MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
_ - , . . . . . _ _ . - -
i
, fI /
)
7 Y >
\ ,
June 30,1978
[ .a
- ~5
v; / C E MEMORANDUM FOR: W. C. Seidle, Chief, RC&ES Branch THRU: W. A. Crossman, Chief, Projects Section "
h)
- r. , r FROM: R. G. Taylor, Reactor Inspector, Projects Sect (bn g
SUBJECT:
COMANCHE PEAK HID-TERM QA INSPECTION 4 m DN 50-445; 50-446 -
By memorandum, dated March 7,1978, I proposed to conduct the rufemneed .
inspection in the June-July 1978 time frame. Your concurmnce was received,
-- H - and I scheduled the inspection for July 11-14, 1978 as inspection 78-12. n i
I now propose to postpone the inspection based upon the following technicaf and personal reasons: g
- a. Technical 1 5
as<
,.. Procedure 35200 mquires identification of substantive chadges in the.
licensee and/or contractor QA/QC organizations since last reviewed by -
NRR-QAB. As we are all aware, substantive changes have been made which h will not be reviewed by licensing until the at least Amendment two (2)
I to the FSAR is filed. If we conduct the inspection as scheduled, we would have to describe these changes and call them either unresolved or deviation items; ooth of which in varying degrees f@ly a briticism o,f, their actions. None of their actions on their organization changes ,
appear to warrant criticir,m to date and in fact appear to have only enhanced the effectiveness of their program. The other prpgransnatic ,
aspects of the inspectior. have been in varying degrees reviewed in ' ~
regular inspections to the extent they art applicable withithe possible exception of site originated procurement of which there is*1ittle thay is aafety related.
n.'
t
' i - -
0709010143 070827 kLIA -428 PDP.
co o,,,e, y R QMr i__
,,,,,,,, TayIr/nh Crossman p E V ,'
pave > . 5/ 30/7.8... ..5/M/R '
NRC FORM 518 (9 76) NRCM 0240 W us s. oovannuswr emnersne orrsea se7e-ase4sd
4
,. ;.....s
, ...=~
W. C. Seidle June 30, 1978
- b. Personal As of this date, I am planning on making the physical sove to the site area during the week beginning Monday, July 24. I have'not yet identified anything specific that.must be done in the week of July 11-14 to facilitate the move, but I'm sure that both sqy wife and I would be much more comfortable if I.wem not away during what will probably turn into a panic period. .
I would propose to conduct 35200 after the FSAR has been amended to cover the organizational changes and in unscheduled bits and pieces after I'm in residence at the site.
l Your concurrence to this proposal at the earliest.possible time is mquested.
i I
j s V l ll' . .
R. G. Taylor, Reactor Inspector i' Projects Section ,
i Concur Date W. C. Seidle i
vv hi ;
i k
l
' ) l{'l '
f:* ..,. .
1 1
i l
0 r,' b;.
% N/
e.
UNn LI> STATES
,:/g':~i h"Jv'a j NUCL E Af t REGUL. ATORY COMMISSION S taiaton tv )
j;g ,j;..k,ibg' d Gil HYAN PL AZA DHIVE, SulTE 1000 >
/ %, '.....f Anuoc, TON, TEX AS 70012 In Reply Refer To: November 2, 1979 l
{
RIV
{
Docket No. 50-445/Hpt. 78-13 50 446/npt. 78-18 Texas Util.i ties Generat in;; Company ATTN: Mr. R. J. Gary, Executive Vice President and General Mana;;cr 5 2001 Eryan Tower !
Dallas, Texas 75201 i
Gentlemen:
Thank you october 1, for your lot t( rs dated Naven.ber 16, 1978, December 20,1978, and j 1
December 8, 1979, in i e.u pon s e tu our lett ers dated October 20, 1978, and 1978. M. havo no furt her questions at this tina and will review your corrective action durinr, a future inspe ct ion. i Sincerely, ,
)
, j?(' ,. ll 4 fy (~)
,',f';r::
,.(f W. C. Seidle, Chief Reactor Construction and Engineering Support Branch f
{
i g Ill1*I.c '
ist
e nM% f UNI ri D S1 ATES A& @
p/ c, NUCI E AI: REGUL ATOHY COMMISSloN E
Sj,4 4 o
2 HLG'ON tv c,n n vnN n Aza naivr cui ro 1000 c, ?d'i![!,LQj.-
an una ron. Tt xas 7soii s., .
y January 4,1979 In Reply Refer To:
RIV Docket No. 50-445/Rpt. 78-18 50-446/Rpt. 78-18 Texas Utilities Generating Company ATIN: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Centlemen:
Thank you for your letters dated November 16, 1978 and December 20, 1978, in reponse to our letters dated October 20, 1978 and December 8, 1978.
We have no further questions at this time and will review your corrective action during a future inspection.
Sincerely,
/ _.
/' .
2 *-< de_*
W. C. Sei);1e, Chief Reactor C'o'ns truction and Engineering Support Branch 4
b C I
@oirgo33 i
/M/ U
[pa naGeq< i:,r '
NUCLEAR REGULATORY COMMISSION f" $ REGION IV T.
' $ 611 RYAN PLAZA DRIVE,SulTE 1000 AR LINGTON, TE XAS 76011
% *****/ February 20, 1979 In Reply Refer To:
RIV Docket No. 50-446/79-03 '
Texas Utilities Generating Company ATTH: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen: .
This refers to the inspection activities performed by our Resident In-spector, Mr. R. G. Taylor, of activities authorized by.NRC Construction Permit No. CPPR-127 for the Comanche Peak Steam Electric Station, Unit 2, and to the discussion of the findings by the inspector with members of your staff on February '15,1979.
( During the inspection, it was found that certain activities under your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."
The item of noncompliance and references to the pertinent requirements are 4 identified in the enclosed Notice of Violation. Details of this item will be included in an inspection report to be issued in the near future and identified as Inspection Report No. 50-445/79-03; 50-446/79-03.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10 Code of Federal Regulations. Section 2.201 requires you to submit to this office, with-in 30 days of your receipt of this notice, a written statement or expla-nation in reply including: (1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
S L_ -__ _ _-
Texas Utilities Generating Company ~ February 20, 1979 Should you have any questions concerning this inspection, we will be pleased to discuss them with you. ;
Sincerely, j k ;
W. C. Se e, Chief Reactor nstruction and Engineering Support Branch j Enclosure- i Appendix A, Notice of Violation cc: w/ enclosure Texas Utilities Generating Company ATTN: Mr. H. C. Schmidt, Project Manager 2001 Bryan Tower Dallas, Texas 75201 l
l i
l ,
1 i
b l - _ - _
, - __ = _
50-446/79-13 t
Appendix A ;
i NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on February 15, 1979, it appears that certain of your activities were not conducted in full compliance with the conditions of your NRC Construction Permit No.
CPPR 127 as indicated below:
Failure to Follow Concrete Placement Procedure Criterion V of Appendix B to 10 CFR 50 requires that activities I affecting quality shall be accomplished in accordance with docu-mented instructions, procedures, or drawings of a type appropriate to the circumstances.
Project Quality Procedure Ql-QP-11.0-3 references Specification 2323-55-9, " Concrete," which invokes Section 8.3 of ACI 301-72 for depositing of concrete. Paragraph 8.3.3 of ACI 301-72 states that, " Concrete shall not be subjected to any procedure which will l cause segregation."
)
Contrary to the above:
( Durin Wall)gonconcrete l Feburaryplacement 201-5805-019 15, 1979, at approximately(Unit 11:15No.
a.m., 2 Containment the !
Resident Inspector observed that concrete was free-falling from j
" elephant-trunks" and impinging on reinforcing steel prior to I reaching the deposit surface. Concrete segregation was evidenced by coarse aggregate emanating from the stream of falling concrete.
This is an infraction. '
\
I l
.i i
.l l
gW py 1
46 l l L
e_.__. _ _ . _
U.S.N.R.C. PREL2MINARY NOTICE OF kIOLAT10N)
DEVIATION Docket Number c;0-fl6 '
- Date February b l479 To: R .G . Tol son TUGCO Site OA Supervisor t/)TE : This preliminary notice is intended to be an unofficial advice t hat an apparent item of noncompliance or deviation has been identified by the below signed NRC IE Inspector. The addressee is not obligated er requested to take any action on the basis of this notification.
O*ficial notification will be as required by 10CFR2.201.
[lentified condition vs Requirement Requirement : Appendix B Criterion V requires that activities affecting quality be per:ormed in accordance with proedures. Project quality procedure Ql-QP-11.0-3 Concrete Placement Inspection states in paragraph 3.2.2.d " Placement technique I
causes minimum segregation". The procedure references Specification 2323-SS-9
" Concrete" which states in paragraph 8.2.5.b that depositing of concrete shall be in accordance with Section 8.3 of ACI 301-72. Section 8.3 of ACI 301-72 states
( in paragraph 8.3.3 that " Concrete shall not be subjected to any procedure which will cause segregation".
1 1 Condition : Cortrary to the above requirement , the RR1 observed during a portion of I
concrete placement 201-5805-019 (unit 2 containment wall) on February 15, 1979 at approximately 11:15 AM that concrete was free-falling from elephant-trunks and impinging on reinforcing steel prior to reaching the deposit surface. Concrete segregation was evidenced by flying coarse aggregate emanating from the stream of falling concrete.
This is an infraction.
Note: The inspection report transmittal letter and the report details will I
reflect that the condition was immediately corrected after being brought to the attending B&R QC Inspector. The letter will require that you address actions to prevent recurrence.
l l
s%
[, ,/
/
O I U.S.N.R.C. PREt.IMINARY NOTICE OF .
Docket Number 90-226 t Date February 15. 1979 TO: R .G . Tol son TUGCO Site OA Supervisor NOTE: This preliminary notice is intended to be an unofficial advice I that an apparent item of noncompliance or deviation has been identified by the below bigned NRC IE Inspector. The addressee is not obligated or requested to take any action on the basis of this notification.
Official notification will be as required by 10CFR2.201. ,
Identified condition vs Requirement Requirement : Appendix B Critorion V requires that activities affecting quality be performed in accordance with proedures. Project quality procedure Ql-QP-11.0-3 Concrete Placement inspection states in paragraph 3.2.2.d " Placement technique causes minimum segregation". The procedure references Specification 2323-SS-9
" Concrete" which states in paragraph 8.2.5.b that depositing of concrete shall be in accordance with Section 8.3 of ACI 301-72. Section 8.3 of ACI 301-72 states in paragraph 8.3.3 that " Concrete shall not be subjected to any procedure which will cause segregation".
Condition : Contrary to the above requirement , the RR1 observed during a portion of concrete placement 201-5805-019 (unit 2 containment wall) on February 15, 1979 at approximately 11:15 AM that concrete was free-falling from elephant-trunks and impinging on reinforcing steel prior to reaching the deposit surface. Concrete segregation was evidenced by flying coarse aggregate emanating from the stream of falling concrete.
This is an infraction.
Note: The inspection report transmittal letter and the report details will 4 reflect that the condition sas immediately corrected after being brought to the l attending f3&R QC Inspector. The letter will require that you address actions ;
to prevent recurrence.