DCL-04-038, Annual Technical Specification 5.6.1 Report

From kanterella
Jump to navigation Jump to search
Annual Technical Specification 5.6.1 Report
ML041140361
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/16/2004
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-038
Download: ML041140361 (4)


Text

Pacifc Gas and

.1P Electric Company James RIBecker Diablo Canyon Power Plant Vice President-Diablo Canyon PO. Box 56 Operations and Station Director Avila Beach, CA 93424 805.545.3462 April 16, 2004 Fax: 805.545.4234 PG&E Letter DCL-04-038 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 2003 Annual Technical Specification 5.6.1 Report

Dear Commissioners and Staff:

In accordance with Technical Specification (TS) 5.6.1, "Annual Reports,"

Pacific Gas & Electric Company is submitting the annual tabulation of exposure to radiation for Diablo Canyon Power Plant Units, I and 2, for 2003.

TS 5.6.1 requires an annual report that includes a tabulation of the number of station, utility, and other personnel receiving exposure greater than 100 millirem per year, and their associated exposure according to work and job function. The information is provided in accordance with the standard format of Regulatory Guide 1.16.

snf/4509/R0246451 Enclosure cc: Bruce S. Mallett David L. Prouix Girija S. Shukla Diablo Distribution 7 ~6' A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Pacific Gas and Electric Company Enclosure Diablo Canyon Power Plant PG&E Letter DCL 04-038 Units 1 and 2 Standard Format for Reporting Number of Personnel and Man-Rem by Work and Job Function Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2 Annual Tabulation of Exposure to Radiation for 2003

Pacific Gas and Electric Company PG&E Letter DCL 04-038 Diablo Canyon Power Plant Date: April 16, 2004 Units 1 and 2 Regulatory Guide 1.16 Report for Year: 2003 Standard Format for Reporting Number of Personnel and Man-Rem by Work and Job Function NUMBER OF PERSONNEL*

(>100 MREM) TOTAL MAN-REM WORK AND JOB FUNCTION Station Utility Contract Workers Station Utility Contract Workers (PERSONNEL GROUPING) Employees Employees & Others Employees Employees & Others Reactor Operations

& Survelllance Maintenance 0 0 1 0.000 0.000 0.006 Operating 11 0 0 0.309 0.000 0.000 Health Physics 0 0 0 0.000 0.000 0.000 Supervisory 0 0 0 0.000 0.000 0.000 Engineering 2 0 0 0.064 0.000 0.000 Routine Maintenance Maintenance 67 2 108 2.260 0.052 2.392 Operating 18 1 1 0.129 0.009 0.008 Health Physics 22 0 8 0.848 0.000 0.300 Supervisory 1 0 0 0.003 0.000 0.000 Engineering 17 1 1 0.334 0.015 0.001 Inservice Inspection Maintenance 4 0 16 0.239 0.000 1.219 Operating 2 0 0 0.249 0.000 0.000 Health Physics 0 0 0 0.000 0.000 0.000 Supervisory 0 0 0 0.000 0.000 0.000 Engineering 7 1 0 0.916 0.085 0.000 Special Maintenance Maintenance 27 1 2 3.050 0.001 0.185 Operating 0 0 0 0.000 0.000 0.000 Health Physics 10 0 0 0.311 0.000 0.000 Supervisory 0 0 0 0.000 0.000 0.000 Engineering 4 0 0 0.134 0.000 0.000 1

Pacific Gas and Electric Company PG&E Letter DCL 04-038 Diablo Canyon Power Plant Date: April 16, 2004 Units I and 2 Regulatory Guide 1.16 Report for Year: 2003 Standard Format for Reporting Number of Personnel and Man-Rem by Work and lob Function NUMBER OF PERSONNEL*

(>100 MREM) TOTAL MAN-REM WORK AND JOB FUNCTION Station Utility Contract Workers Station Utility Contract Workers (PERSONNEL GROUPING) Employees Employees & Others Employees Employees & Others Waste Processing Maintenance 9 0 5 0.065 0.000 0.011 Operating 0 0 0 0.000 0.000 0.000 Health Physics 11 0 1 1.663 0.000 0.160 Supervisory 0 0 0 0.000 0.000 0.000 Engineering 0 0 0 0.000 0.000 0.000 Refueling Maintenance 73 4 254 17.783 0.650 65.328 Operating 22 1 1 3.963 0.176 0.130 Health Physics 23 0 13 5.059 0.000 2.843 Supervisory 1 0 0 0.387 0.000 0.000 Engineering 22 1 3 4.345 0.001 0.618 Total Maintenance 180 7 386 23.397 0.703 69.141 Operating 53 2 2 4.650 0.185 0.138 Health Physics 66 0 22 7.881 0.000 3.303 Supervisory 2 0 0 0.390 0.000 0.000 Engineering 52 3 4 5.793 0.101 0.619 Grand Total 353 12 414 42.111 0.989 73.201

  • The "Number of Personnel" listed in the upper section of the table, are the number of personnel in the department receiving > 100 mRem. However, their entire dose was not necessarily received on a single Job Function. The personnel may have received their dose from multiple Job Functions. Therefore, depending on how many jobs contributed to their dose, the same person may be counted multiple times in the lower "totals" section of the table.

2