September 2004 Monthly Operating Report for Callaway Unit 1
ML042950600
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/13/2004
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05066
Download: ML042950600 (4)


Text

AmerenUE PO Box 620 Callaway Plant Fulton, MO 65251 October 13, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05066 Ladies & Gentlemen:

YAmeren DOCKET NUMBER 50-483 UNION ELECTRIC CO.

UE CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT Scptember/2004 The enclosed Monthly Operating Report for September/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

t4ob0at h D. Young Manager, Regulatory Affairs KDY/JER/slk Enclosure j'15s a subsidiary of Ameren Corporation

ULNRC05066 October 13, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC05066 October 13, 2004 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: September/2004

1. DESIGN ELECTRICAL RATING (MWe-Net): 1171
2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720 4,723.57 154,669.57
4. HOURS GENERATOR ON-LINE 720 4,648.02 152,642.02
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 835,856 5,259,977 168,503,816 Page 1 of2

Enclosure ULNRC05066 October 13, 2004 UNIT SHUTDOWNS DOCKET NO.: 50483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT: September /2004 TYPE METHOD OF CORRECTIVE F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR COMMENTS

SUMMARY

Callaway Plant operated at approximately 100% power for the month of September.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2