.6.4 Green indicating light (at M.C.B.)for charcoal dampers is illuminated.
6.6"D" Containment Recirculation Fan Normal Conditions Mass Air Plow Check: 6.6.1 6.6.2 6.6.3 6.6.4 6.6.5 Ensure that only the"D" Containment Recirculation Pan is running.Ensure that normal loop entry damper 1E-LED is open.Insert Pitot Tube and position end into air flow.r Record air flow measurements at points indicated on data skeet.Perform calculations for total air flow.J'OMPLETED BY: DATE COMPLETED:
SHIFT SUPERVISOR:
RESULTS AND TEST REVIEW: DATE:
"PT-37.5:5"A" CONTAIRKNT RECIRCULATION FAN NORMAL CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRA RSE j 1 N2 r Tot.Traverse jul Tot.Traverse jf2 Total 10 10 ave traverse jul=ave.traverse g2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 j in V=2g (dP)=(64.4 ft/sec)(e,.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 2 jj'/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COIRKNTS: PERFORMED BY:=DATE:
"A" CONTAI%1ENT RECRCULATION FAN ACCIDENT CONDITIONS HASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE Tot.Traverse/Pl 10 Tot.Traverse/j2 10 Total ave.traverse/jl=ave.traverse jj2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in 2g (dZ)=(64.4 ft/sec)(e.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft.2 ff/ft 7P/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMHENTS: PERFORtKD BY: DATE:
PT-37.5:7"B" CONTAHRlENT RECIRCULATION FAN NODAL CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 TRAVERSE i2 Tot.Traverse jjl 10 ave.traverse ijl 3 7/16 6 1/8 9 1/2 Tot.Traverse ij2 10 Total=ave.traverse/j2"H20 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft.2 2 12 in/ft Z.31 ft H20 f in 28 (~)=(64.4 ft/sec)(e.075/P/ft ft/sec 2 2 Area of 42" Duct-" 9,6218 ft 2 jj/f t fP/f t ft/sec 0=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COlQKNTS: PERFORMED BY: DATE:
PT-37.5:8"C" CONTAM1ENT RECIRCULATION FAN NORM CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 TRAVERSE Tot.Traverse gl Tot.Traverse/j2 Total 10 10 ave.traverse tj1=ave.traverse jj2"H 0 9 1/2 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 4O 1S/16 TOTAL ("H 0)144 in/ft 2 2 12 in ft Z.31 ft/H20 i in" 2g (dP)=64.4 ft/sec)(e..o7s/E/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 8/ft 8/f t.ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMMENTS: PERFORMED BY: DATE:
PT-37.5:9"C" CONTAIRlENT RECIRCULATION FAN ACCIDENT CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE 1 2 Tot.Traverse-j/1 Tot.Traverse g2 Total 2 10 10 ave.traverse ill=ave.traverse 82 H,O 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in V=g (&)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9.6218 ft g/ft 0/ft ft/sec g=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COtHNTS: a PERFORMED BY: DATE:
pT-37.5:10"D" CONTAIQKNT RECIRCULATION FAif NOEfAL CONDlTIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 i/8 9 1/2 14 3/8 TRAVERSE 82 Tot.Traverse jjl Tot.Traverse jj2 Total 10 10 ave.traverse/tl=ave.traverse/j2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 i5/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 2g QZ)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9'218 ft 2/E/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COE'ANTS E e PERF016KD BY: DATE:
0>i~'i,