IR 05000275/2009402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams|number = ML090360770}}
{{Adams
| number = ML090360770
| issue date = 02/04/2009
| title = IR 05000275-09-402, IR 05000323-09-402, on 02/08/2009, for Diablo Canyon Power Plant, Units 1 & 2
| author name = Shannon M P
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Conway J T
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-09-402
| document type = Letter, Inspection Report
| page count = 3
}}


{{IR-Nav| site = 05000275 | year = 2009 | report number = 402 }}
{{IR-Nav| site = 05000275 | year = 2009 | report number = 402 }}
Line 10: Line 24:


==Dear Mr. Conway:==
==Dear Mr. Conway:==
On January 8, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 8, 2009, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
On January 8, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 8, 2009, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff.


No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns Pacific Gas and Electric Company - 2 contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
No findings of significance were identified.


Sincerely,/RA/
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS.
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82 Nonpublic  
 
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns Pacific Gas and Electric Company - 2 - contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
Sincerely,/RA/  
 
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82  
 
Nonpublic  


===Enclosure:===
===Enclosure:===
Line 23: Line 46:


===w/Attachment:===
===w/Attachment:===
Supplemental Information Pacific Gas and Electric Company - 3 cc w/o enclosure: James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P. O. Box 56 Avila Beach, CA 93424
Supplemental Information Pacific Gas and Electric Company - 3 - cc w/o enclosure: James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P. O. Box 56 Avila Beach, CA 93424
}}
}}

Revision as of 14:45, 27 August 2018

IR 05000275-09-402, IR 05000323-09-402, on 02/08/2009, for Diablo Canyon Power Plant, Units 1 & 2
ML090360770
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/04/2009
From: Shannon M P
Plant Support Branch-1
To: Conway J T
Pacific Gas & Electric Co
References
IR-09-402
Download: ML090360770 (3)


Text

" " February 4, 2009 John T. Conway, Senior Vice President &

Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2009402 AND 05000323/2009402

Dear Mr. Conway:

On January 8, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 8, 2009, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns Pacific Gas and Electric Company - 2 - contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82

Nonpublic

Enclosure:

NRC Inspection Report 05000275/2009402 and 05000323/2009402

w/Attachment:

Supplemental Information Pacific Gas and Electric Company - 3 - cc w/o enclosure: James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P. O. Box 56 Avila Beach, CA 93424