ML17264A516

From kanterella
Jump to navigation Jump to search
Rev 2 to Technical Requirements Manual (TRM)
ML17264A516
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/22/1996
From: Wrobel G
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-960522, NUDOCS 9605310084
Download: ML17264A516 (8)


Text

J

~ ~l

~ gISR261 OCHESTER GAS Ec ELECTRIC C ORATION DOCUMENT CONTROL I

Document Transmittal To < DOCUMENT CONTROL DESK Transmittal:

ggjgqP~

960507 Date: 05/23/1996

~

N 059 US NRC Holder: 1217 ATT t ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN

~ 'CCORDANCE WITH QA-603.

I" Doc Id Doc Title Rev Rev Date Qty TRM TECHNICAL REQUIREMENTS MANUAL FOR 002 05/24/1996 1 GINNA STATION 3 I aaaaaaaaaaaaaaaaaaaaxaaaaaaaaaaaaaxaaaaaxxaxaaaaaaaaaaaaxaaaxaaaaaaaaaaaaa Receipt Acknowledgement and Action Taken:

Signature Date Return to: Attention Document Control - 49/3 Rochester Gas 6 Electric Corporation 89 East Avenue Rochester, New York 14649 qb053i0084 qb0522 PDR ADOCK 05000244 F PDH

'~

A

~ ~

~ ., ~

Gas and Electric Corpdration 'ochester Inter-Office Correspondence May 22, 1996

SUBJECT:

Issuance of Revision 2 to Technical Requirements Manual (TRM)

TO: Distribution Attached is Revision 2 to the TRM. These changes are made to provide consistency between the TRM, ITS, and COLR Table 1 with respect to RWST boron concentration requirements. Revision 2 to the TRM is considered effective on May 24, 1996.

Please update yow copy of the TRM according to the list below.

III LEP-i LEP-i B 3.1-3 B 3.1-3 B 3.1-7 B 3.1-7 Any questions should be directed to Mark Flaherty (x8512) or Peter Bamford (x3 832).

George J. Wrobel Manager, Nuclear Safety & Licensing MD&855

.r s c List of Effective Pages (TRH)

P ge Rev. Page Rev. Page Rev. Page TOC Section 3.4 Section 3.8 TRH 3.4-1 TRH 3.8-1 TRH 3.4-2 Sectio 1.0 TRH 3.4-3 Section 3.9 TRH 3.4-4 TRH 1.0-1 TRH 3.4-5 TRH 3.9-1 0 TRM 3.4-6 TRH 3.9-2 0 Section 2.0 TRN 3.4-7 TRH 3.9-3 0~

TRH 3.9-4 TRM 2.0-1 Section 3.5 Section 3.0 RH 3.5-1 TRH 3.0-1 Section 3.6 Section 3.1 TRM 6-1 TRH 3.1-1 Sects n 3.7 TRH 3.1-2 TRH 3.1-3 TRH 3.7-1 TRH 3.1-4 TRH 3.7-2 TRH 3.1-5 TRH 3.7-3

,TRH 3. 1-6 TRH 3.7-4 TRM 3.1-7 TRH 3.7-5 TRH 3.7-6 Section 3.2 TRH 3.7-7 TRM 3.7-8 TRH 3.2-1 TRM 3.7y TRH 3'-10 Section 3.3 TRH 3.7-11 TRg 3.7-12 TRN 3.3-1 1 KH 3.7-13 TRM 3.3-2 0 RH 3.7-14 TRM 3.3-3 TRH 3.7-15 TRN 3.3-4 TRN 3. 7-16 TRH 3.3-5 TRN 3.7-17 TRH 3:3-6 TRN 3.7-18 TRN 3.3-7 TRH 3.7-19 TRN 3.3-8 TRH 3.7-20 TRH 3.3-9 TRH 3.7-21 TRM 3.3- 0 TRH 3.7-22 TRN 3.3 ll TRH 3.7-23 TRH 3. -12 TRH 3.7-24 TRH 3.3-13 TRH .3-14 nna Station TRH LEP-i Revision 1

0 I Boron Injection Syst - HO()ES I, 2i 3, and 4 TR 3.I.I SURVE I LLANCC RE(U I REHENT S SURVEILLANCE FREQUENCY TSR 3.1.1.1 -NOTE---

Only required to be performed when complying with TR 3 . 1. 1. a.

Verify RWST boron concentration is z 2000 7 days ppm.

TSR 3.1.1.2 -NOTE-Only req-ired to be performed when complying with TR 3.). I.b.

Verify boric acid storage tank level is 24 hours within limit.

TSR 3.1.1.3 -NOTE--

Only required to be performed when complying with TR 3.1.1.b.

Verify boric acid storage tank boron Twice p'r week concentration is within limit.

TSR 3.1.1.4 Perform CHANNEL CALIBRATION of Volume 18 months Control Tank level indication.

(continued)

Ginna Station TRH IRH 3.1-3 Revision 0

C Boron njection System-HODE 5 TR 3.1.2 ACTIONS continued CONDITION REQUIRED ACTIONS COHPLET ION TIHE B ---------NOTE-------- B.l Initiate action to Immediately Only applicable to TR borate RCS to within 3.1.2.a. limit.

OR RCS boron concentration not B.2 Initiate action to Immedi ately within limit. verify one boron injection subsystem is OPERABLE.

SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.1.2.1 NOTE-Only required to be performed when complying with TR 3. 1.2.b.

Verify boron injection subsystem suction Twice per week source boron concentration is z 2000 ppm.

TSR 3.1.2.2 NOTE-Only required to be performed when complying with TR 3. 1.2.a.

Verify RCS boron concentration is within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> the limit specified in the COLR for LCO 3.9.1.

Ginna Station TRH TRH 3.1-7 Revision 1