ML17250A560

From kanterella
Jump to navigation Jump to search
Responds to Dl Ziemann 800425 Ltr Re SEP Topics VI-10.A & VI-7.A.3 on Testing of Reactor Trip Sys & Engineered Safety Features Including Response Time Testing & ECCS Actuation, Respectively.Tech Specs & Test Procedures Encl
Date released: 04/30/2018 Download: ML17250A560


Containment Recirculation Fans Mass Air Flow Check.
ML17250A583
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A583 (15)
Containment Fan Recirculation Unit HEPA Filter Bank Testing.
ML17250A581
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/25/1978
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A581 (9)
Containment Post Accident Charcoal Filter Bypass Flow.
ML17250A579
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/09/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A579 (7)
Post Accident Charcoal Filter Dampers.
ML17250A578
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/07/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A578 (11)
Plant Safeguard Logic Test a or B Train.
ML17250A577
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/07/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A577 (13)
Process Instrumentation Reactor Protection Channel Trip Test.
ML17250A574
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/30/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A574 (24)
Verification of Emergency Start Logic Auxiliary Feedwater Pumps.
ML17250A571
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/17/1980
From: Schuler T, Snow R
ROCHESTER GAS & ELECTRIC CORP.
To:
References
TASK-10, TASK-RR
Download: ML17250A571 (10)
Diesel Generator Load & Safeguard Sequence Test.
ML17250A567
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/26/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
TASK-08-02, TASK-8-2, TASK-RR
Download: ML17250A567 (42)
Safety Injection Functional Test.
ML17250A564
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/03/1980
From: Schuler T, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A564 (73)
Valve Interlock Verification-Feedwater Isolation.
ML17250A562
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/17/1979
From: Schuler T, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17250A562 (8)
Responds to Dl Ziemann 800425 Ltr Re SEP Topics VI-10.A & VI-7.A.3 on Testing of Reactor Trip Sys & Engineered Safety Features Including Response Time Testing & ECCS Actuation, Respectively.Tech Specs & Test Procedures Encl
ML17250A558
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/10/1980
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: CRUTCHFIELD D
Office of Nuclear Reactor Regulation
References
TASK-06-07.A3, TASK-06-10.A, TASK-6-10.A, TASK-6-7.A3, TASK-RR
Download: ML17250A558 (9)