MONTHYEARIR 05000333/20240902024-10-29029 October 2024 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090 IR 05000333/20244022024-10-28028 October 2024 Material Control and Accounting Program Inspection Report 05000333/2024402 (Cover Letter Only) IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 IR 05000333/20230052023-08-31031 August 2023 Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005) IR 05000333/20230022023-08-0707 August 2023 Integrated Inspection Report 05000333/2023002 IR 05000333/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000333/2023402 IR 05000333/20230112023-07-25025 July 2023 Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011 IR 05000333/20235012023-07-20020 July 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501 IR 05000333/20234202023-06-26026 June 2023 Security Baseline Inspection Report 05000333 2023420 IR 05000333/20230012023-05-0303 May 2023 Integrated Inspection Report 05000333/2023001 IR 05000333/20230122023-04-13013 April 2023 Quadrennial Fire Protection Inspection Report 05000333/2023012 IR 05000333/20220042023-03-20020 March 2023 Integrated Inspection Report 05000333/2022004 IR 05000333/20220062023-03-0101 March 2023 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2022006) IR 05000333/20220032022-11-10010 November 2022 Integrated Inspection Report 05000333/2022003 IR 05000333/20220052022-08-31031 August 2022 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2022005) IR 05000333/20220022022-08-10010 August 2022 Integrated Inspection Report 05000333/2022002 IR 05000333/20220102022-06-27027 June 2022 Reissued Design Basis Assurance Inspection (Teams) Inspection Report 05000333/2022010 ML22153A2612022-06-0202 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000333/2022010 IR 05000333/20210142022-05-23023 May 2022 Problem Identification and Resolution Inspection Report 05000333/2021014 IR 05000333/20220012022-05-0505 May 2022 Integrated Inspection Report 05000333/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2022001 IR 05000333/20210062022-03-0202 March 2022 Annual Assessment Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2021006) IR 05000333/20210042022-01-27027 January 2022 Integrated Inspection Report 05000333/2021004 IR 05000333/20210032021-11-0808 November 2021 Integrated Inspection Report 05000333/2021003 IR 05000333/20210402021-11-0808 November 2021 95001 Supplemental Inspection Report 05000333/2021040 and Assessment Follow-Up Letter IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 IR 05000333/20215012021-09-29029 September 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2021501 IR 05000333/20210052021-09-0101 September 2021 Updated Inspection Plan for the James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2021005) IR 05000333/20210132021-08-11011 August 2021 Biennial Problem Identification and Resolution Inspection Report 05000333/2021013 IR 05000333/20210022021-08-0303 August 2021 James A. Fitpatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2021002 ML21176A0052021-06-25025 June 2021 Acknowledgement of Dispute of Violations Associated with White Finding - NRC Inspection Report 05000333/2021090 IR 05000333/20214022021-06-0909 June 2021 Security Baseline Inspection Report 05000333/2021402 IR 05000333/20210112021-06-0303 June 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000333/2021011 IR 05000333/20210012021-05-0505 May 2021 Integrated Inspection Report 05000333/2021001 IR 05000333/20210122021-05-0404 May 2021 Temporary Instruction 2515/194 Inspection Report 05000333/2021012 IR 05000333/20210902021-04-20020 April 2021 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation: NRC Inspection Report 05000333/2021090 IR 05000333/20214012021-04-19019 April 2021 Material Control and Accounting Program Inspection Report 05000333/2021401 (Letter Only) IR 05000333/20210102021-04-0707 April 2021 Triennial Fire Protection Inspection Report 05000333/2021010 IR 05000333/20200062021-03-0303 March 2021 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2020006) 2024-09-19
[Table view] |
Text
U.S. NUCLEAR REGULATORY COMMISSION (NRC)
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE (NSIR)
INSPECTION REPORT Docket Number: 05000333 License Number: DPR-59 Report Number: 05000333/2020420 Enterprise Identifier: I-2020-420-0007 Licensee: Exelon Generation Company, LLC Facility: James A. FitzPatrick Nuclear Power Plant Location: Oswego, New York Inspection Dates: November 6, 2020, to November 17, 2020 Inspectors: C. Roundtree, Team Leader, NSIR J. Bream, Senior Physical Security Inspector, RI C. Bustamante, Security Specialist, NSIR P. Negrete, Security Specialist, NSIR Approved By: Steve R. Ruffin, Acting Chief Security Performance Evaluation Branch Division of Security Operations Enclosure
SUMMARY
The NRC continued monitoring the licensees performance by conducting an NRC inspection at
James A. FitzPatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process.
The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. For more information refer to:
https://www.nrc.gov/reactors/operating/oversight.html.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
92707 - Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited
- (1) NRC inspectors completed this inspection by gathering sufficient information to develop a scenario that can be segmented into limited scope tactical response drills that allows for a limited assessment of the ability of licensees physical security systems and security organization to meet the general performance objective of Title 10 of the Code of Federal Regulations 73.55(b) and to ensure changes made to the physical protection program in response to a local, State, or Federal emergency (e.g., state of emergency, disaster, or public health emergency) have not adversely impacted the licensees implementation of their protective strategy.
REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125701.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 17, 2020, the inspectors presented the NRC inspection results to Mr.
Patrick D. Navin, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or Date
Procedure
2707 Corrective Action Condition report AR 04383431, AR 04383426, AR 04383428
Documents summaries
Resulting from
Inspection
2707 Miscellaneous James
- A. Physical security plan, training and qualification plan, Revision 22, dated
FitzPatrick and safeguards contingency plan November 6, 2019
Nuclear Power
Plant
2707 Miscellaneous SY-AA-101-109 Response to contingency events Revision 15
2707 Miscellaneous SY-JF-101-501 Protective strategy Revision 7
2707 Miscellaneous SY-JF-101-502 Critical target sets Revision 03