ML13246A236: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 23: | Line 23: | ||
==SUBJECT:== | ==SUBJECT:== | ||
MID-CYCLE ASSESSMENT LETTER FOR LASALLE COUNTY STATION UNITS 1 AND 2 (REPORT 05000373/20 13006 AND 05000374/2 013006) Dear Mr. Pacilio | MID-CYCLE ASSESSMENT LETTER FOR LASALLE COUNTY STATION UNITS 1 AND 2 (REPORT 05000373/20 13006 AND 05000374/2 013006) Dear Mr. Pacilio | ||
: On August 14, | : On August 14, 201 3 , the U.S. Nuclear Regulatory Commission (NRC) completed its mid | ||
-cycle performance review of LaSalle County Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, | -cycle performance review of LaSalle County Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 2 , through June 30, 201 3. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined the performance at LaSalle County Station, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC | The NRC determined the performance at LaSalle County Station, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC | ||
's Reactor Oversight Process (ROP) Action Matrix | 's Reactor Oversight Process (ROP) Action Matrix | ||
, because all inspection findings had very low (i.e., | , because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., G reen). The NRC determined the performance at LaSalle County Station, Unit 2, during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRC | ||
Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., | 's Reactor Oversight Process (ROP) Action Matrix because of a W hite PI for Unplanned Scrams with Complications. The causes of the scrams include unexpected system interactions and human performance errors. | ||
's Reactor Oversight Process (ROP) Action Matrix because of a | |||
. The causes of the scrams include unexpected system interactions and human performance errors. | |||
Prior to transitioning to the Regulatory Response Column, plant performance for Unit 2 was in the Licensee Response Column of the Action Matrix in the first three quarters of the assessment period. In a letter dated August 16, 2013 (ADAMS Accession Number ML13228A309), the NRC informed you that Unit 2 transitioned from the Licensee Response Column to the Regulatory Response Column in the second quarter of 2013. | Prior to transitioning to the Regulatory Response Column, plant performance for Unit 2 was in the Licensee Response Column of the Action Matrix in the first three quarters of the assessment period. In a letter dated August 16, 2013 (ADAMS Accession Number ML13228A309), the NRC informed you that Unit 2 transitioned from the Licensee Response Column to the Regulatory Response Column in the second quarter of 2013. | ||
In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," to review your actions to address the White IP. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. | In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," to review your actions to address the White IP. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. | ||
The enclosed inspection plan lists the inspections scheduled through December 31, | The enclosed inspection plan lists the inspections scheduled through December 31, 20 14. Routine inspections performed by resident inspectors are not included in the inspection plan. | ||
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end | ||
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including: Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial | -of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including: Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial | ||
Line 47: | Line 44: | ||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter | Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter | ||
. Sincerely, | . Sincerely, /RA/ Kenneth G. O'Brien , Acting Director Division of Reactor Projects Docket Nos. 50 | ||
-373; 50-374 License Nos. NPF | -373; 50-374 License Nos. NPF | ||
-11; NPF-18 | -11; NPF-18 | ||
Line 54: | Line 50: | ||
==Enclosure:== | ==Enclosure:== | ||
LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM The enclosed inspection plan lists the inspections scheduled through December 31, | LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM The enclosed inspection plan lists the inspections scheduled through December 31, 20 14. Routine inspections performed by resident inspectors are not included in the inspection plan. | ||
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including: | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including: | ||
Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial)." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial)." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | ||
Line 66: | Line 62: | ||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter | Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter | ||
. Sincerely, | . Sincerely, /RA/ Kenneth G. O'Brien, Acting Director Division of Reactor Projects Docket No s. 50-373; 50-374 License N os. NPF-11; NPF-18 | ||
==Enclosure:== | ==Enclosure:== | ||
Line 74: | Line 68: | ||
LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM DISTRIBUTION | LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM DISTRIBUTION | ||
: See next page DOCUMENT NAME: | : See next page DOCUMENT NAME: | ||
LaSalle EOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:rj KO'Brien DATE 08/28/13 08/28/13 OFFICIAL RECORD COPY | LaSalle EOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:rj KO'Brien DATE 08/28/13 08/28/13 OFFICIAL RECORD COPY | ||
Letter to M. Pacilio from K. O'Brien dated September 3, 2013 | Letter to M. Pacilio from K. O'Brien dated September 3, 2013 | ||
Line 84: | Line 78: | ||
-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov | -2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov | ||
Page 1 of 2 08/26/201307:11: | Page 1 of 2 08/26/201307:11:19 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LaSalleInspection / Activity Plan 09/01/2013 | ||
-12/31/2014 BI CDBI-COMPONENT DESIGN BASIS INSPECTION | -12/31/2014 BI CDBI-COMPONENT DESIGN BASIS INSPECTION 8 1 IP Component Design Bases Inspection7111121 09/23/2013 10/25/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/07/201310/11/2013 1 IP Occupational ALARA Planning and Controls71124.02 10/07/201310/11/2013 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/07/201310/11/2013 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B11/18/201311/22/2013 STRIKE-STRIKE CONTINGENCY-OPS/RP/MAINT 3 1, 2 IP Licensee Strike Contingency Plans 92709 12/01/2013 12/30/2013 BI ISI-INSERVICE INSPECTION UNIT 1 1 1 IP Inservice Inspection Activities - BWR7111108G 02/10/2014 03/01/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/17/2014 02/21/2014 1 IP Occupational ALARA Planning and Controls71124.02 02/17/2014 02/21/2014 1 IPOccupational Exposure Control Effectiveness71151-OR01 02/17/2014 02/21/2014 BI EPX-EP EXERCISE INSPECTION/PI VERIFICATION 2 2 IP Performance Indicator Verification71151 05/19/2014 05/23/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/17/2014 03/21/2014 1 IP Occupational Dose Assessment71124.04 03/17/2014 03/21/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/16/2014 06/20/2014 1 IPReactor Coolant System Activity71151-BI01 06/16/2014 06/20/2014 1 IPRETS/ODCM Radiological Effluent71151-PR01 06/16/2014 06/20/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 07/28/2014 08/01/2014 1 IP Occupational ALARA Planning and Controls71124.02 07/28/2014 08/01/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/15/2014 09/19/2014OL PREP-INITIAL EXAM - 10/2014 3 1 OL - INITIAL EXAM - 2014 JULY-MAR - LASA W90306 09/29/2014 10/03/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
Page 2 of 2 08/26/201307:11: | Page 2 of 2 08/26/201307:11:19 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LaSalleInspection / Activity Plan 09/01/2013 | ||
-12/31/2014OL EXAM-INIT EXAM FOR 10/2014 | -12/31/2014OL EXAM-INIT EXAM FOR 10/2014 3 1 OL - INITIAL EXAM - 2014 JULY-MAR - LASA W90306 10/20/2014 10/31/2014 BI FIRE-FIRE PROTECTION INSPECTION AND BAG TRIP 3 1, 2 IP Fire Protection [Triennial]7111105T11/03/2014 12/05/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}} |
Revision as of 01:22, 14 July 2018
ML13246A236 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 09/03/2013 |
From: | O'Brien K G Division Reactor Projects III |
To: | Pacilio M J Exelon Generation Co, Exelon Nuclear |
References | |
IR-13-006 | |
Download: ML13246A236 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 September 3, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co
., LLC President and Chief Nuclear Officer
, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR LASALLE COUNTY STATION UNITS 1 AND 2 (REPORT 05000373/20 13006 AND 05000374/2 013006) Dear Mr. Pacilio
- On August 14, 201 3 , the U.S. Nuclear Regulatory Commission (NRC) completed its mid
-cycle performance review of LaSalle County Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 2 , through June 30, 201 3. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at LaSalle County Station, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., G reen). The NRC determined the performance at LaSalle County Station, Unit 2, during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRC
's Reactor Oversight Process (ROP) Action Matrix because of a W hite PI for Unplanned Scrams with Complications. The causes of the scrams include unexpected system interactions and human performance errors.
Prior to transitioning to the Regulatory Response Column, plant performance for Unit 2 was in the Licensee Response Column of the Action Matrix in the first three quarters of the assessment period. In a letter dated August 16, 2013 (ADAMS Accession Number ML13228A309), the NRC informed you that Unit 2 transitioned from the Licensee Response Column to the Regulatory Response Column in the second quarter of 2013.
In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," to review your actions to address the White IP. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues.
The enclosed inspection plan lists the inspections scheduled through December 31, 20 14. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including: Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial
)." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice,"
a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter
. Sincerely, /RA/ Kenneth G. O'Brien , Acting Director Division of Reactor Projects Docket Nos. 50
-373; 50-374 License Nos. NPF
-11; NPF-18
Enclosure:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM The enclosed inspection plan lists the inspections scheduled through December 31, 20 14. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC also plans on performing special and infrequently performed inspections including:
Inspection Procedure (IP) 71111.21, "Component Design Basis Inspection," and IP 71111.05T, "Fire Protection (Triennial)." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice,"
a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 with any questions you may have regarding this letter
. Sincerely, /RA/ Kenneth G. O'Brien, Acting Director Division of Reactor Projects Docket No s. 50-373; 50-374 License N os. NPF-11; NPF-18
Enclosure:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ TM DISTRIBUTION
- See next page DOCUMENT NAME:
LaSalle EOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:rj KO'Brien DATE 08/28/13 08/28/13 OFFICIAL RECORD COPY
Letter to M. Pacilio from K. O'Brien dated September 3, 2013
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR LASALLE COUNTY STATION UNITS 1 AND 2 (REPORT 05000373/20 13006; 05000374/2 013006)
DISTRIBUTION
- Vivian Campbell RidsNrrDorlLpl3
-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 08/26/201307:11:19 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LaSalleInspection / Activity Plan 09/01/2013
-12/31/2014 BI CDBI-COMPONENT DESIGN BASIS INSPECTION 8 1 IP Component Design Bases Inspection7111121 09/23/2013 10/25/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/07/201310/11/2013 1 IP Occupational ALARA Planning and Controls71124.02 10/07/201310/11/2013 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/07/201310/11/2013 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B11/18/201311/22/2013 STRIKE-STRIKE CONTINGENCY-OPS/RP/MAINT 3 1, 2 IP Licensee Strike Contingency Plans 92709 12/01/2013 12/30/2013 BI ISI-INSERVICE INSPECTION UNIT 1 1 1 IP Inservice Inspection Activities - BWR7111108G 02/10/2014 03/01/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/17/2014 02/21/2014 1 IP Occupational ALARA Planning and Controls71124.02 02/17/2014 02/21/2014 1 IPOccupational Exposure Control Effectiveness71151-OR01 02/17/2014 02/21/2014 BI EPX-EP EXERCISE INSPECTION/PI VERIFICATION 2 2 IP Performance Indicator Verification71151 05/19/2014 05/23/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/17/2014 03/21/2014 1 IP Occupational Dose Assessment71124.04 03/17/2014 03/21/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/16/2014 06/20/2014 1 IPReactor Coolant System Activity71151-BI01 06/16/2014 06/20/2014 1 IPRETS/ODCM Radiological Effluent71151-PR01 06/16/2014 06/20/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 07/28/2014 08/01/2014 1 IP Occupational ALARA Planning and Controls71124.02 07/28/2014 08/01/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/15/2014 09/19/2014OL PREP-INITIAL EXAM - 10/2014 3 1 OL - INITIAL EXAM - 2014 JULY-MAR - LASA W90306 09/29/2014 10/03/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/26/201307:11:19 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LaSalleInspection / Activity Plan 09/01/2013
-12/31/2014OL EXAM-INIT EXAM FOR 10/2014 3 1 OL - INITIAL EXAM - 2014 JULY-MAR - LASA W90306 10/20/2014 10/31/2014 BI FIRE-FIRE PROTECTION INSPECTION AND BAG TRIP 3 1, 2 IP Fire Protection [Triennial]7111105T11/03/2014 12/05/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.