Text
Attachment II Marked Up Copy ofR.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:
3.5-2 97<<2roaog 9zoezqg ADOCK 05000244 PDR
Accumulators 3.5.1
~
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated isolation valve is fully open.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5.1.2 Verify borated water volume in each accumulator is )1126 cubic feet (50%)
and 154 cubic fee (82%).
I Ill 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.3 Verify nitrogen cover pressure in each accumulator is > 700 psig and < 790 psig.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I
SR 3.5. 1.4 Verify boron concentration in each accumulator is ~ 2100 ppm and s 2600 ppm.
31 days on a
STAGGERED TEST BASIS SR 3.5.1.5 Verify power is removed from each accumulator motor operated isolation valve operator when pressurizer pressure is
) 1600. psig.
3'1 days R.E. Ginna Nuclear Power Plant 3.5-2 Amendment No.
61
Attachment III Proposed Technical Specifications Included Pages:
5-2
rs 7
Accumulators 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated isolation valve is fully open.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.2 Verify borated water volume in each accumulator is ~ llllcubic feet (50%)
and x 1139 cubic feet (82%).'2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />'R 3.5. 1.3 Verify nitrogen cover pressure in each accumulator is z 700 psig and s 790 psig.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5. 1.4 Verify boron concentration in each accumulator is z 2100 ppm and s 2600 ppm.
31 days on a
STAGGERED TEST BASIS SR 3.5. 1.5 Verify power is removed from each accumulator motor operated isolation valve operator when pressurizer pressure is
) 1600 psig.
31 days R.E.
Ginna Nuclear Power Plant 3.5-2 Amendment No. g
lp 8
'r lf C