|
---|
Category:Annual Report
MONTHYEARDCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-20-021, Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant2020-04-0101 April 2020 Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant DCL-19-024, and Humboldt Bay Power Plant 2019 Annual Statement of Insurance2019-03-28028 March 2019 and Humboldt Bay Power Plant 2019 Annual Statement of Insurance ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-052, Submittal of Annual Report of Occupational Radiation Exposure for 20152016-04-26026 April 2016 Submittal of Annual Report of Occupational Radiation Exposure for 2015 DCL-15-093, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20142015-08-0606 August 2015 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2014 DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant DCL-14-025, Annual Report of Occupational Radiation Exposure for 20132014-04-10010 April 2014 Annual Report of Occupational Radiation Exposure for 2013 DCL-2014-509, Annual Report on Discharge Monitoring2014-02-28028 February 2014 Annual Report on Discharge Monitoring DCL-07-047, Annual Radioactive Effluent Release Report2007-04-27027 April 2007 Annual Radioactive Effluent Release Report DCL-06-088, CFR 50.46 Annual Report for 2005 of Emergency Core Cooling System Evaluation Model Changes2006-07-24024 July 2006 CFR 50.46 Annual Report for 2005 of Emergency Core Cooling System Evaluation Model Changes DCL-2006-522, PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report2006-04-28028 April 2006 PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report DCL-06-048, 2005 Annual Radioactive Effluent Release Report.2005-12-31031 December 2005 2005 Annual Radioactive Effluent Release Report. DCL-05-050, 2004 Annual Radiological Environmental Operating Report2005-04-29029 April 2005 2004 Annual Radiological Environmental Operating Report DCL-05-027, PG&E Corporation 2004 Annual Report2005-03-22022 March 2005 PG&E Corporation 2004 Annual Report DCL-04-051, Units I and 2, 2003 Annual Radiological Environmental Operating Report2004-04-30030 April 2004 Units I and 2, 2003 Annual Radiological Environmental Operating Report DCL-04-053, Annual Nonradiological Environmental Operating Report2004-04-28028 April 2004 Annual Nonradiological Environmental Operating Report DCL-04-038, Annual Technical Specification 5.6.1 Report2004-04-16016 April 2004 Annual Technical Specification 5.6.1 Report DCL-03-040, Annual Technical Specification 5.6.1 Report2003-04-16016 April 2003 Annual Technical Specification 5.6.1 Report DCL-02-114, Commitment Change Summary Report, January - December 20012002-09-24024 September 2002 Commitment Change Summary Report, January - December 2001 DCL-02-089, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes2002-07-26026 July 2002 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes 2024-03-27
[Table view] Category:Environmental Monitoring Report
MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report A000375, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 20242024-04-20020 April 2024 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 2024 DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring ML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 ML23137A1352023-04-18018 April 2023 NPDES Receiving Water Monitoring Program 2022 Annual Report ML23052A1152023-02-18018 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2022 DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-032, 2021 Annual Nonradiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Nonradiological Environmental Operating Report DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-22-025, 2021 Annual Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Radiological Environmental Operating Report DCL-22-017, Submittal of 2021 Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Submittal of 2021 Annual Radioactive Effluent Release Report DCL-21-037, Annual Nonradiological Environmental Operating Report2021-04-28028 April 2021 Annual Nonradiological Environmental Operating Report DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-21-022, 2020 Annual Radiological Environmental Operating Report2021-04-0101 April 2021 2020 Annual Radiological Environmental Operating Report L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 DCL-20-036, 2019 Annual Non-Radiological Environment Operating Report2020-04-29029 April 2020 2019 Annual Non-Radiological Environment Operating Report DCL-20-010, 2019 Annual Radiological Environmental Operating Report2020-04-16016 April 2020 2019 Annual Radiological Environmental Operating Report L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 DCL-2020-509, 2019 Annual Report on Discharge Self-Monitoring2020-02-27027 February 2020 2019 Annual Report on Discharge Self-Monitoring DCL-19-026, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-17-034, 2016 Annual Non-Radiological Environmental Operating Report2017-04-27027 April 2017 2016 Annual Non-Radiological Environmental Operating Report ML17128A0242017-04-26026 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-030, Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report2017-04-26026 April 2017 Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-031, Transmittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report ML17096A7662017-04-0606 April 2017 Submittal of Mitigating Strategies Assessment for Flooding Report DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)2017-03-29029 March 2017 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report2017-02-28028 February 2017 Submittal of 2016 Annual Discharge Self-Monitoring Report DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report2017-01-27027 January 2017 Diablo Power Plant - 2016 Annual Sea Turtle Report DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 20162017-01-20020 January 2017 Discharge Monitoring Report for Fourth Quarter 2016 DCL-16-113, Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports2016-11-0101 November 2016 Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports DCL-16-055, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-054, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-2016-516, Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring2016-04-20020 April 2016 Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring DCL-15-137, Corrections to the 2014 Annual Radioactive Effluent Release Report2015-12-31031 December 2015 Corrections to the 2014 Annual Radioactive Effluent Release Report 2024-08-28
[Table view] Category:Letter
MONTHYEARML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) 2024-09-09
[Table view] |
Text
m Pacific Gas tBJtJBd Electric Comparay
PG&E Letter DCL-2016-518 April 27, 201e,. John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 PG&E Diablo Canyon Power Plant (DCPP) Receiving*Water Monitoring Program 2.015 Annual Report Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2015 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2015. Per prior agreement, no analysis or interpretation of the data was performed.
Tables in the appendices provide summary statistics for each program task. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or th<;>se persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility.of fine and imprisonment for knowing violations.
If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Bryan Cunning.ham at (805) 545-4439.
Paula A. Gerfen {) Station Director-Diab/a Canyon Power Plant 2016518/jlk/bkc Enclosure (1)
PG&E Letter DCL-2016-518 John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board April27,2016 . Page 2 cc w/enclosure:
PDF Formatted Electronic File Copy: Regional Administrator, Region 9 U.S. Environmental Protection Agency .75 Hawthorne Street San Francisco, CA 94105 Attention:
Water Division California Department of Fish and Wildlife Marine Region 20 Lower Ragsdale Drive,' Suite 100 Monterey, CA 93940 Hardcopy Format: U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 John Reynoso NRC Acting Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 m Pacific Gas tBJtJBd Electric Comparay
PG&E Letter DCL-2016-518 April 27, 201e,. John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 PG&E Diablo Canyon Power Plant (DCPP) Receiving*Water Monitoring Program 2.015 Annual Report Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2015 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2015. Per prior agreement, no analysis or interpretation of the data was performed.
Tables in the appendices provide summary statistics for each program task. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or th<;>se persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility.of fine and imprisonment for knowing violations.
If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Bryan Cunning.ham at (805) 545-4439.
Paula A. Gerfen {) Station Director-Diab/a Canyon Power Plant 2016518/jlk/bkc Enclosure (1)
PG&E Letter DCL-2016-518 John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board April27,2016 . Page 2 cc w/enclosure:
PDF Formatted Electronic File Copy: Regional Administrator, Region 9 U.S. Environmental Protection Agency .75 Hawthorne Street San Francisco, CA 94105 Attention:
Water Division California Department of Fish and Wildlife Marine Region 20 Lower Ragsdale Drive,' Suite 100 Monterey, CA 93940 Hardcopy Format: U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 John Reynoso NRC Acting Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511