ML19208A387

From kanterella
Revision as of 15:27, 19 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Lists Correspondence W/Nrc Re Adequacy of Electric Distribution Sys Voltage,In Response to W Gammill 790809 Ltr to All Reactor Licensees.No Further Util Action Will Be Taken Until Response Is Received to Referenced Ltrs
ML19208A387
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/07/1979
From: Early P
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JPN-79-56, NUDOCS 7909130502
Download: ML19208A387 (2)


Text

.

POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y.10019 (212) 397.6200 8 September 7, 1979 JPN-79-56 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Thomas A. Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Adequacy of Station Electric Distribution System Voltage

Reference:

Mr. W. Gammill letter to all reactor -licensees, dated August 8, 1979

Dear Sir:

The referenced letter requested that the NRC be informed within 30 days if the Authority has previously completed the reviews of the concerns expressed in it. The Authority hereby refers the NRC staff to its previous letters to the NRC on this matter, as follows:

A - G. T. Berry letter to R. W. Reid dated October 18, 1976 This letter provided an answer to R. W. Reid letter to G. T. Berry dated August 12, 1976 and included, as attach-ment, our " Evaluation of Operability of Safety Related Equipment During a Degraded Voltage Condition" study, pre-pared specifically in response to Mr. Reid's concerns of August 12, 1976.

B- G. T. Berry letter to R. W. Reid dated July 13, 1977 This letter provided a preliminary response to R. W. Reid letter to G. T. Berry dated June 3, 1977 and included, as attachment, our " Degraded Voltage Protection for Emergency A-C Power System" study.

.. -

-

1%  %% D \

7 90013 0 fio;(

,

_2_

C - G. T. Ber'?y letter to R. W. Reid dated October 17, 1977 This letter completed the response to R. W. Reid letter of June 3, 1977 and it.cluded, as attachments, the following documents:

a) " Modification to the Emergency A-C Power System Undervoltage Protection", which presented in detail our proposed manner to provide a second level of voltage protection to the emergency busses to mitigate the possible consequences of a sustained degraded voltage condition in these busses, b) " Proposed Changes to Technical Specifications -

Degraded Voltage Protection for Emergency A-C Power System", prepared to comply with Position 3 of the enclosure to R. W. Reid letter of June 3, 1977, and c) " Technical Description and Discussion of Technical Specification Changes", supporting above modification.

Our records indicate that no answer from the NRC has yet been received and thus no efforts to implement the modification have been made.

It is the Authority's consideration that the three above listed letters with their attached documents and FSAR Sections 8.2 through 8.6 address all the concerns contained in W. Gammill letter of August 8, 1979, although not necessarily in the same order as expressed in the letter, and that, in consequence, no further action on our part is required on this matter.

Very truly yours, fQ' Pau

& t,

. Ea'rly j Assi'stant Chief Engineer-Projects 91" 186