Text

Pacific Gas and Electric Campany"'

PG&E Letter DCL-22-033 REIRS Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Dennis B. Petersen Station Director Diablo Canyon Power Plant Mail coda 104151502 P.O. Box 56 Avila Boach, CA 93424 805.545.4022 Internal: 691.4022 10 CFR 20.2206 Annual Report of Occupational Radiation Exposure for 2021 REIRS Project Manager:

On April 12, 2022, Pacific Gas and Electric Company (PG&E) submitted the Annual Report of Occupational Radiation Exposure for individuals monitored at Diablo Canyon Power Plant during the 2021 calendar year in accordance with 10 CFR 20.2206(c). The report was created in the electronic format specified in Regulatory Guide 8.7, Revision 4, "Instructions for Recording and Reporting Occupational Radiation Dose Data." The data file, "NRC20220412.dat," was submitted electronically on the Radiation Exposure Information and Reporting System (REIRS) web page.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions about the report, please contact Mr. Craig Sutton, Nuclear Radiation Protection Manager, at 805-545-4208.

Sincerely, Dennis B. Petersen armb/50942689-11 cc:

Natasha A. Greene, NRC Acting Senior Resident Inspector Samson S. Lee, NRC Project Manager Scott A. Morris, NRC Region IV Administrator NRC Document Control Desk Diablo Distribution A me mbe r of t he STARS Allianc e Cal laway