ML17285B172

From kanterella
Revision as of 14:24, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1990 for Washington Nuclear Plant Unit 2.W/900409 Ltr
ML17285B172
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004170052
Download: ML17285B172 (9)


Text

.. ACCELERATED DI- UTION DEMONSrjRATION SYSTEM M~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004170052 DOC.DA . 1 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLXATION

SUBJECT:

Monthly opera Plant, Unit .W/900409

~ lfor r.

Mar 1990 for WPPS Nuclear Power DISTRIBUTION CODE: IE2 OPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 XRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 ~R&jBOE OEABll 1 1 NUDOCS-ABSTRACT 1 1 G FILE Ol 1 1 RGN5 1 1 EXTERNAL: EGGG STUART,V.A 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1, 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT; 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28

p' 1

ll

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 April 9, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear,

Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT MARCH 1990 Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, 0@8 C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. J. B. Martin- NRC Region V Mr. C. J. Bosted- NRC Resident Inspector (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr. W. H. Lovelace - NRC, Washington D.C.

d~~yo0>

9004270052 900332 PDR ADOCK 05000397

)

R PDC yg$

~ P";

g \

~ ~

DOCKET NO. 50-39 UNIT llRllL WNP-2 DATE 4/I/90 LNIT SllUTDDWNS' AEDUCTIONS COMPLETEO DY LB HUTCHISON AEKAT PEAIQ> MARCH 199O TELEPl lONE 5 486 mcnth, year HK li>n E TTTP Teen<~ nnznSGH ~t. 1Ã ~Y l RET CIO PllEE 0CfNNC NONE

~:

I SUhtNRY lWNP 2 OPERATED ROUTINELY DURING MARCH WITH NO OUTAGES OR SIGNIFCANT POWER REDUCTIONS.

TYPE hlETlKO SYSTEM k COMPOhCNT F-Forced A-Equip Failure F-Admin l-Manual Exhibit F h H S- chcd 0-Maint or Test ~ G-Oper Error 2-Manual Scrato Instructions for C-Refueling l3-Other >-Auto Scram Preparation'l':

0-Beg<>latory Restriction 4-Continued Oata Entry Sheet E-Operator Training R4)educed Load Licensee Event Deport I License Examination 9-Other (LiEcB) File (NUREG-0161)

R

OJ OPERATING DATA REPORT WNP-2 01-Apr-90

1. DOCKET: 50-397
2. REPORTING PERIOD: Mar-90 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 2160 46424.2
13. HOURS REACTOR CRITICAL 744.0 2160.0 35235.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 744.0 2160.0 34007.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2334282 6835428 95179868
18. GROSS ELECTRICAL ENERGY (MWH) 775550 2277810 31681760
19. NET ELECTRICAL ENERGY (MWH) 748445 2200897 30487040
20. UNIT SERVICE FACTOR 100.04 100.04 73.3%
21. UNIT AVAILABILITYFACTOR 100.0% 100.0< 74.1%
22. UNIT CAPACITY FACTOR (MDC NET) 91.94 93.14 60.0~o
23. UNIT CAPACITY FACTOR (DER NET) 91.5% 92 ~ 6roq 59 7~
24. UNIT FORCED OUTAGE RATE 0.0% 8.1%i'.0<
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

0

~ ~

VERAGE DAILY UNIT POWER LEVEL, DOCKET NO. 50-397 UNIT WNP;;2 DATE 4/1'/90 COMPLETED BY LB HUTCHISON TELEPHONE (590)377-2486 MONTH MARCH 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 921 17. 1017

2. 959 18. 1006
3. 1062 19. 994
4. 1040 20. 995
5. 1037 21. 1000
6. 1029 22. 995
7. 1036 23. 1001
8. 1046 24. 997
9. 1030 25. 919 1043 26. 1006 10.

1046 27. 988 1042 28. 978 12.

1034 29 ~ 978 13.

1021 30. 966 14.

1026 3l. 970 15.

1004 16.

INSTRUCTIONS A

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

vP ~ e a