ML21055A204

From kanterella
Revision as of 10:54, 29 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II
ML21055A204
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A204 (1)


Text

4 I

j I

~

I l

VALVE LIMIT Sw'ITCH CONTACT DEVELOPMENT VAL VE POSITION CONTACT FULL FULL FUNCTION OPEN CLOSED BYPASS VLS OPENING VLS CLOSING VLS A

FDR X OPENING OPENING OPEN CLOSE CLOSING BY-PASS TORQUE Sw' LIMIT PB PB TORQUE Sw' BY-PASS B

SPARE D

IEl CONTACT IYl CONTACT D] CONTACT lx7 CONTACT A] CONTACT C

CLOSE LIGHT D

6 6

D OPENING LIMIT BYPASS

~~

~~

E FDR Y F

SPARE

\\

G OPEN LIGHT H

SPARE

,I,

~;3)

~~

X CLOSING TORQUE Sw'ITCH INTERRUPTS CONTROi CIRCUIT IF MECH OVERLOAD OCCURS DURING CLOSING CYCLE.

y OPENING TORQUE Sw'ITCH INTERRUPTS CONTROi CIRCUIT IF MECH OVERLOAD OCCURS DURING r

~

OPENING CYCLE.

I><

"'C><

I CONTACT OPEN CONTACT CLOSED I i LOCATION SYMBOLS MOTOR O.L.

VLS VLS 1251/4 CLOSE LIGHT OPEN LIGHT 6

IN CONTROL ROOM cl CONTACT GI CONTACT

~

~ !!,!J IN PUSHBUTTON AT CONTROLLED EQUIPMENT C

G R 0 DR DR C

i i

AT MCC CLOSE OPEN

-~

~

B r

ON <AD OFF (0)

ON (AC)

NOTE CLOSE OPEN CLOSE REFER TO DECO STANDARD Dw'G. GM-2290,SHT. 2, F Rw'ARD STARTER-REVERSE DETAIL 2 FDR EXPLANATION OF CONTROL PUSHBUTTONS.

VALVE FEEDER PANEL ITEM NO.

STARTER-STOP VALVE STARTER-IDENTIFICATION DIV CODE NO.

TAG NO.

MCC POS OPEN PB CLOSE P OPEN VALVE CLOSE VALVE 6

EEC'w' RETURN FROM DRY',..(LL II P4400F607B 7>C-3A 4C 2A225 2A226 VALVE NO. FROM TABLE ON SYSTEM DIAGRAM -

M-5357.

I 41721-2440-07 LATEST REVISION B

REFERENCE D\\v'GS, & DOCUMENTS 1-2070-1 LOGIC SYMBOLS AND LEGEND 1-2440-1, LOGIC DIAG-EECw' & EESw' SYSTEMS 1-2441-8 SCHM DIAG-EEC'w<:: VALVES -

AUTO OPEN SD-2512,:18 480 VAC MCCl72C-3A\\FRONTAL ELEV <FRT)

I B

I M-5357, PIPING DIAGRAM-RBCCw' & EEC'w SYSTEMS iB M-2001, LEGEND OF SYMBOLS & INSTR IDENTIFICA TlN 8

FOR PLANT SYSTEM DIAGRAMS I

1-2005-1, -2, ARRANGEMENT OF EQUIP ON PANEL Hll -P602 DECO DESIGN INSTRUCTION #29, EECw' SYSTEM 6M-2290, SHT. 2, STANDARD PANEL CONFIGURATIONS NUCLEAR SAFETY RELATED 1-2440-6, EMERG. EQPT. COOLING w'ATER SYSTEM VALVES -

AUTO OPEN, DIV. 2 LOGIC DIAGRAMS THIS IS AN AUTOCAD PRODUCED DRAWING.

CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING i

DESIGN GROUP TO ENSURE THAT CONFIGURATION I

CONTROL IS MAINTAINED.

I i

THIS DRAWING WAS REFORMATTED BY INC.CODE Detroit Edison Fermi 2 AUTOCAD AT REVISION A. ALL PREVIOUS APPROVAL SIGNATURES ARE TITLE ON FILE ON MICROFILM IN DOCUMENT u

LOGIC DIAGRAM CONTROL EMERGENCY EQUIPMENT COOLING WATER

~

DCD'S INCORPORATED:

PREPARED BY DATE A PORTION OF THIS DRAWING EDP 29183 REV. it, IS AFFECTED BY THE FOLLOWING, SYSTEM VALVE-DIVISION II TC CHANGE DOCUMENT A

A CHECKED BY

~*-

OTHER REVISIONS:

APERTURE CARD TITLE LOG DIAG EECW SYS VLV DIV II APPROVED BY DATE PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #

P4400.E2100 PREPARED BY h<Mlia,lg~g-97 7iil1,J1t-DATE DOCUMENT TYPE CODEDDDINC NUC OPS FILE NO.

DATE ISSUED TO IS (R<Yrv 9-t"l-17 q - L <l -G\\ 7 OTHER APPROVALS DATE 1801 APPROVED BY 1,-6.J Jv<*Sc.../1 DATE *-1 EDP POSTING ENTRIES REQUIRE THE DRAWING NUMBER REV.

I

/(rw-~

'f-1-f ADDmON OF THE ARMS STATUS CODE, 41721-2440-07 B

I EITHER "AFC" OR "ASB" 4

3 2

1