Letter Sequence Other |
---|
|
|
MONTHYEARML20137A4671997-03-18018 March 1997 Forwards RAI Re DPC Proposed Amends for CNS to Eliminate from Plant TSs SIS on Low Steam Line Pressure Project stage: RAI ML20137G5991997-03-20020 March 1997 Forwards Responses to Staff Questions Re Proposed TS to Eliminate Safety Injection Signal on Low Steam Pressure Project stage: Other ML20198H5341998-01-0505 January 1998 Informs That Encl Two Page Document Signifies Implementation of Operating License Amend 158 on 971222 Project stage: Other 1997-03-20
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] |
Text
. _ .
- ~
,5
%~
oi
.g UNITED STATES NUCLEAR REGULATORY COMMISSION l 5 WASHING 10N, D. C. 20555 2 5 ,...
4 9
January 5,1998 1 MEMORANDUM FOR: IdsIssWMler FROM: Peter S. Tam, Senior Project Manager Project Directorate 11-2 ..
Division of Reactor Projects 1/ll ('. (A -
M Office of Nuclear Reactor Regulation ~
SUBJECT:
CATAWBA UNIT 1 -IMPLEMENTATION OF AMENDMENT 158 TO OPERATING LICENSE (TAC M97538)
The attached 2-page document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment 158 on December 22,1997.
Docket Numbers 50-413 Distribution Docket file PUBLIC H. Berkow -
\
DPDL
!. 9801130331 980105 PDR ADOCK 05000413 P PDR ll!I!IllAll!Il II
i l Noaiser F% Meneel . Veemane 2 m%g g ,
APPENDIX D. 221. FACILIT MNG UCENSE/ TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FAtiltTY OPERATING UCLNSE/TEclWKAt, spg4 tMCAT10NS AMEWMFM ih!PLEStLSTA710N s!!CET jf CNs c MS$ Q ONS U EIT N O $ 1 C 2 0 .1 Y4T&+$.511.s,4 7 TE N O. __ S.S.f J M DATE RECEIVED _ 4g.,N f**ae Ph. $.e, W. 9.t AMENDMENT. No IC+ $_ DI:.SCRIFTION sdopt OlNe' 8 4v h *d'I laj'O'" _ ,
- >r. leu Mon iou pun >>Lr<. (&4 t) _
- 1. DtrtIMENTATION DATES A. NRC 155t;E DATE (Date of NRC Com Lauerr _ M~3-47
- 8. NRC EFFECTIVE DATE (Frorr. Ten of NRCb T' icner): _
C. STAT 10N IMPLEMENTATION (No lette than NRC Effecew Deter N V4O#*9 i PLANT NOnnCA' MON lidthth Alt
/ f 8 " 'N' A..Y./IS .'D %s E. mad Dmributicn:Ircide Site Tech-ded Conwa B.
j ,,,_,,, Prr.smolementauon Items (itscu 1.$)
- 3. RCC TEHNIC Al. CONTENT REVIEW CRITT.RIA O A. AI Dncreparecs Have B:en Rewived %= NRC Iniedace O E Sc Inaove-tent O.argei Were Made To TS Sh.sts invohed
% C. TS Change Wu inued euvest y DFC.
TECHNICAL REVIEWER: 'M U @ f-if (La Disn:, .ci On Attached Past) ---
Dat:
CHECKED BY. UEldi.M f I R '}-%
(Lan Diwr:psrces On Attached Pase)
, Date 4 PIP NUMELR (If generated) _ (47 - ult _
5 @ ALL CORRF VE ACTI %# FROM ASSIGNED PIP COMPLE*tT.D
[vcRIr;t:0 riy; )bSW w JN tik*/
N A " N m Fsd 3" N' 1 E h 5 4 er4 4. h P a (W Jt.h 1997)
D-22127 l
- 00 2 33.NTITIKO) 1901Y't.19.TE T6 hit $C09 IV,f sc
- 71 Q3a 46/TC' I
, , .g - . + +
. s~ .- ;
,. :: .aw -
NSD Appenes D. 221. * *
' :Shem i-Noelew Pehey Mamnd . Valene 2 i
Fact!JTY OPERATB'G IJCENSETTECHNICAL SPEC!nCAT10NS AMENDMENT s IMPLEMENTAT10N SHEET i 6 FINAL 1%fPLEMENTAT10N APPROVAL !
~ ~
Manape, Regulmery Comptwa Date F
- N11 J]A Manspr/ Safety Assurance
, lY2$f5 Okte
- Approval may be werved (see 221.8 hem 6).
7 ADVANCEIMPLEMENTATION
\.
~
M / INb/47 ResponaR4 licenset imLvidual Dau 6.2 COATROL ROOy 'ORK OhTROL NOTIFICATION A _ INA A rWIo/O RespondNe Licenseg in&vidW . Date 6.2.1 INSTRUCTIONS TO 05M#5WM/CRSRO/WCSRO (l'nanded)
I 6.2.2 ACMNOW1.EDGMENT Of RECEIPT OT ADVANCE COPIES BY OPERATIONS PERSONST L Date
~
Dp
$ DOCL'ML%T CP' TROL DISTRIBLTION A copy of the Teetusal Spee$ cation pa:kage has been famaW to Docem:rst Mv4..s,t for ,
statier, dmti tion ^
A 51 W- \7 ll0 i Respormbic Ucensarg ineivusE Date 4 ITN AL RECI'I.4 TORY CO%ff t.3 ANCE $1CAOiT .
~
Manspr, Regulaton ComF4ance Date f
D 22128 ~
(36 JUN 1997) l cong g 3XVI*IdK03 .\ HOD *11S33 16TCict.C09 1Y.i COM'I Q3n 46/IC/ET