Public Version of Procedure Temporary Sheet to Emergency Plan Procedure PMP 2081 EPP.020, Activation & Operation of Technical Support Ctr. Revised Index Encl
ML17326B078
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/17/1982
From: CAMPBELL D, SIMMS R, VINCE S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17326B077 List:
References
PROC-820917-01, NUDOCS 8210190040
Download: ML17326B078 (4)


Text

l AS%i'U~'~'O~

OI"+"'"~~0'2"~'QOg 3"'J This temporary sheet applies'.o Instruction or Procedure~~c.pap Revision No.1 Operation o-one iecnnicai 2OS1 EPP.020 ,:=4IPORA P Y The following change (X)instituted effective (Date)new requirement

()shall be t ADD: 4.3.4 Upon activation of-the EOF, Public Affairs personnel will move from the TSC to the EOF.Before leaving the TSC, the Public Affairs personnel will obtain copies of the chronological history log and give them to the Corrmunications Director upon their arrival to the EOF.In the event that the EOF is manned before the Public Affairs personnel report to the TSC, a runner from the OSA will be dispatched to the EOF with copies of the chronological history log.Reason: Provide history of the event to EOF personnel without having to tie up the dedicated test phones.This leaves the dedicated test phone open for transmittal of current key points concerning the event.ADD: 4.3.5 Note If there is not a release presently occurring or if the data used in the dose calculation is not considered as being reliable.Exhibit C must still be processed.

Exhibit C contains additional information (besides dos assessment information) that must be relayed to off-site agencies.Reason: Clarify a problem point identified during an emergency plan drill, This change should be made a permanent revision to the Instruction or Procedure:

o(YES cINO 0 NOT KNOWN, additional review required Expirati'on Date: Procedure Revision Originator:

Management Staff: Senior Reactor or: PNSRC Date Standard Dist.List No.: Distribution:

Form No.4330 RE ov'h'xl ro 82i0190040 82i00i WHITE-ORIGINAL PDR ADOCK 05000aiS, CANARY-ORIGINATOR COPY FORM No.PMI 20104 REV.2 I;F PDR c hN4\,k 5

~~~~~~~PMP EPP INDE'ONALD C.COOK i'iUCL"AR PLANT PLANT MANAGER PROCEDURE Index Ident, i f 1 ca ti on Number Title Revi s.or,.'lo..'nd Gate Comments PMP 2081 EPP.014 EPP.015 EPP.016 EPP.017 EPP.018 EPP.019 EPP.020 EPP.021 EPP.022 EPP.023 EPP.024 Off-Site Oose Assessments Sampling and Analysis of Waterborne Releases Collection and Analysis of Liquid and Gaseous Samples Interpretation of Liquid and Gaseous Samples Transportation Accidents Involving Radioactive Mater i al AEP Emergency Response Organization Activation and Management Activation and Operation of the Technical Support Center (TSC)Activation and Operation of the Operations Staging Aeea (OSA)and Personnel Accountabi 1 i ty Act&ation and Operation of the Emergency Operations Facility Activation and Operation of the Emergency Control Center (ECC)(An Emergency Operations Faci1 i ty)Activation and Operation of the Joint Public Information Center (JPIC)(An Emergency Operations Facility)Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 1 6-24-82 Revision 0 4-1-8$Revision 1 8-24-82 Revision 1 5-25-82 Revision 1 6-4-82 CANCELLEO-4-82 Revision 1 6-24-82 TP-1,2-25-82 Exp N/A TP-1,9-9-82 Exp NA 3