ML17264A999

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values
ML17264A999
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/19/1997
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A997 List:
References
NUDOCS 9708270201
Download: ML17264A999 (5)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

3.5-2 97<<2roaog 9zoezqg ADOCK 05000244 PDR

Accumulators 3.5.1

~

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated 12 hours isolation valve is fully open.

SR 3.5.1.2 Verify borated water volume in each 12 hours accumulator is )1126 cubic feet (50%) and 154 cubic fee (82%).

I Ill SR 3.5. 1.3 Verify nitrogen cover pressure in each 12 hours accumulator is > 700 psig and < 790 psig.

I SR 3.5. 1.4 Verify boron concentration in each 31 days on a accumulator is ~ 2100 ppm and s 2600 ppm. STAGGERED TEST BASIS SR 3.5.1.5 Verify power is removed from each 3'1 days accumulator motor operated isolation valve operator when pressurizer pressure is

) 1600. psig.

R.E. Ginna Nuclear Power Plant 3.5-2 Amendment No. 61

Attachment III Proposed Technical Specifications Included Pages:

5-2

rs 7 Accumulators 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1. 1 Verify each accumulator motor operated 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> isolation valve is fully open.

SR 3.5. 1.2 accumulator is ~

x 1139 cubic feet (82%).'2 Verify borated water volume in each llll cubic feet (50%) and hours'R 3.5. 1.3 Verify nitrogen cover pressure in each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> accumulator is z 700 psig and s 790 psig.

SR 3.5. 1.4 Verify boron concentration in each 31 days on a accumulator is z 2100 ppm and s 2600 ppm. STAGGERED TEST BASIS SR 3.5. 1.5 Verify power is removed from each 31 days accumulator motor operated isolation valve operator when pressurizer pressure is

) 1600 psig.

R.E. Ginna Nuclear Power Plant 3.5-2 Amendment No. g

lp 8

'r lf C

yl I