Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop
ML20155G030
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/30/1998
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17265A449 List:
References
AP-CCW.1, NUDOCS 9811060188
Download: ML20155G030 (15)


Text

.

[0P:

TITLE:

9, REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 1 of 14

/D U

ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBIg MANAGER U_

10-3042 EFFECTIVE DATE d

{

CATEGORY 1.0 i

REVIEWED BY:

O

BA' 28a!" O a8884 F

PDR_

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP d

PAGE 2 of 14

(

')

A.

PURPOSE - This procedure provides the actions required to identify and isolate leakage into the CCW system and to control the plant during the course of the event.

B.

ENTRY CONDITIONS / SYMPTOMS 1.

ENTRY CONDITIONS - This procedure is entered from; a.

AP-CVCS.1, CVCS LEAK, or, b.

AP-RCS.1, RCS LEAK, or, c.

AP-RCP.1 RCP SEAL MALFUNCTION, when CCW surge tank level increasing.

2.

SYMPTOMS - The symptoms of LEAKAGE INTO THE COMPONENT

. COOLING LOOP are; a.

Annunciator A-5, CCW SURGE TANK HI LEVEL 58.8%,

lit or b.

CCW radiation monitor (R-17) alarm, or c.

Annunciator A-7 (15), RCP A (B) CCW RETURN HI TEMP

/~N-OR LO FLOW 165 GPM 125'F,-lit or b

d.

Erratic RCP labyrinth seal D/P.

O

I l.

E0P:

TITLE:

REV: 13 l

AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP l

PAGE 3 of 14 i OV l

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP l'

CAUTIQH o IF. AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS. THEN E 0. REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.

o IF CCW SYSTEM RADIATION MONITOR ALARMS, THEN VERIFY CCW SURGE TANK VENT.

l RCV 017, CLOSES.

l l

1 Check CCW Indications

a. Check CCW surge tank level -
a. H level decreasing, IliEN go to INCREASING AP-CCW.2. LOSS OF CCW DURING l

POWER OPERATION or AP-CCW.3.

LOSS OF CCW - PLANT SHUTDOWN as l

necessary. H level stable, l

THEN return to procedure or step in effect.

,1O l

v

b. Direct RP tech to perform l

CH-PRI-CCW-LEAK, DETERMINATION OF CCW SYSTEM LEAKAGE i

l

c. CCW radiation monitor, R-17
c. Check RCS leakrate. H RCS l

INCREASING 1eakrate increasing. THEN go to Step 2 (Refer to RCS Leakage l

Surveillance Sheet).

H RCS leakage and R 17 indication normal, THEN go to Step 13.

O I

L I

i

. -. ~.

_. ~

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 4 of 14 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP CAUTION IF EITHER RCP #1 SEAL OUTLET TEMPERATURE EXCEEDS 215'F, THEN THE AFFECTED RCP(S) SHOULD BE STOPPED.

N_QIE: RCPs may be safely operated without CCW to the thermal barrier if seal injection flow is maintained.

2 Check RCP Thermal Barrier H either pump has indication of a Indications:

thermal barrier leak. IHEN perform the following:

o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER AND

a. Verify seal injection flow to APPROXIMATELY EQUAL affected RCP.

o RCP #1 seal leak off flows -

b. Close CCW return from affected WITHIN THE NORMAL OPERATING RCP thermal barrier (labyrinth

[,')

RANGE OF FIGURE RCP SEAL LEAK 0FF seal D/P should increase).

%J o Annunciator A-7 (15). RCP A (B)

RCP A. A0V-754A e

CCW RETURN HI TEMP OR L0 FLOW e RCP B, A0V-754B 165 GPM 125'F - EXTINGUISHED

c. Evaluate CCW surge tank level trend. H leakage into the CCW system has stopped. IHEN go to Step 17.

3 Check RCS temperature -

Go to Step 7.

GREATER THAN 350 F

E0P: '

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 5 of 14 bO ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP CAUTION CLOSELY MONITOR PRZR LEVEL AND RCS PRESSURE WHILE LETDOWN IS ISOLATED.

.................c.

4 Check NRHX For Leakage:

a. Normal letdown - IN SERVICE
a. IE excess letdown in service.

.THEN perform the following:

1) Close excess letdown flow control valve. HCV-123.
2) Close EXCESS LTDN LOOP A COLD TO Hx, A0V-310.
3) Go to Step 5.
b. Check Letdown Indications:
b. Isolate Normal Letdown:

o Letdown line flow -

1) Close loop B cold leg to APPROXIMATELY 40 GPM REGEN Hx. A0V-427.

o Low press LTDN pressure -

2) Close letdown orifice valves APPROXIMATELY 250 PSIG (A0V-200A, A0V-200B, and A0V-202).

o Letdown pressure control valve, PCV-135, demand -

3) Place letdown pressure APPROXIMATELY 35% OPEN controller, PCV-135, in MANUAL and close valve (demand at 100%).
4) Control charging pump speed as necessary to maintain RCP labyrinth seal D/P less than 80 inches.
5) Close charging flow control valve. HCV-142.
6) Go to Step 5.
c. Go to Step 6 O

u

-. _.. _.. _ _ _.. ~.. _. _.. _. _, _ _ _ _.

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 6 of 14 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP L_

5 Check If CCW Inleakage Has Stopped:

a. CCW surge tank level STABLE
a. H CCW surge tank level still increasing. IHEN perform the following:
1) Restore letdown flowpath previously isolated (Refer to Attachment LETDOWN)

-2) Adjust charging as necessary to restore PRZR level.

3) Go to Step 13.
b. Restore an intact letdown flowpath if available (Refer to Attachment LETDOWN)

O.

c. Check any letdown flowpath -
c. H no letdown flowpath V-RESTORED available. I}JEH consult Plant Staff.
d. Adjust charging as necessary to restore PRZR level

1 E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 7 of 14 O

O ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP 6 Establish Stable Plant Conditions:

a. Check Tavg - TRENDING TO TREF
a. Insert / withdraw control rods or.

if necessary, adjust turbine load to match Tavg to Tref.

b. Check PRZR pressure - TRENDING
b. Verify proper operation of PRZR TO 2235 PSIG heaters and spray or take manual control of PRZR pressure controller 431K.
c. Check PRZR level - TRENDING T0
c. Verify proper operation of PROGRAM charging pump speed controllers or take manual control of speed controllers to control PRZR level.
d. Go to Step 17 O

mb

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 8 of 14 l

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP I

CAUTION o CLOSELY MONITOR PRZR LEVEL AND RCS PRESSURE WHILE LETD0'J:4 IS ISOLATED.

o UNFILTERED WATER MAY DAMAGE RCP SEAL SURFACES.

7 Check NRHX For Leakage:

a. Narrow range PRZR level - ON
a. IE the RCS is solid M SCALE perform the following:
1) Stop any running RCP.
2) M RCPs stopped. M stop any running charging pump.
b. Isolate letdown flow to NRIIX:

o Ensure the following valves -

CLOSED Loop B cold leg to REGEN e

Hx, A0V-427

. Letdown orifice valves (A0V-200A, A0V-200B, and A0V-202)

. RHR letdown flow control valve. HCV-133 o Close letdown isolation valve. A0V-371 o Place letdown pressure l

controller, PCV-135. in MANUAL snd close valve (demand at 100%).

.O

%)

\\

E0P:

TITLE:

~

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 9 of 14 i

O LJ ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP

]

CAUTION i

IF THE RCS IS WATER SOLID. THEN ANY INCREASE IN RCS TEMPERATURE MAY RESULT IN A SIGNIFICANT RCS PRESSURE INCREASE. RCS HEATUP SHOULD BE PREVENTED.

8 Check If CCW Inleakage Has Stopped:

a. CCW surge tank level - STABLE
a. H CCW inleakage continues.

IHEH so to Step 9.

b. Narrow range PRZR level - ON
b. H RCS is solid. THEN perform SCALE the following:
1) Ensure both RCPs off.
2) Cycle charging pumps as

,.s.

necessary to control RCS pressure.

c. Establish excess letdown (Refer to Attachment LETDOWN)
d. Start one charging pump
e. Adjust charging flow as necessary to restore PRZR level i
f. Check RCS temperature - STABLE
f. Adjust RHR cooling as necessary.
g. Go to Step 17 I

d

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 10 of 14 ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP 9 Restore Letdown:

a. Check RHR - IN SERVICE
a. Perform the following:
1) Establish normal letdown (Refer to Attachment LETDOWN).

i l

2) Go to Step 10.
b. Open letdown isolation valve.

A0V-371

c. Place letdown controllers in MANUAL at 40% open

. TCV-130 e PCV-135

d. Manually open RHR LETDOWN TO CVCS. HCV-133
e. Place TCV-130 in AUTO at 105*F
f. Place PCV-135 in AUTO at desired j

. pressure

g. Start one charging pump
h. Adjust charging flow as necessary to restore PRZR pressure / level

....m_

I l

TITLE:

E0P:

REV: 13

{

AP-CCW.1 LEAI: AGE INTO THE COMPONENT COOLING LOOP l

PAGE 11 of 14 A

. <g ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP l

l CAUTION i

o ONE TRAIN OF RHR SHALL BE OPERABLE AT ALL TIMES.

o IF AN RHR PUMP OR HX IS REMOVED FROM SERVICE. THEN OPERABILITY l

REQUIREMENTS SHOULD BE EVALUATED (REFER TO ITS SECTIONS 3.4 AND 3.5).

10 Check RHR System For Leakage:

a. Both'RHR loops - ALIGNED AND
a. J.E any loop isolated for this OPERABLE leak investigation. THEN perform l

the following:

1) Restore isolated loop to service (Refer to Attachment RHR ISOL and S 13A. RHR LINEUP FOR SAFETY INJECTION).

(

2) WHEN loop restored. THEN isolate other RHR loop (Refer to Attachment RHR ISOL).
3) Go to Step 11.

l

b. Isolate selected RHR Icop (Refer to Attachment RHR ISOL) l l

E 11 Verify RCS temperature -

Increase cooling from available RHR l

STABLE OR DECREASING loop.

Attempt to establish S/G cooling if necessary.

l t

4 1

?

y

(

f I

i C

~.. - -

, ~ -.. _. _... ~

  • ~

E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP 6

PAGE 12 of 14 1

i O

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP l

12 Check If CCW Inleakage Has Stopped:

a. CCW surge tank level - STABLE
a. E any RHR loop has NOT been checked for leakage. IHEH return to Step 10.

H both RHR loops have been checked. THEN restore RHR loops l

to operable and go to Step 13.

1

b. Go to Step 17 l

13 Check RMW to CCW Surge Tank:

E RMW to CCW surge tank, MOV-823.

l open OR RMW pump running. IREN o Verify CCW surge tank fill perform the following:

valve. MOV-823 - CLOSED

a. Close CCW surge tank fill valve, o Verify RMW pump (s) - 0FF MOV-S23.

b, Shut off running RMW pumps.

c. H CCW inleakage stops, IEEN go to Step 17.

l l

L t

1 l

' E0P:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 13 of 14 r

i i

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l

STEP l

14 Check For Sample Hx Leaks:

a. Direct A0 to locally check
a. Determine which sample Hx CCW nuclear sample room Hxs outlet temperature is high, THEN perfore the following:

o Sample Hx (TI-602) common CCW return temperature from

1) Isolate the affected Hx.

sample Hxs - NORMAL (Refer to j

Aux Bldg log sheet, 3 of 3)

2) H CCW inleakage has stopped.

THEN go to Step 17.

o Sample Hx (FI-603) common CCW l

return flow from sample Hxs -

l NORMAL (Refer to Aux Bldg log sheet. 3 of 3)

b. Direct RP Tech to check PASS -
b. Go to Step 15.

SAMPLING IN PROGRESS

c. Direct RP Tech to terminate PASS l

sampling

/

d. Verify CCW inleakage - STOPPED l

15 Check SW Header Pressure -

Dispatch A0 to check CCW pump LESS THAN 60 PSIG discharge pressure. H SW pressure greater than CCW pressure. THEN investigate possible SW 1eak into CCW system.

CAUTION l

IF A SAFEGUARDS PUMP IS TO BE REMOVED FROM SERVICE DURING AN EMERGENCY CONDITION, THEN CONSULT WITH PLANT STAFF PRIOR TO STOPPING PUMP.

16 Check Safeguards Pump Status E any event in progress requiring

- ALL SAFEGUARDS PUMPS OFF safeguards pump operation. THEN consult Plant Staff for guidance on

. SI pumps checking safeguards pumps for CCW RHR pumps leakage.

e CS pumps

~ -.... -

-......... -. -.. - -. - _. - _. -.. ~ _ -

l E0P:

TITLE:

REV: 13

+

AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 14 of 14 0

ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED STEP i

17 Evaluate Plant Conditions:

a. CCW inleakage - IDENTIFIED AND
a. Return.to Step 2.

ISOLATED

b. Determine if operation can
b. IE plant shutdown is required.

continue (Consult Plant staff if THEN refer to 0-2.1. NORMAL necessary) - OPERATION CAN SHUTDOWN TO HOT SHUTDOWN.

l.

CONTINUE i

18 Check CCW Surge Tank Level -

Consult RP tech to determine method APPROXIMATELY.50%

to drain and dispose of excess CCW.

NOTE: Refer to 0-9.3 NRC IMMEDIATE NOTIFICATION for reporting l

requirements.

19 Notify Higher Supervision r

20 Return To Procedure Or Guidance In Effect

-END-l f

i

)

I l-

...._..~ _...,_

.q EDP:

TITLE:

REV: 13 AP-CCW.1 LEAKAGE INTO THE COMPONENT COOLING LOOP PAGE 1 of 1 i

k AP-CCW.1 APPENDIX LIST l

I TITLE 1)

FIGURE RCP SEAL LEAKOFF (FIG-4.0) 2)

ATTACHMENT RHR ISOL (ATT-14.2) 3)

ATTACHMENT LETDOWN (ATT-9.0) 4 O

.-.