ML17264A999

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values
ML17264A999
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/19/1997
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A997 List:
References
NUDOCS 9708270201
Download: ML17264A999 (5)


Text

Attachment II Marked Up Copy ofR.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

3.5-2 97<<2roaog 9zoezqg ADOCK 05000244 PDR

Accumulators 3.5.1

~

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated isolation valve is fully open.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5.1.2 Verify borated water volume in each accumulator is )1126 cubic feet (50%)

and 154 cubic fee (82%).

I Ill 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.3 Verify nitrogen cover pressure in each accumulator is > 700 psig and < 790 psig.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I

SR 3.5. 1.4 Verify boron concentration in each accumulator is ~ 2100 ppm and s 2600 ppm.

31 days on a

STAGGERED TEST BASIS SR 3.5.1.5 Verify power is removed from each accumulator motor operated isolation valve operator when pressurizer pressure is

) 1600. psig.

3'1 days R.E. Ginna Nuclear Power Plant 3.5-2 Amendment No.

61

Attachment III Proposed Technical Specifications Included Pages:

5-2

rs 7

Accumulators 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated isolation valve is fully open.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.2 Verify borated water volume in each accumulator is ~ llllcubic feet (50%)

and x 1139 cubic feet (82%).'2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />'R 3.5. 1.3 Verify nitrogen cover pressure in each accumulator is z 700 psig and s 790 psig.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.4 Verify boron concentration in each accumulator is z 2100 ppm and s 2600 ppm.

31 days on a

STAGGERED TEST BASIS SR 3.5. 1.5 Verify power is removed from each accumulator motor operated isolation valve operator when pressurizer pressure is

) 1600 psig.

31 days R.E.

Ginna Nuclear Power Plant 3.5-2 Amendment No. g

lp 8

'r lf C

yl I