06/23/11-Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting
ML11178A068
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/23/2011
From:
Florida Power & Light Co
To: Jason Paige
Plant Licensing Branch II
Shared Package
ML11195A170 List:
References
TAC ME4907, TAC ME4908
Download: ML11178A068 (21)


Text

Agenda

  • Opening
  • Purpose
  • EPU License Amendment Request (LAR) Review Summary
  • Proposed Technical Specification Changes
  • Mechanical and Civil Outstanding Questions
  • Nuclear Performance and Code Review

- Boron Precipitation Analysis Discussion

  • Containment and Ventilation EPITOME Analysis
  • Reactor Systems Branch Questions
  • Questions
  • Closing 2 -I=PL.

Turkey Point -- Opening

  • Appreciate the Staff's support and participation today
  • Significant progress made to date
  • FPL seeks clarification and understanding of remaining Staff questions
  • Encourage open and active dialogue to address open items from the Staff's review 3 -a=pL.

Turkey Point -- Purpose

  • Review status of Requests for Additional Information (RAls)
  • Discuss remaining questions and/or open items

EPU LAR Review Summary

  • 6 draft SEs are complete for the 17 branches
  • 4 draft SEs are in branch concurrence
  • Draft Environmental Assessment scheduled for 7/15/1
  • Focus today is to resolve any questions and/or open items remaining

- Technical Specifications - Confirm no questions or comments on proposed Technical Specifications

- Mechanical and Civil Engineering - Follow-up questions

- Nuclear Performance and Code - PHOENIX-P/ANC benchmarking and boron precipitation

- Containment and Ventilation - EPITOME issue

- Reactor Systems - outstanding RAls and RETRAN deck 5 -F=PL,

e:

°--ca

+'


U II U

(1),...

c.:::::s UJO

_-C cue:

ucu

-c J:

.c:(1)

(.)(1)

(1)UJ

~I

-C (l)Q) tn tnc) 0e:

c.cu eJ:

D..O <0

Mechanical and Civil Engineering

  • Received 6 follow-up RAls on 6/20/11

- Spent Fuel Pool Cooling and Component Cooling Water modification design information

- Normal containment cooler modification design information

- Containment penetration anchor margins

- Use of actual material properties for reactor vessel supports

- Allowable stresses for control rod drive mechanisms

- Steam Generator fluid steam mixture velocity information

  • Clarification discussion today
  • Preparing responses with a target of mid July 2011 7 - I=PL.

Nuclear Performance and Code Review

  • Providing additional information regarding PHOENIX-PlANe benchmarking - Target early July

- Status of NRC confirmatory analysis

- Discuss and reach agreement on anticipated FPL actions based on lessons learned from the Point Beach EPU

-- Summarize conservatisms in the analysis

-- Provide additional discussion on operational considerations for small break LOCAs

-- Confirmation that charging pumps trip on safety injection

-- Provide at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of margin between lineup for hot leg injection and the onset of boron precipitation

-- Other actions?

8 -FPL.

Nuclear Performance and Code Review Boric Acid Precipitation Timeline Injection Mode 1 RHR Pump, 2 HHSI Pumps

/

.j Injection Mode 2 HHSI Pumps 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 10 minutes

s::

a u..

Cf)

Cold Leg Red ,,"',,'oO Mode 2 HHSI Pumps I..

1*1 Hot Leg Recircu ation Mode 2 HHSI Pumps H Time After LOCA L

DelaY 1 T z - RWST Low Low Level Delay z l T. - Incipient Boric Acid Precipitation Without Hot Leg Recirculation T3 - HLSO Initiation Tl - RWST Low Level To - Event Initiation Tl - 15 minutes T z - 45 minutes To- Event Initation T3 - 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, 30 minutes T. - 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 40 minutes

DelaYl - 2 minutes (EPU)

Delay z - 3 minutes (EPU) 9 I=PL.

Containment and Ventilation - EPITOME Analysis

  • EPITOME code error involves LOCA mass and energy release calculation
  • Turkey Point containment analysis is impacted
  • Plant operability has been addressed

- EPITOME code error correction

- Range for containment free volume

  • Technical specification change proposed to lower limit on normal operating containment pressure from 3 psig to .

1 psig

- Include ITS improvement for administrative control of instrument air bleed 10 - I=PL.

Containment and Ventilation - EPITOME Analysis

  • Other changes

- Modify the Emergency Containment Cooler (ECC) Start Logic to ensure 2 ECCs operate (new commitment)

- Reduce upper operating band on Tav9 from 3°F to 1.soF

- Other input changes

  • Draft Results 11 - I=PL.

Containment and Ventilation - EPITOME LOCA Draft Results

- - - Containment Pressure. OEPS MINSI Contoinment Temperature. OEPS MINSI


Containment Pressure, OEPS MINSI Rev ised ----- Containment Temperoture, OEPS MINSI Revised OO~I----------------------------------~ jOO~I------------------------------------~

5{) . . . .. :. .. .// .-:\\ ... ... :........ :..... .. . :... ..... :. ... .. . .

  • \ ~

,.,..........,

r--...

  • \

l.L 2-.IlJ 1;/\ * * . . .. .* **.* ** ..* * **. . **\.

. .

- .-...;'

d

.

.

" ...*... .***...* . * .*.. . . * .*.. , ***

40 .. .... .*....... .. :.. .. .... :.l.\ ... :... .... .:...... ..:........ :...... . .

,,

'---"' 'f 40

.Q' ~

(f) * \ ~

D..  : \ ~ .

"-/ ..2 . . . . , .

\

~ YJ .....*.. :... .... . :........ :.... '\i ' ~:' .\' .. .:..... ... :... ... ..:.. ..... . ~ 200 1. ....*........... . ..... .... . .. . . ... .. .. ..~~ . ... .. . : ..... , . . : .. . ....*

J

... ~ . . . . . .,

D1 IJ) "

OJ ..*.... .. .. .. . .. .... .. ... ... ... .. . . :.. \, ' .'\:. .. .....  :... .... . :. . ..... . E n=20 , \ .

f-OJ 150- .. ... ........ ........ .. , ............ ........ ...... ..-........... .... .. .

...

1Q1' ..... .. ......... .... ........... ........ ... :... . \ ,,,X ***** ** ***.*** ** ** *

~

...:......

oI 1111111, 11 11 1", I! II, I I ""'I 'I ""',  ! '"111 1 f IIII!I, 111""1 100 I 11111111 I

1111111 I

1111111 I

1111111 I

11111111 I

11111111 I

11111111 I

11111111

~ 1 2 J ~ 5 ~ 7 8 ~ 1 2 j 4 ~ 6 7 a 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Time (3) Time (s) 12 - FPL.

Containment and Ventilation - EPITOME MSLB Draft Results Containment Pressure . 1*0 sq ft Split Con tai nmen t Temperature. 30 % Power DER MSCV

- - - - . Co n tainment Pressure. 1.0 sq ft Split Revised - - - - . Containment Temperature. HZP DER MSCV Revised 60-'-'- - - - - - - - - - - - - - - - - - - - ,

3511 ~\

50 300

~ /"'.

LL 250

-- -- - ------ -.-------

.12' 40 '--"

(J)

~ 200 Q

'---./

J

~ 30

+-'

0

s L

~ 150 (J)

(J)

Q)

E ct 20 Q)

I 100 10 50 O +I~~~~~~~~~~~-L~~~~_.~--L-~

0 o 200 400 600 800 1000 0 200 400 600 BOD 1000 Transient Time (sec) Transient Time (sec) 13

- FPL.

Containment and Ventilation - EPITOME

  • Areas requiring revised analysis (applicable LAR sections in parentheses)

- Component Cooling Water Systems (2 .5.4.3)

- Primary Containment Functional Design (2.6.1)

- Mass and Energy Release (2 .6.3)

- Containment Heat Removal (2.6.5)

  • Determined to be acceptable 14 -FPL.

Containment and Ventilation - EPITOME

  • Other areas reviewed and determined no impact (applicable LAR sections in parentheses)

- Protective Coating Systems (2 .1.7)

- Balance of Plant Piping, Components and Supports (2 .2.2.2)

- Safety-Related Valves and Pumps (2.2.4)

- Environmental Qualification of Electrical Equipment (2 .3.1)

- Pressure Analysis for ECCS Performance Capability (2.6 .6)

- Containment Ventilation System (2 .7.7)

- ECCS and Loss-of-Coolant Accidents (2 .8.5.6.3)

- Radiological Consequences Analyses Using AST (2.9.2)

  • No change to LAR section conclusions for impact of EPU 15 -FPL.

j w

E ea 0

-

I a..

w .....::l I

0 c: "'C c:

.....0

-- ca

.c:

-.....CO

--

(1)

(1)

(f) c: I (1) L.

>

(1)

.....

.....

(1)

-c ..J c: (1) ca tn c:

..... 0 c.

c tn (1) (1) a::::

E 'to c 0

--ca (1)

..... . t:

c: -.....::l 0 0 0 *

..<D

Reactor Systems Branch Questions

  • Received 31 non-LOCA RAls on 6/10/11

- Conducted clarification call on 6/20/11

- Preparing responses with a target issue of mid-July 2011

  • Further discussion on the following:

- NUREG 0800 requirement regarding credited reactor trips for loss of load analysis

- Analysis of credible main steam line breaks

- eves malfunction in Modes 3, 4, and 5 (j

17 I=PL.

Reactor Systems Branch Questions

  • Received additional RAls:

- 10on6/14/11

- 7on6/17/11

- Anticipate remaining questions by 6/23/11

- Clarification discussion today

- Preparing responses with a target of mid July 2011

  • Further discussion on the following:

- Inadvertent opening of a PORV

- Additional information regarding LBLOCA nodalization 18 -FPL..

Reactor Systems Branch Questions

  • RETRAN Deck

- Modified Turkey Point base deck to be compatible with RETRAN3D

- Westinghouse transmitted to NRC on 6/21/11

- Personnel available today to assist the Staff with running RETRAN with the modified base deck to ensure its compatibility with Staff software 19 - F=PL.

3:

Cl)

>

Cl)

'

'-

...

Cl)

..s::

0

'

0 tn tn C Cl)

.-...,0 tn

~

(J c

G) "

s ..cCl)'-

a ...

.c

...,I 0 E

c

.-o ....s-0

n. tn c

~ 0 G)

.-

.... tn

(""'-

~

...

s Oca tn",

Cl)Cl)

s '

~

0 N

  • Turkey Point - Closing
  • FPL respond to remaining RAls and clarification requests
  • Staff to complete remaining draft SE input
  • Draft SE to ACRS Subcommittee in August
  • Prepare for ACRS Subcommittee meeting in September and ACRS Full Committee meeting in October 21 -I=PL.