((3 E0P:

liiLL:

I REV: 3 ATT-12.0 ATTACHMENT N2 PORVS PAGE 1 of 2 Responsible Manager o

Date O-N-9]

i 0

l WHEN IA to CNMT NOT available, THEN perform the following to operate one (or both) PRZR PORV(s) in accordance with guidance provided by the procedure step:

a NOTE:

o If RCS overpressurization accumulator pressure decreases to less than 200 psig, then recharge accumulators using S-29.2, CHARGING THE REACTOR VESSEL OVERPRESSURE PROTECTION SYSTEM ACCUMULATORS.WITH N2.

This will require reset of CI and XY relays for the N2 supply valve to CNMT, AOV-846.

o For FR-H.1 Bleed and Feed the PORV block valve is not i

required to be operable.

l A)

Select a PORV with an operable block valve, obtain a key for the RCS overpressurization system, and perform the appropriate step below:

o PCV-431C:

a)

Verify block valve MOV-515 - OPEN AND OPERABLE

(}

b)

Place OP ACCUM TO SURGE TK VLV SOV-8616B to OPEN

(_-

o PCV-430-i a)

Verify block valve MOV-516 - OPEN AND OPERABLE i

b)

Place OP ACCUM TO SURGE TK VLV SOV-8616A to OPEN l

B)

To depressurize the RCS in accordance with the guidance provided by the EOP step, perform the following:

o For PCV-431C, place overpressurization system arming switch, PCV-431C N2 ARMING VLV SOV-8619B, to ARM o

For PCV-430, place overpressurization system arming switch, PCV-430 N2 ARMING VLV SOV-8619A, to ARM C)

IF it is desired to maintain PORV(s) open below 410 psig, I

THEN place overpressure bistables to the trip position:

l 1.

In R-2 Protection Channel 1 Rack l

)

o 452B l

o 452C l

2.

In W-2 Protection Channel 2 Rack l

'o 451B l

o 451C l

O)

(,

3.

In B-2 Protection Channel 3 Rack I

o 450B l

o 450C I

9704010321 970324 PDR ADOCK 05000244 F

PDR

e a

LOP:

IIILE:

REV: 3 ATT-12.0 ATTACHMENT N2 PORVS PAGE 2 of 2 D)

WHEN depressurization complete, THEN close PORV(s) by placing SOV-8619A and SOV-8619B to BLOCK.

I E)

Ensure the overpressure protection bistables in the l

untripped position:

1 i

1.

In R-2 Protection Channel 1 Rack I.

4 o

452B l

o 452C 1

a 2.

In W-2 Protection Channel 2 Rack i

^

o 451B l

o 451C i

1 i

3.

In B-2 Protection Channel 3 Rack i

o 450B l

o 450C l

j l

1 3

- (V 1

)

)

i 4

4 I

i

.