ML17265A640

From kanterella
Jump to navigation Jump to search
Rev 11 to Technical Requirements Manual for Ginna Station.
ML17265A640
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/12/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-990512, NUDOCS 9905190155
Download: ML17265A640 (12)


Text

CATEGORY REGULAT~ INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9905190155 DOC.DATE: 99/05/12 NOTARIZED: NO DOCKET . ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 0500 44 AUTHOR AFFILIATION RECIP.NAME

'"'ochester AUTHsNP24F.

Gas E Electric Corp.

RECIPIENT AFFILIATION JOHNSON,A. Records Management Branch (Document Control Desk)

SUBJECT:

Rev 11 to "Technical Recgxirements Manual for Ginna Station."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: A TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E

RECIPIENT COPIES'TTR RECIPIENT COPIES ID CODE/NAME ENCL ID CODE/NAME LTTR ENCL LPD1-1 LA LPD1-1 PD 0 VISSING,G.

INTE B. ILE CENT R 01 1 NRR/DE/EMCB NRR DE EMEB 1 NRR/DSSA/SPLB 1 NRR/DSSA/SRXB 1 NRR/SPSB JUNG,I .1 NUDOCS-ABSTRACT 1 OGC/HDS3 0 EXTERNAL: NOAC NRC PDR D

U

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 j TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL 12

DISR261 CHESTER GAS 6 ELECTRXC C ORATION DOCUMENT CONTROL

. Document Transmittal Transmittal: 9905026N 055 To: DOCUMENT CONTROL DESK Date: 05/10/1999 US NRC Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED XNSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH IP-DOC-1.

Doc Id Doc Title Rev Rev Date Qty TRM TECHNICAL REQUIREMENTS MANUAL FOR 011 05/12/1999 1 GXNNA STATION

.~>i 41

. ("

Receipt Acknowledgement and Action Taken:

Signature Date Return to: Rochester Gas & Electric Corporation Ginna Station - Records Management 1503 Lake Road Ontario, New York 14519 9905%'F0155 9905i2 PDR ADQCK Q5000244 P PDR

~ C Rochester Gas and Electric Corporation Inter-Office Correspondence May 7, 1999

Subject:

Improved Technical Specifications (ITS), Amendment No. 74; Bases Revision 15; and Technical Requirements Manual (TRM) Revision 11 Tot Distribution Attached is Amendment No. 74 to the Ginna Station Improved Technical Specifications (ITS). This Amendment revises the specific gravity requirements for the station batteries. This Amendment was approved by the NRC in a safety evaluation dated April 23, 1999. This Amendment is considered effective May 12, 1999.

In addition to the Amendment, the associated changes to the ITS Bases and the Technical Requirements Manual are also included. Instructions for the necessary changes to your controlled copy of the ITS are attached.

Please contact Tom Harding (extension 3384) if you have any questions.

Thomas L. Harding

Attachment A Please replace the following pages of your controlled copy of the ITS as follows:

Volume Section Remove Insert Attachment A to License First Page First Page Attachment A to License LEP-ii LEP-ii Attachment A to License LEP-viii LEP-viii Chapter 3.8 (LCO) 3.8-19 3.8-19 11 Chapter 3.8 (Bases) B 3.8-37 B 3.8-37 II Chapter 3.8 (Bases) B 3.8-52 .B 3.8-52 II Chapter 3.8 (Bases) B 3.8-55 B 3.8-55 11 Chapter 3.8 (Bases) B 3.8-56 B 3.8-56 III TRM First Page First Page III TRM LEP-i LEP-i m TRM Chapter 5.0 TRM 5.0-2 TRM 5.0-2

1 GINNA STATION TRM Revision 10 TECHNICAL REQUIREMENTS MANUAL

{TERM}

R sponsib e Hanager ui'~8/~S Effective Date Controlled Cop No. ~l

List of Effective Pages (TRH)

Page Rev. Page Rev. Page Rev. Pa e Rev.

TOC Section 3.3 Section 3.7 (con'd) (con'd) 8 4 TRH 3.3-13 TRH 3.7-10 6 TRH 3.3-14 TRH 3.7-11 10 Section 1.0 TRH 3.3-15 TRH 3.7-12 1 TRN 3.3-16 TRH 3.7-13 10 TRM 1.0-1 TRM 3. 7-14 1 Section 3.4 TRH 3. 7-15 4 Section 2.0 TRH 3. 7-16 1 TRH 3.4-1 1 TRH 3.7-17 6 TRH 2.0-1 TRH 3.4-2 1 TRH 3. 7-18 1 TRM 3.4-3 0 TRH 3.7-19 1 Section 3.0 TRM 3.4-4 0 TRH 3.7-20. 6 TRM 3.4-5 0 TRM 3.7-21 6 TRM 3.0-1 TRM 3.4-6 0 TRM 3.7-22 6 TRH 3.4-7 0 TRM 3.7-23 1 Section 3.1 TRH 3.4-8 3 TRH 3.7-24 1 TRH 3.4-9 3 TRH 3.7-25 8 TRH 3.1-1 TRH 3.4-10 3 TRH 3.7-26 8 TRH 3.1-2 TRH 3.4-11 3 TRH 3.1-3 TRN 3.4-12 3 Section 3.8 TRM 3.1-4 TRM 3.4-13 3 TRH 3.1-5 TRM 3.4-14 3 TRM 3.8-1 0 TRH 3.1-6 TRM 3.8-2 3 TRH 3.1-7 Section 3.5 TRN 3.8-3 10 Section 3.2 TRN 3.5-1 Section 3.9 TRH 3.2-1 Section 3.6 TRM 3.9-1 0 TRM 3.9-2 8 Section 3.3 TRM 3.6-1 TRM 3.9-3 8 TRH 3.9-4 1 TRM 3.3-1 1 Section 3.7 TRH 3.9-5 10 TRM 3.3-2 0 TRH 3.9-6 8 TRH 3.3-3 1 TRH 3.7-1 ,1 TRM 3.9-7 8 TRH 3.3-4 0 TRM 3.7-2 1 TRH 3.3-5. 0 TRH 3.7-3 6 Section 4.0 TRN 3.3-6 0 TRH 3.7-4

'TRM 3.3-7 1 TRM 3.7-5 1 TRM 4.0-1 TRH 3.3-8 1 TRH 3.7-6 1 TRN 3.3-9 6 TRM 3.7-7 3 Section 5.0 TRH 3.3-10 10 TRM 3.7-8 TRH 3.3-11 4 TRH 3.7-9 1 TRH 5.0-1 TRH 3.3-12 4 TRH 5.0-2 Ginna Station TRH LEP-i Revision 10

0 0

Table TR 5.1.1 (page 1 of 1)

Teaporary LCO Requirements Action Required Actions 1 tern Report ¹ Teaporary LCO Requirement if Hot Het Effective Dates 5.1.1 97-0783 a. Verify key switches for KOVs 852A and 8528 are in "off a. Declare associated ECCS train 6/19/97 unt i l LCO position" every 31 days. inoperable per LCO 3.5.2. 3.5.2 is changed 5.1.2 97.0894 a. Verify HaOH System tank HaOH solution concentration is a. Declare NaOH system inoperable per 6/19/97 until LCO s 35X by weight every 184 days. LCO 3.6.6. 3.6.6 is changed.

5.1.3 H/A a. R-11 required to b'e operable in NODES 1,2,3, and 4. a. Perform either an RCS water 12/18/98 until inventory balance (SR 3.4.13.1) or LCO 3.4.15 is analysis of containnent atmosphere changed.

grab samples once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

98-1726 a. Verify specific gravity of the designated pilot cell a. Declare associated battery 1/8/99 until LCO in each Train A and Train 8 battery is a 1.195 every inoperable per LCO 3.8.6. 3.8.6 is changed.

31 days.

5.1.5 98-1726 a. Verify average specific gravity of all connected cells a. Declare associated battery 1/8/99 until LCO of each Train A and Train 8 battery is a 1.195 every inoperable per LCO 3.8.6. 3.8.6 is changed.

92 days.

V ~ ~

L