L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019
ML20062J099
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/02/2020
From: Zawalick M
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
DIL-20-003
Download: ML20062J099 (1)


Text

Pacific Gas and Electric Company*

Maureen R. Zawalick Diablo Canyon Power Plant Senior Director Mail code 104/6/608 Generation Regulatory, P.O. Box 56 Risk Management, and Avila Beach, CA 93424 Decommissioning 805.545.4242 Internal: 691.4242 March 2, 2020 PG&E Letter DIL-20-003 ATTN: Document Control Desk 10 CFR 72.44(d)(3), 10 CFR 72.4 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Materials License No. SNM-2511, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for 2019

Dear Comm issioners and Staff:

Pursuant to 10 CFR 72.44(d)(3) and 10 CFR 72.4, Pacific Gas and Electric Company hereby submits the 2019 Annual Radioactive Effluent Release Report for the Diablo Canyon Independent Spent Fuel Storage Installation (DC ISFSI).

For calendar year 2019, there were no releases of radionuclides to the environment in liquid or gaseous effluents due to operation of the DC ISFSI. The basis for this statement is documented in the DC ISFSI Updated Final Safety Analysis Report. Specifically, the all-welded construction of the DC ISFSI multi-purpose canisters precludes the release of liquid, gaseous, or solid effluents from the HI-STORM 100 System.

Pursuant to 40 CFR Part 190, direct radiation from sources associated with the Diablo Canyon Power Plant (DCPP) operating units and the DC ISFSI are monitored. Sources of direct radiation from DCPP and the DC ISFSI are reported in the DCPP Annual Radioactive Effluent Release Report, which is prepared in accordance with 10 CFR 50.36a(a)(2).

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Dave Cortina at (805) 545-3517.

armb/4743/50941662-06 cc: William C. Allen, NMSS Project Manager John Reynoso, NRC Resident Inspector Diablo Distribution A member of the STARS All ia nce Callaway

  • Diab l o Canyon
  • Pa l o Verde