Letter Sequence RAI |
---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) TAC:ME7523, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13232A263, ML13339A428, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI ML12240A0752012-08-27027 August 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-083, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement2012-09-11011 September 2012 Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement Project stage: Response to RAI ML12242A2562012-09-25025 September 2012 8/22/12 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12276A0502012-10-10010 October 2012 Regulatory Audit Plan for 11/13-16/2012 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request Project stage: Other ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 Project stage: Withholding Request Acceptance ML12284A4452012-10-16016 October 2012 Summary of 9/19/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML13004A4742012-10-24024 October 2012 Document 993754-1-915(NP), Rev. 1, Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis. Project stage: Request ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12297A2432012-10-31031 October 2012 Summary of 10/17/2012 Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement2012-11-27027 November 2012 Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement2012-12-0505 December 2012 Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12361A3602013-01-10010 January 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2012-04-11
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24250A0532024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24065A1312024-03-20020 March 2024 ISFSI Renewal RAI Transmittal Letter ML24065A1332024-03-20020 March 2024 Enclosure- Diablo Canyon ISFSI Renewal Request for Additional Information ML24024A2072024-01-24024 January 2024 Inservice Inspection Request for Information IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) ML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information ML23159A2372023-07-25025 July 2023 ISFSI Renewal RAI Transmittal Letter Enclosure ML23159A2382023-07-25025 July 2023 Request for Additional Information for the Technical Review of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2022-RNW-0007) ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23047A0062023-02-21021 February 2023 Request for Additional Information Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Public Version) ML23041A1862023-02-17017 February 2023 Request for Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - December 8, 2022, Public Meeting ML22258A1112022-09-14014 September 2022 2022 Diablo Canyon PIR Request for Information ML22200A2572022-07-19019 July 2022 Notification of In-service Inspection (Inspection Report 05000323/2022004) and Request for Information ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22152A1502022-06-21021 June 2022 Request for Additional Information Regarding License Amendment Request for Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22122A1412022-05-0505 May 2022 .02 Doc Request ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21363A1692021-12-29029 December 2021 Inservice Inspection Request for Information ML22019A0412021-12-29029 December 2021 RFI ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) ML19262G7482019-08-0909 August 2019 Request for Information ML19149A6012019-05-28028 May 2019 NRR E-mail Capture - Request for Additional Information (Supplemental) - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19123A2162019-05-0202 May 2019 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant -Request for Exemption from Operator Written Examination and Operating Test - Request for Additional Information ML19084A2572019-03-21021 March 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information ML17306A9382017-11-0202 November 2017 NRR E-mail Capture - Request for Additional Information - Request for Approval for Application of Full Weld Overlay REP-RHR-SWOL, Diablo Canyon Power Plant, Units 1 and 2 ML17152A3192017-06-0101 June 2017 NRR E-mail Capture - Request for Additional Information (RAI)- Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (CAC Nos. MF9386 Through MF9390) ML17102B6072017-04-12012 April 2017 NRR E-mail Capture - Request for Additional Information (RAI) - Revised Emergency Action Level Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16347A0032016-12-0909 December 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Diablo Canyon Power Plant License Amendment Request for Adoption of NEI 94-01 ML16326A3562016-11-21021 November 2016 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Adopt Nuclear Energy Institute (NEI) 94-01, Revision 2-A for Diablo Canyon Power Plant, Units 1 and 2 - CAC Nos. MF7731 and MF7732 ML16048A2322016-02-17017 February 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Met Data Second Round of Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 (TAC Nos. MF6399 and MF640 ML16011A3652016-02-0202 February 2016 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application - Set 39 (TAC Nos. ME2896 and ME2897) ML16011A3172016-01-11011 January 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 ML15358A0022015-12-23023 December 2015 Request for Additional Information Email (Follow-up Pra), Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15357A3822015-12-23023 December 2015 Request for Additional Information, Round 4 - Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review ML15287A1652015-10-23023 October 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review - SAMA 2024-09-06
[Table view] Category:Letter
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 12, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM (TAC NOS. ME7522 AND ME7523)
Dear Mr. Halpin:
By letter dated October 26, 2011, as supplemented by letters dated December 20, 2011, April 2, April 30, June 6, August 2, September 11, November 27, and December 5,2012, and March 25, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 113070457, ML113610541, ML 12094A072, ML 12131A513, ML12170A837, ML 12222A094, ML 12256A308, ML 13004A468, ML 12342A149, and ML 13093A311 respectively), Pacific Gas and Electric (PG&E, the licensee), requested the U.S. Nuclear Regulatory Commission (NRC) staff's approval of an amendment for the Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP). The proposed license amendment request would provide a digital replacement of the Process Protection System (PPS) portion of the Reactor Trip System and Engineered Safety Features Actuation System at DCPP. The NRC staff has reviewed the information provided by the licensee and determined that additional information is needed to complete its review. Enclosed is a request for additional information (RAI) for your consideration and response.
Please note that review efforts on these tasks (TAC Nos. ME7522 and ME7523) are continuing and additional RAls will be submitted.
These RAls were discussed with the licensee during recurring public meetings reviewing submittal open items most recently held on February 20 and March 27,2013. It was agreed that a formal response will be provided 30 days from the date of this letter. The NRC staff has determined that no security-related or proprietary information is contained in the RAls.
E. Halpin -2 If you have any questions regarding this matter, I may be reached at 301-415-5430.
Sincerely, James T. Polickoski, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
As stated cc w/encl: Distribution via Listserv REQU EST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST FOR DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-275 AND 50-323 By letter dated October 26, 2011, as supplemented by letters dated December 20, 2011, April 2, April 30, June 6. August 2. September 11, November 27. and December 5, 2012, and March 25, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 113070457, ML 113610541, ML 12094A072, ML12131A513, ML 12170A837, ML 12222A094.
ML 12256A308, ML13004A468, ML12342A149, and ML13093A311 respectively), Pacific Gas and Electric (PG&E, the licensee), requested the U.S. Nuclear Regulatory Commission (NRC) staff's approval of an amendment for the Diablo Canyon Power Plant. Unit Nos. 1 and 2 (DCPP). The proposed license amendment request would provide a digital replacement of the Process Protection System (PPS) portion of the Reactor Trip System and Engineered Safety Features Actuation System at DCPP. The NRC staff has reviewed the information provided by the licensee and determined that the following additional information is needed to complete its review. Each request for additional information begins with a reference to an Open Item (01). The 01 number that follows corresponds to the number of the item in the open item table that the NRC staff discussed with the licensee during periodic public meetings mostly recently held on February 20 and March 27, 2013. As the previous RAlletter (dated August 7,2012; ADAMS Accession No. ML 12208A364) requested additional information for 20 open items numbered sequentially, this letter will commence with RAI question number 21 to maintain clarity in the tracking of these multiple information requests: (Ols 21 and 35) Software Test Plan -Westinghouse/CS Innovations (CSI) document 6116-00005, "Diablo Canyon PPS System Test Plan," states that the Advanced Logic System (ALS)-102 Field Programmable Gate Array (FPGA) design is changed for the DCPP PPS. Further, Section 5.3.3 states "Test as many of the ALS-102 requirements as possible." Please identify what document describes the design verification test for this board. The scope of Revision 1 of document 6116-00005 is different from the scope described in Revision 0 of that same document.
For example, Section 1.2 in both Revisions states that test coverage includes all ALS modules, backplane, license sense modules (LSM), and ALS service unit (ASU). However, Section 2 is different between Revisions 0 and 1. Revision 1 only focuses on ALS-102 and backplane assemblies and does not include the other ALS modules, LSM, and ATU as in Revision O. Please explain why these other ALS modules are not included in Section 2 of Revision 1. Enclosure
-2 (0138) Software Management Plan -PG&E document "PPS Replacement Concept, Requirements, and Licensing Phase 1 Project Plan," Revision 1 (Attachment 3 of the license amendment request [LARD, Section 2, "Project Organization" does not describe the activities to be performed by the Engineering of Choice Design Change Package Team. Additionally, this document does not clarify the roles and responsibilities for this team. Please clarify and provide the applicable PG&E control document that describes PG&E roles and responsibilities specifically for the Engineering of Choice Design Change Package Team. (01 39) Software Management Plan -Figure 2-1 of the PG&E document, "PPS Replacement Concept, Requirements, and licensing Phase 1 Project Plan," and Figure 3-1 of the PPS System Quality Assurance Plan (SyQAP) identify "Altran" under the PG&E Project Engineering box. However, Figure 4-1 of the PPS System Replacement Verification and Validation Plan (SyWP) identifies the "PG&E project team" under the PG&E Project Engineering box. Please provide a description of the roles and responsibilities for "Altran" and the "PG&E project team" during the PPS Replacement Project. (0141) Software Verification and Validation (V&V) and Test Plan -Westinghouse/CSI document 6116-00005, "Diablo Canyon PPS System Test Plan." Revision 1, Section 8.2 identifies the software tools to be used in the PPS replacement project. However. this list is not consistent with the list of Independent Verification and Validation (IV&V) tools identified in Section 3.6 of ALS W Plan, document 6002-00003.
Specifically.
the test tools identified in 6002-00003 are not listed in 6116-00005 and vice versa. For example. the W Plan (6002-00003) identifies Automated Test Equipment (ATE) tool for IV&V, but this tool is not listed in 6116-0005, Revision 1. Furthermore, the NRC staff reviewed 6116-0005, Revision 0 and found that the ATE tool was listed in this version. Please clarify what software tools will be used and what document describes them. (0142) Software V&V -The PG&E "PPS System Replacement Verification and Validation Plan (SyWP)" does not describe the V&V activities to be performed during the Operation Phase and Maintenance Phase. This document states that these activities are covered by approved DCPP procedures.
Please identify these procedures. (0143) Software V&V -PG&E "PPS System Replacement System Verification and Validation Plan (SyWP)," Section 5.1.1, explains that during the Concept Phase, PG&E will verify system requirements in accordance with PG&E procedure CF2.ID9, "Software Quality Assurance for Software Development." However, the NRC staff's understanding is that procedure CF2.ID9 is for in-house development of software applications.
Please explain how this procedure is going to be used to verify the system requirements for the DCPP PPS replacement project. Furthermore, Section 5.1.2 of procedure CF2.ID9 states that an independent review of the functional requirements prepared during the Concept Phase would be performed.
The PG&E SyWP does not identify this review, and thus there is no specific V&V
-3 product for this phase. Please identify who will perform this review and if this review is considered a V&V product. (0146) Software V&V -Several sections in the Invensys document 993754-1-802, "Software Verification and Validation Plan (SWP)" reference "applicable Project Procedure Manual (PPM)" to perform certain activities.
The Reference section in this document only identifies "PPM" (see Reference 2.4.4). It is not clear if the PPM is constituted by several procedures or if it is only one procedure.
For example, Section 1.1, states the SWP was prepared in accordance with PPM 7.0 (Ref. 2.4.4), and then Section 4 states that V&V activities will be planned and scheduled in accordance with the applicable PPM. Please describe what the PPM is, and explain how this is going to be used in the PPS replacement project. (0147) Software V&V -Invensys Document No. 993754-1-802, "Software Verification and Validation Plan" requires the use of V&V metrics to evaluate software development process and products.
This section does not explain what methods and criteria will be used for software safety metrics. The need for and importance of this information is described in NRC Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants"; RG 1.173, "Developing Software Life Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"; Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1061, "Software Quality Metrics Methodology";
and IEEE Standard 1074, "Developing Software Life Cycle Processes." Please provide this information. (0149) Software V&V -Invensys Document No. 993754-1-802, "Software Verification and Validation Plan," Section 6.3 states that the Invensys personnel prepared the System Deficiency Integration Report (SDIR) to document non-conformances and corrective actions during testing, and that the SDIR is prepared in accordance with PPM 10.0. Please explain what PPM this is. Furthermore, the Invensys "Validation Test Plan," Section 5.4.2 states that the Test Review Board and PG&E shall review SDIRs, but this is not indicated in the Invensys V&V plan. Please explain why this review activity is not identified as a V&V task in the V&V Plan. (0150) Software V&V -The Invensys document "Validation Test Plan," Section 8.2, states that the Narrative Test Logs are used to document conduct of testing and any anomalies that occur. Please explain if the Narrative Test Logs are used only during validation, and why this is not mentioned in the Invensys SWP. Furthermore, please explain how the Narrative Test Logs are used in conjunction with Document Review Comment Sheet (DRCS) and System Deficiency Integration Report (SDIR). (01 51.1.a) Software Configuration Management
-In 01 4, the NRC staff requested the description of the software configuration management activities for configurable boards (e.g., ALS FPGA-102 board). Since the ALS FPGA-102 board is customer-specific to the PG&E design, its configuration management activities are not covered by the "ALS
-4 Configuration Management Plan." Even though item 4 is closed, this request was not addressed in the response to item 4. Please complete the response to 01 4. (01 51.1.b) Software Configuration Management
-The PG&E Software Configuration Management Plan (SCMP) SCM 36-01, item 1.2.8, states that ALS board has two sets of Non-Volatile Random Access Memory (NVRAM). Furthermore, this item explains that the configuration of the NVRAM can be changed only by removing the subject board from the ALS chassis and inserting it into a special test fixture. It is not clear who controls the NVRAM configuration process. Please explain. (01 51.1.c) Software Configuration Management
-Section 1.2 of the Invensys Document No. 993754-1-909, "Software Configuration Management Plan," states that this plan controls the operating system of the computers used to run TriStation 1131 and the signal simulation software used for testing purposes.
However, the description provided throughout the plan only focuses on the configuration activities for the Test Software Application Program (TSAP) and not for the TriStation 1131 (e.g., Section 2.3 states that the software configuration management (SCM) procedures are for the TSAP). Furthermore and later in this same section identifies the software configuration to be managed, and this list does not include the operating system of the computers used to run TriStation 1131 and the signal simulation software used for testing purpose. Please clarify the scope of this plan and how the configuration of TriStation 1131 and the signal simulation software is managed. (01 51.3.b) Software Configuration Management
-Section 3.2.4.7 of the SCM 36-01 states that PG&E uses an SAP order to track changes, but the same Section 3.2.4.7 also states that both the Change Package and an SAP order are entered in the Record Management System to track changes. Additionally, Section 3.3 describes a Configuration Status Account, which is used to track changes of configuration items. Please clarify and describe what PG&E uses to track changes. (0155) Final Safety Analysis Report (FSAR) -PG&E Letter DCL-12-050 dated June 6, 2012, "Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement," Attachment 2, "Final Safety Analysis Report Changes for Process Protection System Replacement," FSAR Section 7.1.2.5, "Conformance with Other Applicable Documents" (page 7.1-13) does not indicate that the NRC Safety Evaluation, that is, the NRC staff's basis for the potential approval of the PPS LAR, will be incorporated into this documentation.
The staff's Safety Evaluation Report (SER) should become part of the DCPP licensing basis once it is issued. Please explain how the SER for the PPS LAR will be documented within the FSAR. (0156) Final Safety Analysis Report -PG&E Letter DCL-12-050 dated June 6,2012, "Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement," Attachment 2, "Final Safety Analysis Report Changes for Process Protection System Replacement," FSAR Section 7.2.1.2, "Design Basis Information" (page 7.2-23) states that the evaluation for common mode failure in the PPS is presented in the DCPP PPS Diversity and Defense-in-Depth (D3) Licensee Topical Report (LTR) and approved in the NRC staff's SER for the DCPP PPS D3 LTR.
-5 It is noted, however, that this NRC staff 03 SER states that the 03 design features were approved based on confirmation that the proposed built-in diversity of the ALS system is found to be acceptable.
This confirmation will be performed as part of the forthcoming DCPP PPS SER. Please confirm that a reference to the SER for the DCPP PPS will be included in the FSAR. (0157) Final Safety Analysis Report -PG&E Letter DCL-12-050 dated June 6,2012, "Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement," Attachment 2, "Final Safety Analysis Report Changes for Process Protection System Replacement," FSAR Section 7.2.2.2.9.2, "IEEE 603-1991 Clause 5, System," Clause 5.12, "Auxiliary Features" (page 12) states that"... the communication path between the maintenance workstation and the ALS subsystem is normally disabled with a hardwired switch ... " Also, Attachment 3, "PG&E PPS Interface Requirements Specification (IRS)," Revision 6 to PG&E Letter DCL-12-069 dated August 2, 2012, states in Section 1.5.6 .....TAB communications between the ALS and Maintenance Work Station (MWS) takes place via RS-485 data link. The TAB is physically disconnected from the MWS when the TAB is not in use ... the TAB is open at all times unless maintenance is being performed on the ALS ... " Please identify administrative controls and design features associated with the PPS that are used to control how the MWS is disconnected/disabled from the PPS. (0158) CSI Failure Modes and Effects Analysis (FMEA) -There are several failure modes identified in Table 4-4 of the CS Innovations Document 6116-00029, "Diablo Canyon PPS ALS Reliability Analysis and FMEA" where the System Effects entry provides a description of functions that are not affected by the failure mode identified, instead of stating what the effects of the failure mode are. For example, the System Effects in the Energize to Trip (ETT) failure in line 5b of table 4-4 are that the Alarm Function remains operational.
Though this may be the case, it does not state what the effects of the failure mode are. Other examples of this can be found in lines 5b, 6a, 6b, 7a, 9h, 9i, 1'1 b, 11c, and 11d. Please provide appropriate and complete information for System Effects in Table 4-4. (0160) Technical Specifications
-In order for the NRC staff to make a determination that the existing technical specifications and surveillance intervals remain acceptable for the replacement PPS system, an evaluation to compare the ALSlTricon PPS system reliability and performance characteristics with those of the Eagle 21 system must be performed by PG&E. Please provide an evaluation summary report to support the application of existing technical specification and surveillance test intervals to the upgraded ALSlTricon based PPS. This summary report is expected to include a quantitative analysis to demonstrate the new system's ability to perform its required safety functions between established surveillance test intervals.
This report should also include a qualitative (i.e., deterministic) analysis which describes the self-diagnosis and fault detection features of the replacement PPS. In addition, this summary report should address the NRC staff's previous findings in Section 4.3, "Applicability of WCAPs ['Westinghouse Commercial
-6 Atomic Power' reports] to DCPP," of Amendment No. 179, dated January 31, 2005 (ADAMS Accession No. ML050330315). (01 64) Software Management Plan -To close Items 27 and 29, PG&E issued the DCPP PPS Project Quality Assurance Plan to define the oversight activities to be performed during the PPS replacement project. Section 2 of this plan describes the responsibilities of those involved in oversight activities.
However, it is not clear how these roles and responsibilities correlate to the project organization described in PG&E PPS Replacement Plan (Attachment 3 of the LAR) and PG&E PPS Replacement System Quality Assurance Plan (Attachment 4 of the LAR). For example, the Project Quality Assurance Plan describes the responsibilities of the "PPS replacement" Project Manager, but this role is not described in other documents.
Furthermore, the responsibility described seems to align with the responsibility of the "PG&E" Project Manager. Please explain the relationship, if any, of the roles and responsibilities described in the DCPP PPS Project Quality Assurance Plan and those provided in other PG&E plans. (01 66) -Section 4.2.13.1 of the LAR (page 85) states, " ... The NetOptics port aggregator tap device (Port Tap) was approved previously by NRC for a similar application in the Oconee Reactor Protection System (RPS)/(Engineered Safeguards Protection System (ESPS) SER Section 3.1.1.4.3.
The NRC staff determined that due to the electrical isolation provided by use of fiber optic cables and the data isolation provided by the Port Tap and the Maintenance and Service Interface (MSI) in the Oconee RPS, there was reasonable assurance that a fault or failure within the Oconee Gateway computer or the Operator Aid Computer will not adversely affect the ability of the Oconee safety protection system to accomplish its safety functions." The Tricon V10 topical report safety evaluation also approved the NetOptics Port aggregator Tap, Model 96443, No. PA-CU, or PAD-CU, as an acceptable data isolation device. Please verify that the model number of the Port Tap that PG&E will use in the DCPP PPS is the same as Model 96443 and provide an explanation of its equivalency to the Port Tap approved for the Oconee RPS/ESPS LAR. (01 67) -Section 4.2.13.1 of the DCPP PPS LAR (page 85) states that the "Port aggregator dual in-line package (DIP) switch positions will be controlled by DCPP configuration management processes." Please provide a documented basis (e.g., a plant procedure, or engineering design package) that demonstrates how DIP switch positions will be controlled. (01 72) KVM Switch Question 3 -The KVM (keyboard, video, mouse) switch brochure indicates that there are other features and ports that may not be used for the DCPP PPS safety system. Please enumerate which features will not be used for the DCPP PPS application and explain how these unused features, such as the audio interface, unused USB (universal serial bus) ports, and remote control/channel switching by external
-7 control, will be disabled and how configuration control will be maintained for these disabled features. (0173) KVM Switch Question 4 -This question is related to RAI # 46 and may be answered in conjunction with that RAI response if desired. Please explain how a KVM switch failure that permits data flows between the two platforms (Tricon V1 0 and ALS), would not corrupt the safety function of the Tricon V1 0 and ALS systems. If the safety function for one or both platforms is affected by the KVM switch failure, then explain how the PPS will still perform its safety functions in light of these failures.
If the KVM switch failure will not cause the platforms to fail then provide a detailed explanation of how the engineering design principals of the Tricon/ALS platforms physically prevent bad/erroneous data from corrupting the platforms.
More directly, explain how these erroneous messages emanating from the MWS (regardless of origin) will be disregarded/rejected by the Tricon/ALS platforms. (01 76) Tricon V10 platform changes/software revisions
-The documents listed below are necessary for the NRC staff to complete its assessment of the Tricon V1 0 platform changes and software Revisions that have occurred since the platform was approved generically, and will be applied to the DCPP PPS: Product Discrepancy Report (PDR) IRTX#21105 Technical Advisory Bulletin (TAB) 183 Engineering Project Plan (EPP) V1 0.5.2, 9100346-001, Rev. 1.4 Tricon V1 0.5.2 V&V Test Report, Revision 1.1, January 14, 2011 Software Release Definition (SRD) V10.5.2, 6200003-226, Revision 1.0 PDR I RTX#22481 Product Alert Notice (PAN) 25 Document "ARR 932 NSC Evaluation . pdf' Tricon PAN 25 Fix Engineering Project Plan (EPP) 9100428-001, Revision 1.2 Tricon PAN 25 Master Test Report, Rev.1.0 Software Release Definition (SRD) V1 0.5.3, 6200003-230, Revision 1.0 Product Alert Notice (PAN) 22 Product Alert Notice (PAN) 24 Technical Advisory Notice (TAB) 147 Engineering Project Plan (EPP) TriStation V4.9 & Safety Suite Apps, 001, Revision 1.3 TriStation V4.9.0 Test Report, Rev. 0.4 Software Release Definition (SRD) 6200097-038, Revision 1.2 (01 68) Data communication with NSR (nonsafety-related)
Gateway -Figure 4-13 (page 87) of the LAR indicates that data communications are provided directly between the SR (safety-related)
ALS "A" & ALS "B" Protection Sets I, II, III, and IV, and the NSR Gateway Computers via RS-422 copper media (i.e., not through the Port Tap). Section 4.8.2.b) (page 110 of the LAR) states that "".AII other communication to non-safety equipment, i.e., Plant Computer, is via continuous one-way communication channels on the ALS-1 02." Please describe how Class 1 E/non-Class 1 E data communication and electrical isolation is implemented within the ALS portion of the PPS for this
-configuration.
Also, please explain how the Gateway computer and the Gateway Switch communication protocols will not corrupt the data signals coming from the ALS Protection Sets 1-4 and not impact the execution of the ALS safety function.
Please provide a detailed response to this question in either the revised LAR or supporting documents.
In addition, please explain how the ALS "An &"B" inputs to the NSR Gateway computers are isolated from each other, and explain the data communication protocols associated with processing this data within the Gateway Computers.
Furthermore, please provide a detailed functional description of the DCPP PPS NSR Gateway Computer{s) system, including computers/processors, communications protocols, and data isolation details. Provide an explanation of the Gateway Switch discussed within the LAR (Fig. 4-13), including its operating principal (hardware, logic based, etc.), data/electrical isolation design features, and any other pertinent information pertaining to its failure mechanisms. (0169) Application programs within the MWS computers
-Please provide an explanation of the application programs contained within the Tricon and ALS MWS computers.
Include how these programs will be used to support or enhance the performance of the PPS safety function as discussed in Staff Position 1, Point 3 of ISG (Interim Staff Guidance )-04. (0170) KVM Switch Question 1 -The KVM Switch brochure indicates on page 3 that the Enumeration Switching Process will not enable control switching using the USB keyboard or mouse. However, it further states that Emulation USB switching was developed to support these enhanced monitor switching functions/devices (keyboard hotkeys or mouse buttons).
Please explain if the Enumerated USB switching function will be used in the PPS design and, if so, if the keyboard hotkeys and mouse buttons will be used to perform switching between the Tricon MWS and the ALS MWS. Please clarify how the KVM switching function will be accomplished and controlled during PPS system operation and maintenance. (0171) KVM Switch Question 2 (Open Item 71) -Please explain if the KVM switch will be continuously on-line while the MWSs are monitoring data from either the Tricon or the ALS platform.
If so, please provide a failure modes and affects analysis to address potential failures of the KVM switch. Also, provide an explanation of how failures of the KVM switch are prevented from being propagated into the MWS computers, and hence into the Tricon or ALS safety system processors.
This analysis should delineate how communications through the KVM switch conform to ISG-04, Points 10 and 11. Provide design documentation to support this analysis, such as ALS-102 Design Specification document 6002-10202. (0174) KVM Switch Question 5 -Please explain in detail how connection between the MWS computers via the KVM switch will be prevented.
Please explain if this will be
-handled via a configuration control process, administrative controls, or a physical means of preventing connection between computers. (01 51.3a) Software Configuration Management
-Changes and Problems Identification PG&E document SCM 36-01 states that software, hardware, and configuration problems are reported in accordance with PG&E OM7.ID1 and that software and/or configuration problems are reported via a "PROG PDCM" Notification.
The NRC staff requires an understanding of when and how these processes are used. For example, for software problems, please clarify if the problem is reported using both PG&E OM7.ID1 and PROG PDCM notification processes.
Note that PG&E CF2.ID2 states that all problems associated with plant computer system should be reported and document per OM7.ID1 (See Section 5.11 and 5.16.10 (b) of CF2.ID2).
Furthermore, Section 3.2.1 of SCM 36-01 states that all PPS modifications should be initiated and tracked per plant procedures or CF4.ID1. Section 3.2.2 states that the implementation of the change is documented in the associated Change Package and an SAP notification and order. Section 3.2.10 states that all identified problems and corrective actions are documented using a "notification," which is not specified.
It is therefore unclear whether software modifications require reporting and tracking using OM7.ID1, CF4.ID1, "PROG PDCM" Notification, Change Package, and/or SAP Order. Please explain PG&E procedures for different changes and the documenting and tracking system used for all types of modification. (01 51.4a) Software Configuration Management
-Document Repository Section 2.3.3 of PG&E document SCM 36-01 identifies the Digital Systems Engineering SourceSafe as the repository to maintain the PPS configuration, system, firmware, and application source code, but Section 3.2.5.5 identifies http://dcpp142/idmws/home/asp.
Section 3.29 then states that the files necessary for recovery of the baseline are maintained in the PPS database in SC-I-36M, Eagle 21 Tunable Constants.
It is not clear if these three sections are referring to the same document repository.
Please clarify. (01 51.4b) Software Configuration Management
-Document Repository Access Restrictions PG&E has implemented restrictions to access files and documents associated with PPS replacement project. Furthermore, PG&E requires user authentication and access to edit configuration, software, and data. It is not clear if these restrictions apply for access to the Digital Systems Engineering SourceSafe or the repository in http://dcpp142/idmws/home/asp. Please clarify and explain the applicability of access restrictions.
E. If you have any questions regarding this matter, I may be reached at Docket Nos. 50-275 and 50-323 As cc w/encl: Distribution via Listserv DISTRI LPL4 RidsAcrsAcnw
_MailCTR RidsNrrDeEicb RidsNrrDorlLpl4 RidsNrrLAJBurkhardt RidsNrrPMDiabloCanyon RidsRgn4MailCenter
- RStattel, RAlvarado,
- SMakor, ADAMS Accession No. ML 13101A072 OFFICE ULPL4/PM NRRfDORULPL4/LA JBurkhardt*
iNAME 4/11/13 DATE Sincerely, IRN James T. Polickoski, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor
- via email **via memo dated NRRfDElEICB/BC NRRfDORLlLPL4/BC NRRfDORULPL4/PM JThorp** MMarkley JPolickoski 3/18/13 4/12/13 4/12/13 OFFICIAL RECORD COpy