ML21232A017

From kanterella
Revision as of 17:06, 18 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting
ML21232A017
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/20/2021
From:
Florida Power & Light Co
To:
Plant Licensing Branch II
Marshall M
References
L-2021-LRM-0007
Download: ML21232A017 (31)


Text

Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 7th Pre-submittal Meeting Telecon August 23 and August 25, 2021 CLOSED MEETING 1 Non-proprietary information suitable for public disclosure

2 Non-proprietary information suitable for public disclosure Agenda - Closed Portion- Aug 23 and 25

  • Closed Session - Aug 23rd

- Components not Addressed in Approved SER

- Equipment Qualification and Dedication

- Human Factors Engineering Program Update

  • Closed Session - Aug 25th

- Application of Leak Detection in D3 Evaluation

- Command Prioritization

- Surveillance Reduction Activities

- Schedule Update

- Action Items and Follow-up 3 Non-proprietary information suitable for public disclosure

Components Not Addressed in Approved Tricon SER 4 Non-proprietary information suitable for public disclosure

Safety Video Display Unit (SVDU) 5 Non-proprietary information suitable for public disclosure

Proposed Nuclear Instrumentation Signal Processing 6 Non-proprietary information suitable for public disclosure

NIS Components (TXS) - Framatome GmbH 7 Non-proprietary information suitable for public disclosure

New Manufactured NIS Components - Framatome Inc.

end of topic 8 Non-proprietary information suitable for public disclosure

Equipment Qualification 9 Non-proprietary information suitable for public disclosure

Evaluation and Acceptance of Commercial Equipment for Safety Related Applications end of topic 10 Non-proprietary information suitable for public disclosure

Human Factors Engineering - Overview 11 Non-proprietary information suitable for public disclosure

Human Factors Engineering - Elements 12 Non-proprietary information suitable for public disclosure

Action Items and Follow-up for August 23rd Closed Meeting

  • Action Items and Follow-up 13 Non-proprietary information suitable for public disclosure

Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 7th Pre-submittal Meeting Telecon August 25, 2021 CLOSED MEETING 14 Non-proprietary information suitable for public disclosure

Agenda

  • Closed Session - Aug 25th

- Application of Leak Detection in D3 Evaluation

- Command Prioritization

- Surveillance Reduction Activities

- Schedule Update

- Action Items and Follow-up 15 Non-proprietary information suitable for public disclosure

Leak Detection Capability Analysis for PTN 3&4 D3 Report in Accordance with BTP 7-19, Rev 8 16 Non-proprietary information suitable for public disclosure

Leak Detection Capability Analysis for PTN 3&4 D3 Report in Accordance with BTP 7-19, Rev 8 17 Non-proprietary information suitable for public disclosure

Leak Detection Capability Analysis for PTN 3&4 D3 Report in Accordance with BTP 7-19, Rev 8 18 Non-proprietary information suitable for public disclosure

Leak Detection Capability Analysis for PTN 3&4 D3 Report in Accordance with BTP 7-19, Rev 8 Leak Detection Capability 19 Non-proprietary information suitable for public disclosure

Leak Detection Capability Analysis for PTN 3&4 D3 Report in Accordance with BTP 7-19, Rev 8 end of topic 20 Non-proprietary information suitable for public disclosure

Command Prioritization end of topic 21 Non-proprietary information suitable for public disclosure

Technical Specification Surveillance Reduction Update 22 Non-proprietary information suitable for public disclosure

Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Coverage Boundary 23 Non-proprietary information suitable for public disclosure

Tech Spec Surveillance Test Extension/Reduction For RPS/ESFAS/NIS LAR - Coverage Analysis end of topic 24 Non-proprietary information suitable for public disclosure

Framatome Lifecycle Project Schedule end of topic 25 Non-proprietary information suitable for public disclosure

Action Items and Follow-up for August 25th Closed Meeting

  • Action Items and Follow-up 26 Non-proprietary information suitable for public disclosure

Questions?

27 Non-proprietary information suitable for public disclosure

Acronym List Actuation Logic Testing ALT Alternate Review AR Branch Technical Position BTP Channel Operational Testing COT Diverse Actuation System DAS Defense-in-Depth and Diversity D3 Distributed Control System DCS Engineered Safety Features Actuation System ESFAS Failure Modes, Effects and Diagnostic Analysis FMEDA Florida Power and Light FPL Foxboro Intelligent Automation I/A Human Factor Engineering HFE Instrumentation and Control I&C 28 Non-proprietary information suitable for public disclosure

Acronym List (continued)

Institute of Electrical and Electronic engineers IEEE Interim Staff Guidance ISG Leak-Before-Break LBB License Amendment Request LAR Loss Of Coolant Accident LOCA Non-Safety Related NSR Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC Priority Logic Module PLM Quality Assurance QA Regulatory Guide RG Reactor Rx 29 Non-proprietary information suitable for public disclosure

Acronym List (continued)

Reactor Coolant System RCS Reactor Protection System RPS Safety Evaluation Report SER Safety Injection SI Safety Related SR Standard Review Plan SRP System Requirements Specification SyRS Safety Visual Display Unit SVDU Subsequent License Renewal SLR Turkey Point PTN Vendor Oversight Program VOP 30 Non-proprietary information suitable for public disclosure

Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.

This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations 31 Non-proprietary information suitable for public disclosure